| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - H & S CONSTRUCTION CO., INC. |
- 3 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 4 - PRAIRIE CONTRACTORS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
41   |
SQYD |
20.00 |
820.00 |
12.00 |
492.00 |
21.00 |
861.00 |
30.00 |
1,230.00 |
| 202-02-I |
removal of cross drain pipe arch (24" equiv. cmpa)
|
41   |
LNFT |
50.00 |
2,050.00 |
23.00 |
943.00 |
37.00 |
1,517.00 |
50.00 |
2,050.00 |
| 202-02-J |
removal of cross drain pipe arch (36" equiv. cmpa)
|
82   |
LNFT |
50.00 |
4,100.00 |
29.00 |
2,378.00 |
42.00 |
3,444.00 |
50.00 |
4,100.00 |
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
12.00 |
2,400.00 |
12.00 |
2,400.00 |
12.60 |
2,520.00 |
15.00 |
3,000.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
200   |
CUYD |
12.00 |
2,400.00 |
12.00 |
2,400.00 |
12.60 |
2,520.00 |
15.00 |
3,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
1.00 |
6.00 |
80.00 |
480.00 |
460.00 |
2,760.00 |
1,000.00 |
6,000.00 |
| 303-01-C |
in-place cement stabilized base course (10" thick)
|
35,817   |
SQYD |
5.50 |
196,993.50 |
5.20 |
186,248.40 |
5.80 |
207,738.60 |
6.50 |
232,810.50 |
| 303-02 |
removal of existing patches
|
250   |
SQYD |
1.00 |
250.00 |
15.00 |
3,750.00 |
12.50 |
3,125.00 |
15.00 |
3,750.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
739   |
CUYD |
22.00 |
16,258.00 |
31.00 |
22,909.00 |
66.58 |
49,202.62 |
10.00 |
7,390.00 |
| 502-01 |
superpave asphaltic concrete
|
6,604.1 |
TON |
85.00 |
561,348.50 |
76.00 |
501,911.60 |
85.00 |
561,348.50 |
85.00 |
561,348.50 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
400.0 |
TON |
35.00 |
14,000.00 |
100.00 |
40,000.00 |
93.00 |
37,200.00 |
35.00 |
14,000.00 |
| 509-01 |
cold planing asphaltic pavement
|
27,954   |
SQYD |
0.20 |
5,590.80 |
1.90 |
53,112.60 |
0.50 |
13,977.00 |
2.00 |
55,908.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,019   |
CUYD |
0.01 |
- 10.19 |
0.01 |
- 10.19 |
2.15 |
- 2,190.85 |
0.01 |
- 10.19 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
40   |
LNFT |
150.00 |
6,000.00 |
108.00 |
4,320.00 |
157.50 |
6,300.00 |
150.00 |
6,000.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
80   |
LNFT |
175.00 |
14,000.00 |
133.00 |
10,640.00 |
210.00 |
16,800.00 |
300.00 |
24,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,300.00 |
4,300.00 |
15,000.00 |
15,000.00 |
3,116.00 |
3,116.00 |
5,000.00 |
5,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.899 |
MILE |
1.00 |
7.90 |
325.00 |
2,567.18 |
114.50 |
904.44 |
1.00 |
7.90 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.014 |
MILE |
0.01 |
0.04 |
318.78 |
1,279.58 |
315.00 |
1,264.41 |
1.00 |
4.01 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.625 |
MILE |
0.01 |
0.15 |
574.18 |
8,397.38 |
630.00 |
9,213.75 |
1.00 |
14.63 |
| 722-02 |
project site laboratory(equipped)
|
1   |
EACH |
3,500.00 |
3,500.00 |
4,500.00 |
4,500.00 |
3,675.00 |
3,675.00 |
4,000.00 |
4,000.00 |
| 726-01 |
bedding material
|
25.0 |
CUYD |
75.00 |
1,875.00 |
78.00 |
1,950.00 |
105.00 |
2,625.00 |
100.00 |
2,500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
72,000.00 |
72,000.00 |
45,000.00 |
45,000.00 |
35,000.00 |
35,000.00 |
80,000.00 |
80,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
75.00 |
600.00 |
87.00 |
696.00 |
83.00 |
664.00 |
150.00 |
1,200.00 |
| 731-02 |
reflectorized raised pavement markers
|
352   |
EACH |
4.50 |
1,584.00 |
5.92 |
2,083.84 |
4.75 |
1,672.00 |
5.00 |
1,760.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.313 |
MILE |
2,150.00 |
15,722.95 |
2,563.34 |
18,745.71 |
2,257.50 |
16,509.10 |
2,300.00 |
16,819.90 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.007 |
MILE |
700.00 |
1,404.90 |
942.39 |
1,891.38 |
735.00 |
1,475.15 |
800.00 |
1,605.60 |
| 735-01 |
mailboxes
|
25   |
EACH |
1.00 |
25.00 |
11.60 |
290.00 |
1.05 |
26.25 |
1.00 |
25.00 |
| 735-02 |
mailbox supports (single)
|
25   |
EACH |
119.00 |
2,975.00 |
145.04 |
3,626.00 |
124.95 |
3,123.75 |
200.00 |
5,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,500.00 |
3,500.00 |
2,148.00 |
2,148.00 |
100.00 |
100.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
20,242.00 |
20,242.00 |
100.00 |
100.00 |
| S-001 |
full depth sawcutting of existing portland cement
concrete drives |
181   |
inFT |
10.00 |
1,810.00 |
2.50 |
452.50 |
3.15 |
570.15 |
3.00 |
543.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
947,011.55 |
|
956,953.98 |
|
1,009,351.87 |
|
1,043,256.85 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
41   |
SQYD |
35.00 |
1,435.00 |
|
|
|
|
|
|
| 202-02-I |
removal of cross drain pipe arch (24" equiv. cmpa)
|
41   |
LNFT |
35.00 |
1,435.00 |
|
|
|
|
|
|
| 202-02-J |
removal of cross drain pipe arch (36" equiv. cmpa)
|
82   |
LNFT |
20.00 |
1,640.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
35.00 |
7,000.00 |
|
|
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
200   |
CUYD |
35.00 |
7,000.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
270.00 |
1,620.00 |
|
|
|
|
|
|
| 303-01-C |
in-place cement stabilized base course (10" thick)
|
35,817   |
SQYD |
5.89 |
210,962.13 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
250   |
SQYD |
7.00 |
1,750.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
739   |
CUYD |
65.00 |
48,035.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,604.1 |
TON |
85.00 |
561,348.50 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
400.0 |
TON |
180.00 |
72,000.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
27,954   |
SQYD |
1.75 |
48,919.50 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,019   |
CUYD |
0.01 |
- 10.19 |
|
|
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
40   |
LNFT |
220.00 |
8,800.00 |
|
|
|
|
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
80   |
LNFT |
225.00 |
18,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.899 |
MILE |
325.00 |
2,567.18 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.014 |
MILE |
300.00 |
1,204.20 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.625 |
MILE |
500.00 |
7,312.50 |
|
|
|
|
|
|
| 722-02 |
project site laboratory(equipped)
|
1   |
EACH |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
25.0 |
CUYD |
100.00 |
2,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
65.00 |
520.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
352   |
EACH |
5.50 |
1,936.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.313 |
MILE |
2,300.00 |
16,819.90 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.007 |
MILE |
850.00 |
1,705.95 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
25   |
EACH |
50.00 |
1,250.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
25   |
EACH |
150.00 |
3,750.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
60,000.00 |
60,000.00 |
|
|
|
|
|
|
| S-001 |
full depth sawcutting of existing portland cement
concrete drives |
181   |
inFT |
10.00 |
1,810.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,164,810.67 |
|
|
|
|
|
|
|