Letting of 2/28/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 801-34-0003
Parish: ACADIA
Routes: LA 1108
Description: JCT LA 95 - JCT LA 358
Type Const: grading, drainage structures, cold planing asphaltic concrete, in-place stabilized
base course, superpave asphaltic concrete pavement and related work
Estimated Construction Cost: $1,283,226.65
 
RankLicenseBidderConstruction Bid
1 08815 W. E. MCDONALD & SON, LLC. $947,011.55
2 04089 H & S CONSTRUCTION CO., INC. $956,953.98
3 00183 R. E. HEIDT CONSTRUCTION CO., INC. $1,009,351.87
4 34356 PRAIRIE CONTRACTORS INC. $1,043,256.85
5 12312 GILCHRIST CONSTRUCTION CO. LLC $1,164,810.67
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
H & S CONSTRUCTION CO., INC.
- 3 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 41      SQYD 20.00 820.00 12.00 492.00 21.00 861.00 30.00 1,230.00
202-02-I removal of cross drain pipe arch (24" equiv. cmpa) 41      LNFT 50.00 2,050.00 23.00 943.00 37.00 1,517.00 50.00 2,050.00
202-02-J removal of cross drain pipe arch (36" equiv. cmpa) 82      LNFT 50.00 4,100.00 29.00 2,378.00 42.00 3,444.00 50.00 4,100.00
203-08 borrow (vehicular measurement) 200      CUYD 12.00 2,400.00 12.00 2,400.00 12.60 2,520.00 15.00 3,000.00
203-08-A borrow (vehicular meas.)(selected soils) 200      CUYD 12.00 2,400.00 12.00 2,400.00 12.60 2,520.00 15.00 3,000.00
204-05-A temporary sediment check dams (hay) 6      EACH 1.00 6.00 80.00 480.00 460.00 2,760.00 1,000.00 6,000.00
303-01-C in-place cement stabilized base course (10" thick) 35,817      SQYD 5.50 196,993.50 5.20 186,248.40 5.80 207,738.60 6.50 232,810.50
303-02 removal of existing patches 250      SQYD 1.00 250.00 15.00 3,750.00 12.50 3,125.00 15.00 3,750.00
401-02 aggregate surface course (adjusted vehicular
measurement)
739      CUYD 22.00 16,258.00 31.00 22,909.00 66.58 49,202.62 10.00 7,390.00
502-01 superpave asphaltic concrete 6,604.1    TON 85.00 561,348.50 76.00 501,911.60 85.00 561,348.50 85.00 561,348.50
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
400.0    TON 35.00 14,000.00 100.00 40,000.00 93.00 37,200.00 35.00 14,000.00
509-01 cold planing asphaltic pavement 27,954      SQYD 0.20 5,590.80 1.90 53,112.60 0.50 13,977.00 2.00 55,908.00
509-02 contractor retained reclaimed asphaltic pavement - 1,019      CUYD 0.01 - 10.19 0.01 - 10.19 2.15 - 2,190.85 0.01 - 10.19
701-02-D cross drain pipe arch (24" equiv. rcpa) 40      LNFT 150.00 6,000.00 108.00 4,320.00 157.50 6,300.00 150.00 6,000.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 80      LNFT 175.00 14,000.00 133.00 10,640.00 210.00 16,800.00 300.00 24,000.00
713-01 temporary signs & barricades lump      LUMP 4,300.00 4,300.00 15,000.00 15,000.00 3,116.00 3,116.00 5,000.00 5,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.899  MILE 1.00 7.90 325.00 2,567.18 114.50 904.44 1.00 7.90
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
4.014  MILE 0.01 0.04 318.78 1,279.58 315.00 1,264.41 1.00 4.01
713-05-A temporary pavement markings (solid line)(4" width) 14.625  MILE 0.01 0.15 574.18 8,397.38 630.00 9,213.75 1.00 14.63
722-02 project site laboratory(equipped) 1      EACH 3,500.00 3,500.00 4,500.00 4,500.00 3,675.00 3,675.00 4,000.00 4,000.00
726-01 bedding material 25.0    CUYD 75.00 1,875.00 78.00 1,950.00 105.00 2,625.00 100.00 2,500.00
727-01 mobilization lump      LUMP 72,000.00 72,000.00 45,000.00 45,000.00 35,000.00 35,000.00 80,000.00 80,000.00
729-16-B object marker assembly (type 2) 8      EACH 75.00 600.00 87.00 696.00 83.00 664.00 150.00 1,200.00
731-02 reflectorized raised pavement markers 352      EACH 4.50 1,584.00 5.92 2,083.84 4.75 1,672.00 5.00 1,760.00
732-02-A plastic pavement striping (solid line) (4" width) 7.313  MILE 2,150.00 15,722.95 2,563.34 18,745.71 2,257.50 16,509.10 2,300.00 16,819.90
732-03-A plastic pavement striping (broken line)(4" width) 2.007  MILE 700.00 1,404.90 942.39 1,891.38 735.00 1,475.15 800.00 1,605.60
735-01 mailboxes 25      EACH 1.00 25.00 11.60 290.00 1.05 26.25 1.00 25.00
735-02 mailbox supports (single) 25      EACH 119.00 2,975.00 145.04 3,626.00 124.95 3,123.75 200.00 5,000.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 3,500.00 3,500.00 2,148.00 2,148.00 100.00 100.00
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 20,242.00 20,242.00 100.00 100.00
S-001 full depth sawcutting of existing portland cement
concrete drives
181      inFT 10.00 1,810.00 2.50 452.50 3.15 570.15 3.00 543.00
                       
 CONTRACTOR TOTAL       947,011.55   956,953.98   1,009,351.87   1,043,256.85
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 41      SQYD 35.00 1,435.00            
202-02-I removal of cross drain pipe arch (24" equiv. cmpa) 41      LNFT 35.00 1,435.00            
202-02-J removal of cross drain pipe arch (36" equiv. cmpa) 82      LNFT 20.00 1,640.00            
203-08 borrow (vehicular measurement) 200      CUYD 35.00 7,000.00            
203-08-A borrow (vehicular meas.)(selected soils) 200      CUYD 35.00 7,000.00            
204-05-A temporary sediment check dams (hay) 6      EACH 270.00 1,620.00            
303-01-C in-place cement stabilized base course (10" thick) 35,817      SQYD 5.89 210,962.13            
303-02 removal of existing patches 250      SQYD 7.00 1,750.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
739      CUYD 65.00 48,035.00            
502-01 superpave asphaltic concrete 6,604.1    TON 85.00 561,348.50            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
400.0    TON 180.00 72,000.00            
509-01 cold planing asphaltic pavement 27,954      SQYD 1.75 48,919.50            
509-02 contractor retained reclaimed asphaltic pavement - 1,019      CUYD 0.01 - 10.19            
701-02-D cross drain pipe arch (24" equiv. rcpa) 40      LNFT 220.00 8,800.00            
701-02-F cross drain pipe arch (36" equiv. rcpa) 80      LNFT 225.00 18,000.00            
713-01 temporary signs & barricades lump      LUMP 6,000.00 6,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.899  MILE 325.00 2,567.18            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
4.014  MILE 300.00 1,204.20            
713-05-A temporary pavement markings (solid line)(4" width) 14.625  MILE 500.00 7,312.50            
722-02 project site laboratory(equipped) 1      EACH 7,500.00 7,500.00            
726-01 bedding material 25.0    CUYD 100.00 2,500.00            
727-01 mobilization lump      LUMP 50,000.00 50,000.00            
729-16-B object marker assembly (type 2) 8      EACH 65.00 520.00            
731-02 reflectorized raised pavement markers 352      EACH 5.50 1,936.00            
732-02-A plastic pavement striping (solid line) (4" width) 7.313  MILE 2,300.00 16,819.90            
732-03-A plastic pavement striping (broken line)(4" width) 2.007  MILE 850.00 1,705.95            
735-01 mailboxes 25      EACH 50.00 1,250.00            
735-02 mailbox supports (single) 25      EACH 150.00 3,750.00            
740-01 construction layout lump      LUMP 10,000.00 10,000.00            
744-01 traffic control management lump      LUMP 60,000.00 60,000.00            
S-001 full depth sawcutting of existing portland cement
concrete drives
181      inFT 10.00 1,810.00            
                       
 CONTRACTOR TOTAL       1,164,810.67            