| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - H & S CONSTRUCTION CO., INC. |
- 3 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 4 - PRAIRIE CONTRACTORS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of cross drain pipe arch(24" equiv. cmpa)
|
48   |
LNFT |
28.00 |
1,344.00 |
15.00 |
720.00 |
36.75 |
1,764.00 |
60.00 |
2,880.00 |
| 202-02-J |
removal of cross drain pipe arch(60" equiv. cmpa)
|
48   |
LNFT |
28.00 |
1,344.00 |
26.00 |
1,248.00 |
63.00 |
3,024.00 |
60.00 |
2,880.00 |
| 203-08 |
borrow (vehicular measurement)
|
250   |
CUYD |
12.00 |
3,000.00 |
10.00 |
2,500.00 |
12.60 |
3,150.00 |
15.00 |
3,750.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
100   |
CUYD |
12.00 |
1,200.00 |
10.00 |
1,000.00 |
12.60 |
1,260.00 |
15.00 |
1,500.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
1.00 |
6.00 |
80.00 |
480.00 |
400.00 |
2,400.00 |
800.00 |
4,800.00 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
41,031   |
SQYD |
4.50 |
184,639.50 |
5.20 |
213,361.20 |
4.64 |
190,383.84 |
6.00 |
246,186.00 |
| 303-02 |
removal of existing patches
|
200   |
SQYD |
1.00 |
200.00 |
18.00 |
3,600.00 |
25.00 |
5,000.00 |
20.00 |
4,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,235   |
CUYD |
22.00 |
27,170.00 |
25.00 |
30,875.00 |
72.00 |
88,920.00 |
40.00 |
49,400.00 |
| 502-01 |
superpave asphaltic concrete
|
7,528.0 |
TON |
79.00 |
594,712.00 |
76.00 |
572,128.00 |
84.00 |
632,352.00 |
79.00 |
594,712.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
110.0 |
TON |
175.00 |
19,250.00 |
121.00 |
13,310.00 |
145.00 |
15,950.00 |
175.00 |
19,250.00 |
| 509-01 |
cold planing asphaltic pavement
|
35,700   |
SQYD |
0.99 |
35,343.00 |
1.90 |
67,830.00 |
0.50 |
17,850.00 |
1.86 |
66,402.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,860   |
CUYD |
0.01 |
- 18.60 |
0.01 |
- 18.60 |
1.50 |
- 2,790.00 |
0.01 |
- 18.60 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
48   |
LNFT |
150.00 |
7,200.00 |
89.00 |
4,272.00 |
156.00 |
7,488.00 |
180.00 |
8,640.00 |
| 701-02-J |
cross drain pipe arch (60" equiv. rcpa)
|
48   |
LNFT |
350.00 |
16,800.00 |
250.00 |
12,000.00 |
312.00 |
14,976.00 |
400.00 |
19,200.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,350.00 |
6,350.00 |
35,000.00 |
35,000.00 |
3,224.00 |
3,224.00 |
6,000.00 |
6,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.090 |
MILE |
1.00 |
9.09 |
325.00 |
2,954.25 |
90.00 |
818.10 |
1.00 |
9.09 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.003 |
MILE |
0.01 |
0.06 |
318.89 |
1,914.30 |
315.00 |
1,890.95 |
1.00 |
6.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
13.178 |
MILE |
0.01 |
0.13 |
574.00 |
7,564.17 |
630.00 |
8,302.14 |
1.00 |
13.18 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
3,500.00 |
3,500.00 |
3,500.00 |
3,500.00 |
3,675.00 |
3,675.00 |
5,000.00 |
5,000.00 |
| 726-01 |
bedding material
|
25.6 |
CUYD |
75.00 |
1,920.00 |
55.00 |
1,408.00 |
105.00 |
2,688.00 |
100.00 |
2,560.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
54,500.00 |
54,500.00 |
65,442.00 |
65,442.00 |
30,520.00 |
30,520.00 |
150,000.00 |
150,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
75.00 |
300.00 |
89.00 |
356.00 |
80.50 |
322.00 |
150.00 |
600.00 |
| 731-02 |
reflectorized raised pavement markers
|
405   |
EACH |
4.50 |
1,822.50 |
5.91 |
2,393.55 |
5.00 |
2,025.00 |
5.00 |
2,025.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.589 |
MILE |
2,150.00 |
14,166.35 |
2,562.72 |
16,885.76 |
2,257.50 |
14,874.67 |
2,400.00 |
15,813.60 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.001 |
MILE |
700.00 |
2,100.70 |
945.08 |
2,836.19 |
735.00 |
2,205.74 |
800.00 |
2,400.80 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
6,500.00 |
6,500.00 |
2,166.00 |
2,166.00 |
100.00 |
100.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
25,523.00 |
25,523.00 |
100.00 |
100.00 |
| S-001 |
cement treatment(12" thick)
|
20,442   |
SQYD |
4.05 |
82,790.10 |
4.00 |
81,768.00 |
6.50 |
132,873.00 |
5.78 |
118,154.76 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,069,648.83 |
|
1,176,827.82 |
|
1,212,835.44 |
|
1,326,363.83 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of cross drain pipe arch(24" equiv. cmpa)
|
48   |
LNFT |
25.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-J |
removal of cross drain pipe arch(60" equiv. cmpa)
|
48   |
LNFT |
25.00 |
1,200.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
250   |
CUYD |
30.00 |
7,500.00 |
|
|
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
100   |
CUYD |
30.00 |
3,000.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
6   |
EACH |
200.00 |
1,200.00 |
|
|
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
41,031   |
SQYD |
5.50 |
225,670.50 |
|
|
|
|
|
|
| 303-02 |
removal of existing patches
|
200   |
SQYD |
15.00 |
3,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,235   |
CUYD |
50.00 |
61,750.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,528.0 |
TON |
85.00 |
639,880.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
110.0 |
TON |
200.00 |
22,000.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
35,700   |
SQYD |
1.15 |
41,055.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,860   |
CUYD |
0.01 |
- 18.60 |
|
|
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
48   |
LNFT |
150.00 |
7,200.00 |
|
|
|
|
|
|
| 701-02-J |
cross drain pipe arch (60" equiv. rcpa)
|
48   |
LNFT |
440.00 |
21,120.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.090 |
MILE |
325.00 |
2,954.25 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.003 |
MILE |
300.00 |
1,800.90 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
13.178 |
MILE |
500.00 |
6,589.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
25.6 |
CUYD |
100.00 |
2,560.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
85.00 |
340.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
405   |
EACH |
5.50 |
2,227.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.589 |
MILE |
2,300.00 |
15,154.70 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.001 |
MILE |
850.00 |
2,550.85 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
75,000.00 |
75,000.00 |
|
|
|
|
|
|
| S-001 |
cement treatment(12" thick)
|
20,442   |
SQYD |
6.00 |
122,652.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,329,086.10 |
|
|
|
|
|
|
|