Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 2/28/2007 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 713-35-0122
Parish: NATCHITOCHES
Routes:
Description: EMMANUAL ROAD BRIDGE REHABILITATION
Type Const: remove and reinstall 2 spans, drive new concrete pile, replace cap, and related
work.
Estimated Construction Cost: $104,257.50
 
RankLicenseBidderConstruction Bid
1 12136 SHILOH CONTRACTORS, INC. $124,315.00
2 44111 CONSTRUCTING SOLUTIONS LLC $149,230.00
3 23112 BEN ALLEN, INC. $170,490.00
4 18546 C W & W CONTRACTORS, INC. $194,865.00
5 09090 GUINN BROTHERS, LLC. $220,575.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
SHILOH CONTRACTORS, INC.
- 2 -
CONSTRUCTING SOLUTIONS LLC
- 3 -
BEN ALLEN, INC.
- 4 -
C W & W CONTRACTORS, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 11,000.00 11,000.00 15,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00
202-02-I removal of debris lump      LUMP 8,500.00 8,500.00 10,000.00 10,000.00 5,000.00 5,000.00 10,000.00 10,000.00
711-01-D riprap (55 lb, 18" thick) 205      SQYD 80.00 16,400.00 80.00 16,400.00 125.00 25,625.00 100.00 20,500.00
711-04 geotextile fabric 205      SQYD 3.00 615.00 6.00 1,230.00 3.00 615.00 3.00 615.00
713-01 temporary signs & barricades lump      LUMP 3,000.00 3,000.00 10,000.00 10,000.00 5,000.00 5,000.00 10,000.00 10,000.00
727-01 mobilization lump      LUMP 40,800.00 40,800.00 35,000.00 35,000.00 25,000.00 25,000.00 20,000.00 20,000.00
740-01 construction layout lump      LUMP 1,500.00 1,500.00 5,000.00 5,000.00 3,500.00 3,500.00 5,000.00 5,000.00
804-01-B-01 precast concrete piles (14")(2 @ 75') 150      LNFT 55.00 8,250.00 100.00 15,000.00 125.00 18,750.00 325.00 48,750.00
S-101 remove and reinstall spans 2      EACH 10,000.00 20,000.00 5,000.00 10,000.00 20,000.00 40,000.00 20,000.00 40,000.00
S-102 reinforced concrete cap 1      EACH 6,000.00 6,000.00 15,000.00 15,000.00 8,000.00 8,000.00 8,000.00 8,000.00
S-103 tie rods 8      EACH 50.00 400.00 200.00 1,600.00 500.00 4,000.00 1,000.00 8,000.00
S-104 relaying existing riprap lump      LUMP 5,350.00 5,350.00 10,000.00 10,000.00 20,000.00 20,000.00 4,000.00 4,000.00
S-105 cleaning and resealing longitudinal and transverse
joints
lump      LUMP 2,500.00 2,500.00 5,000.00 5,000.00 5,000.00 5,000.00 10,000.00 10,000.00
                       
 CONTRACTOR TOTAL       124,315.00   149,230.00   170,490.00   194,865.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
GUINN BROTHERS, LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00            
202-02-I removal of debris lump      LUMP 10,000.00 10,000.00            
711-01-D riprap (55 lb, 18" thick) 205      SQYD 105.00 21,525.00            
711-04 geotextile fabric 205      SQYD 10.00 2,050.00            
713-01 temporary signs & barricades lump      LUMP 13,000.00 13,000.00            
727-01 mobilization lump      LUMP 38,000.00 38,000.00            
740-01 construction layout lump      LUMP 4,500.00 4,500.00            
804-01-B-01 precast concrete piles (14")(2 @ 75') 150      LNFT 168.00 25,200.00            
S-101 remove and reinstall spans 2      EACH 25,000.00 50,000.00            
S-102 reinforced concrete cap 1      EACH 12,500.00 12,500.00            
S-103 tie rods 8      EACH 850.00 6,800.00            
S-104 relaying existing riprap lump      LUMP 15,000.00 15,000.00            
S-105 cleaning and resealing longitudinal and transverse
joints
lump      LUMP 12,000.00 12,000.00            
                       
 CONTRACTOR TOTAL       220,575.00            