| 202-02-A |
removal of bridges
|
2   |
EACH |
200,000.00 |
400,000.00 |
188,000.00 |
376,000.00 |
200,000.00 |
400,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
586   |
SQYD |
25.00 |
14,650.00 |
34.00 |
19,924.00 |
15.00 |
8,790.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
4,917.8 |
LNFT |
6.00 |
29,506.80 |
11.00 |
54,095.80 |
5.00 |
24,589.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
3,611.5 |
SQYD |
10.00 |
36,115.00 |
21.00 |
75,841.50 |
10.00 |
36,115.00 |
|
|
| 202-02-H |
removal of guard rail
|
622   |
LNFT |
5.00 |
3,110.00 |
6.00 |
3,732.00 |
15.00 |
9,330.00 |
|
|
| 202-02-01 |
removal of abutment (median return, end dam and flares)
|
lump |
LUMP |
20,000.00 |
20,000.00 |
13,000.00 |
13,000.00 |
24,000.00 |
24,000.00 |
|
|
| 202-02-02 |
removal of concrete approach slabs
|
253.04 |
SQYD |
35.00 |
8,856.40 |
52.00 |
13,158.08 |
30.00 |
7,591.20 |
|
|
| 202-02-03 |
removal of catch basins
|
5   |
EACH |
1,000.00 |
5,000.00 |
1,300.00 |
6,500.00 |
1,000.00 |
5,000.00 |
|
|
| 202-02-04 |
removal of fascia mounted sign of bridge
|
3   |
EACH |
2,500.00 |
7,500.00 |
600.00 |
1,800.00 |
5,000.00 |
15,000.00 |
|
|
| 202-03-01 |
relocation of overhead cantilever sign (left of sta.
196+00.72) |
1   |
EACH |
2,500.00 |
2,500.00 |
14,000.00 |
14,000.00 |
45,000.00 |
45,000.00 |
|
|
| 202-03-02 |
relocation of cb-06 (right of sta. 251+50.46 ramp "e")
|
1   |
EACH |
3,000.00 |
3,000.00 |
1,100.00 |
1,100.00 |
12,000.00 |
12,000.00 |
|
|
| 202-03-03 |
relocation of impact attenuator
|
1   |
EACH |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
|
|
| 203-01 |
general excavation
|
4,469   |
CUYD |
20.00 |
89,380.00 |
18.00 |
80,442.00 |
15.00 |
67,035.00 |
|
|
| 203-04 |
embankment
|
3,161   |
CUYD |
35.00 |
110,635.00 |
30.00 |
94,830.00 |
30.00 |
94,830.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,136   |
LNFT |
2.50 |
2,840.00 |
2.60 |
2,953.60 |
4.00 |
4,544.00 |
|
|
| 302-02-B |
class ii base course (8 1/2" thick)
|
359.3 |
SQYD |
54.00 |
19,402.20 |
78.00 |
28,025.40 |
45.00 |
16,168.50 |
|
|
| 302-02-D |
class ii base course (12" thick)
|
1,958.0 |
SQYD |
60.00 |
117,480.00 |
60.00 |
117,480.00 |
45.00 |
88,110.00 |
|
|
| 304-01 |
lime
|
16.43 |
TON |
160.00 |
2,628.80 |
325.00 |
5,339.75 |
300.00 |
4,929.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,159   |
SQYD |
6.00 |
6,954.00 |
35.00 |
40,565.00 |
6.00 |
6,954.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
65.00 |
32,500.00 |
100.00 |
50,000.00 |
75.00 |
37,500.00 |
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
284.6 |
SQYD |
80.00 |
22,768.00 |
60.00 |
17,076.00 |
85.00 |
24,191.00 |
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
1,561.4 |
SQYD |
75.00 |
117,105.00 |
78.00 |
121,789.20 |
90.00 |
140,526.00 |
|
|
| 601-03-C |
portland cement concrete shoulder (6" thick)
|
359.3 |
SQYD |
56.00 |
20,120.80 |
52.00 |
18,683.60 |
65.00 |
23,354.50 |
|
|
| 701-10-F |
reinforced concrete pipe (extension) (15" diameter)
|
8   |
LF |
120.00 |
960.00 |
25.00 |
200.00 |
250.00 |
2,000.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
700.00 |
700.00 |
120.00 |
120.00 |
1,500.00 |
1,500.00 |
|
|
| 702-04-B |
adjusting catch basins
|
9   |
EACH |
1,800.00 |
16,200.00 |
750.00 |
6,750.00 |
6,000.00 |
54,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
250.0 |
LNFT |
20.00 |
5,000.00 |
64.00 |
16,000.00 |
22.00 |
5,500.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
150.0 |
LNFT |
55.00 |
8,250.00 |
76.00 |
11,400.00 |
56.00 |
8,400.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,200.00 |
4,400.00 |
2,200.00 |
4,400.00 |
2,300.00 |
4,600.00 |
|
|
| 704-11-C |
guard rail end treatment (bi-directional)
|
2   |
EACH |
4,200.00 |
8,400.00 |
4,200.00 |
8,400.00 |
4,400.00 |
8,800.00 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
842.0 |
SQYD |
60.00 |
50,520.00 |
28.00 |
23,576.00 |
90.00 |
75,780.00 |
|
|
| 707-01 |
concrete curb
|
1,495.0 |
LNFT |
10.00 |
14,950.00 |
13.00 |
19,435.00 |
10.00 |
14,950.00 |
|
|
| 707-03 |
combination curb and gutter
|
675.5 |
LNFT |
30.00 |
20,265.00 |
15.00 |
10,132.50 |
30.00 |
20,265.00 |
|
|
| 707-04 |
asphaltic curb
|
173.0 |
LNFT |
98.00 |
16,954.00 |
115.00 |
19,895.00 |
25.00 |
4,325.00 |
|
|
| 711-01-B |
riprap (10 lb, 10" thick)
|
53   |
SQYD |
120.00 |
6,360.00 |
38.00 |
2,014.00 |
100.00 |
5,300.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
525   |
SQYD |
56.00 |
29,400.00 |
38.00 |
19,950.00 |
80.00 |
42,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
311   |
LNFT |
0.50 |
155.50 |
0.50 |
155.50 |
0.45 |
139.95 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
360   |
LNFT |
1.40 |
504.00 |
1.60 |
576.00 |
1.50 |
540.00 |
|
|
| 713-04-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
1.061 |
MILE |
4,000.00 |
4,244.00 |
3,540.00 |
3,755.94 |
355.00 |
376.66 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
3.023 |
MILE |
12,000.00 |
36,276.00 |
13,900.00 |
42,019.70 |
12,000.00 |
36,276.00 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
4   |
EACH |
60.00 |
240.00 |
60.00 |
240.00 |
60.00 |
240.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
4   |
EACH |
60.00 |
240.00 |
60.00 |
240.00 |
60.00 |
240.00 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
400   |
EACH |
5.00 |
2,000.00 |
6.00 |
2,400.00 |
6.00 |
2,400.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
3.60 |
ACRE |
1,000.00 |
3,600.00 |
1,000.00 |
3,600.00 |
725.00 |
2,610.00 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
162   |
SQYD |
2.50 |
405.00 |
2.50 |
405.00 |
3.00 |
486.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
|
|
| 724-02 |
pavement widening
|
5,516.8 |
SQYD |
58.00 |
319,974.40 |
56.00 |
308,940.80 |
95.00 |
524,096.00 |
|
|
| 725-02 |
temporary detour roads
|
1,302.2 |
SQYD |
120.00 |
156,264.00 |
310.00 |
403,682.00 |
130.00 |
169,286.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
550,000.00 |
550,000.00 |
402,000.00 |
402,000.00 |
700,000.00 |
700,000.00 |
|
|
| 729-01-01 |
sign (type a)(r10-12)
|
5.0 |
SQFT |
35.00 |
175.00 |
52.00 |
260.00 |
80.00 |
400.00 |
|
|
| 729-01-02 |
sign (type a)(r3-1)(24" x 24")
|
4.0 |
SQFT |
35.00 |
140.00 |
65.00 |
260.00 |
80.00 |
320.00 |
|
|
| 729-01-03 |
sign (type a)(r3-5)(30" x 36")
|
15.0 |
SQFT |
35.00 |
525.00 |
50.00 |
750.00 |
80.00 |
1,200.00 |
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
3   |
EACH |
5,800.00 |
17,400.00 |
7,700.00 |
23,100.00 |
6,500.00 |
19,500.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
70.00 |
560.00 |
70.00 |
560.00 |
80.00 |
640.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
205   |
EACH |
5.20 |
1,066.00 |
5.20 |
1,066.00 |
5.50 |
1,127.50 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
974   |
LNFT |
0.90 |
876.60 |
1.00 |
974.00 |
1.00 |
974.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
441   |
LNFT |
2.70 |
1,190.70 |
2.70 |
1,190.70 |
3.00 |
1,323.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.924 |
MILE |
2,650.00 |
5,098.60 |
2,600.00 |
5,002.40 |
2,700.00 |
5,194.80 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.354 |
MILE |
1,000.00 |
354.00 |
1,000.00 |
354.00 |
1,000.00 |
354.00 |
|
|
| 732-05 |
removal of existing markings
|
0.874 |
MILE |
5,700.00 |
4,981.80 |
5,000.00 |
4,370.00 |
6,000.00 |
5,244.00 |
|
|
| 736-01 |
trenching and backfilling
|
445   |
LNFT |
4.00 |
1,780.00 |
3.50 |
1,557.50 |
4.00 |
1,780.00 |
|
|
| 736-03 |
jacked or bored conduit (3" p.e.c.)
|
155   |
LNFT |
23.00 |
3,565.00 |
29.00 |
4,495.00 |
28.00 |
4,340.00 |
|
|
| 736-04-01 |
signal support (30' steel strain pole)
|
2   |
EACH |
6,000.00 |
12,000.00 |
9,000.00 |
18,000.00 |
10,000.00 |
20,000.00 |
|
|
| 736-04-02 |
signal support (15' timber pole)
|
2   |
EACH |
1,100.00 |
2,200.00 |
1,525.00 |
3,050.00 |
1,800.00 |
3,600.00 |
|
|
| 736-05-01 |
signal head (3 section, r, y, g)
|
4   |
EACH |
850.00 |
3,400.00 |
1,000.00 |
4,000.00 |
1,200.00 |
4,800.00 |
|
|
| 736-05-02 |
signal head (3 section, r,lt y,lt g)
|
3   |
EACH |
870.00 |
2,610.00 |
900.00 |
2,700.00 |
900.00 |
2,700.00 |
|
|
| 736-05-03 |
signal head (5 section, r,y,g,lt y,lt g)
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
1,600.00 |
1,600.00 |
|
|
| 736-06 |
signal service
|
1   |
EACH |
1,800.00 |
1,800.00 |
1,800.00 |
1,800.00 |
1,900.00 |
1,900.00 |
|
|
| 736-08 |
signal controller
|
1   |
EACH |
20,000.00 |
20,000.00 |
19,760.00 |
19,760.00 |
20,000.00 |
20,000.00 |
|
|
| 736-10-01 |
underground junction box
|
2   |
EACH |
400.00 |
800.00 |
560.00 |
1,120.00 |
600.00 |
1,200.00 |
|
|
| 736-10-02 |
underground junction box
|
7   |
EACH |
700.00 |
4,900.00 |
670.00 |
4,690.00 |
700.00 |
4,900.00 |
|
|
| 736-10-03 |
underground junction box
|
2   |
EACH |
830.00 |
1,660.00 |
1,150.00 |
2,300.00 |
1,200.00 |
2,400.00 |
|
|
| 736-11-01 |
conduit (2" p.e.c.)
|
390   |
LNFT |
4.20 |
1,638.00 |
5.15 |
2,008.50 |
6.00 |
2,340.00 |
|
|
| 736-11-02 |
conduit (3" p.e.c.)
|
250   |
LNFT |
6.30 |
1,575.00 |
6.60 |
1,650.00 |
7.00 |
1,750.00 |
|
|
| 736-12-01 |
conductor (6c, signal #14 awg)
|
510   |
LNFT |
2.00 |
1,020.00 |
2.00 |
1,020.00 |
2.50 |
1,275.00 |
|
|
| 736-12-02 |
conductor (10c, signal,#14 awg)
|
800   |
LNFT |
2.60 |
2,080.00 |
2.50 |
2,000.00 |
3.00 |
2,400.00 |
|
|
| 736-12-03 |
conductor (3c, signal,#6 awg, thhn/thwn)
|
615   |
LNFT |
5.00 |
3,075.00 |
5.00 |
3,075.00 |
5.00 |
3,075.00 |
|
|
| 739-01 |
hydro-seeding
|
3.60 |
ACRE |
950.00 |
3,420.00 |
950.00 |
3,420.00 |
1,100.00 |
3,960.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
250,000.00 |
250,000.00 |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
82,000.00 |
82,000.00 |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
|
|
| 804-01-B |
precast concrete piles (14" diameter)
|
410   |
LNFT |
170.00 |
69,700.00 |
170.00 |
69,700.00 |
100.00 |
41,000.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
75.11 |
CUYD |
1,500.00 |
112,665.00 |
2,400.00 |
180,264.00 |
3,000.00 |
225,330.00 |
|
|
| 805-03 |
class aa concrete
|
666.04 |
CUYD |
750.00 |
499,530.00 |
1,100.00 |
732,644.00 |
1,500.00 |
999,060.00 |
|
|
| 805-11 |
strip seal joints
|
546.00 |
LNFT |
150.00 |
81,900.00 |
130.00 |
70,980.00 |
125.00 |
68,250.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
254,165   |
LB |
1.00 |
254,165.00 |
0.90 |
228,748.50 |
1.00 |
254,165.00 |
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
800,000.00 |
800,000.00 |
800,000.00 |
800,000.00 |
1,200,000.00 |
1,200,000.00 |
|
|
| 810-01 |
concrete railing (type f-shaped pl2)
|
1,440.00 |
LNFT |
56.00 |
80,640.00 |
75.00 |
108,000.00 |
90.00 |
129,600.00 |
|
|
| 813-01 |
concrete approach slabs
|
362.92 |
SQYD |
180.00 |
65,325.60 |
220.00 |
79,842.40 |
300.00 |
108,876.00 |
|
|
| 814-01-D |
drilled shaft (36" diameter)
|
150.0 |
LNFT |
400.00 |
60,000.00 |
130.00 |
19,500.00 |
1,000.00 |
150,000.00 |
|
|
| S-001 |
sawcutting
|
57,821   |
INFT |
1.30 |
75,167.30 |
1.00 |
57,821.00 |
1.00 |
57,821.00 |
|
|
| S-002 |
dynamic message sign unit
|
4   |
EACH |
20,000.00 |
80,000.00 |
24,000.00 |
96,000.00 |
26,000.00 |
104,000.00 |
|
|
| S-003 |
removal, storage and replacement of existing roadway
signs |
lump |
LUMP |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
40,000.00 |
40,000.00 |
|
|
| S-004 |
adjusting guard rail
|
425.0 |
LF |
15.00 |
6,375.00 |
23.00 |
9,775.00 |
20.00 |
8,500.00 |
|
|
| S-005 |
pile protection
|
2   |
EACH |
40,000.00 |
80,000.00 |
30,000.00 |
60,000.00 |
40,000.00 |
80,000.00 |
|
|
| S-006 |
relocation of electrical transformer and conduits (lt.
of sta. 201+80.69) |
lump |
LUMP |
6,300.00 |
6,300.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-101 |
removal and handling of existing girders,diaphragms &
guardrail. |
lump |
LUMP |
170,000.00 |
170,000.00 |
240,000.00 |
240,000.00 |
80,000.00 |
80,000.00 |
|
|
| S-102 |
new anchor bolts (for deck joints) set in pre-drilled
holes on existing endwalls |
48   |
EACH |
90.00 |
4,320.00 |
105.00 |
5,040.00 |
200.00 |
9,600.00 |
|
|
| S-103 |
extension of existing anchor bolts (for girders)
|
192   |
EACH |
70.00 |
13,440.00 |
61.00 |
11,712.00 |
100.00 |
19,200.00 |
|
|
| S-104 |
new anchor bolts (for girders) set in pre-drilled
holes on existing portions of bent caps |
48   |
EACH |
90.00 |
4,320.00 |
70.00 |
3,360.00 |
200.00 |
9,600.00 |
|
|
| S-105 |
risers built with non-shrink grout
|
36   |
EACH |
300.00 |
10,800.00 |
360.00 |
12,960.00 |
350.00 |
12,600.00 |
|
|
| S-106 |
top flange treatment for re-used girders
|
92   |
EACH |
100.00 |
9,200.00 |
650.00 |
59,800.00 |
600.00 |
55,200.00 |
|
|
| S-107 |
bottom flange treatment for re-used girders
|
92   |
EACH |
500.00 |
46,000.00 |
725.00 |
66,700.00 |
600.00 |
55,200.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
5,524,752.50 |
|
5,927,503.37 |
|
7,171,967.11 |
|
|
| | NUMBER OF DAYS BID AT $1,000 PER DAY. |
|
|
|
470,000.00 |
|
470,000.00 |
|
465,000.00 |
|
|
| | TOTAL BID |
|
|
|
5,994,752.50 |
|
6,397,503.37 |
|
7,636,967.11 |
|
|
|