| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - AUSTIN BRIDGE & ROAD, LP |
- 4 - D & J CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
800,000.00 |
800,000.00 |
900,000.00 |
900,000.00 |
1,155,000.00 |
1,155,000.00 |
786,000.00 |
786,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
181,000.00 |
181,000.00 |
25,000.00 |
25,000.00 |
91,000.00 |
91,000.00 |
100,000.00 |
100,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
3,055   |
sq m |
6.00 |
18,330.00 |
8.00 |
24,440.00 |
20.00 |
61,100.00 |
12.00 |
36,660.00 |
| 202-02-D |
removal of concrete walks & drives
|
100   |
sq m |
15.00 |
1,500.00 |
14.00 |
1,400.00 |
12.00 |
1,200.00 |
12.00 |
1,200.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
10,221.6 |
sq m |
6.00 |
61,329.60 |
4.50 |
45,997.20 |
15.00 |
153,324.00 |
9.00 |
91,994.40 |
| 202-02-H |
removal of guard rail
|
228   |
ln m |
13.00 |
2,964.00 |
12.84 |
2,927.52 |
15.00 |
3,420.00 |
15.00 |
3,420.00 |
| 203-01 |
general excavation
|
278,049   |
cu m |
4.00 |
1,112,196.00 |
2.93 |
814,683.57 |
5.00 |
1,390,245.00 |
3.50 |
973,171.50 |
| 203-02 |
drainage excavation
|
7,110   |
cu m |
10.00 |
71,100.00 |
10.00 |
71,100.00 |
12.00 |
85,320.00 |
9.00 |
63,990.00 |
| 203-03 |
muck excavation
|
1,000   |
cu m |
12.00 |
12,000.00 |
20.00 |
20,000.00 |
14.00 |
14,000.00 |
11.00 |
11,000.00 |
| 203-04 |
embankment
|
309,163   |
cu m |
5.50 |
1,700,396.50 |
8.40 |
2,596,969.20 |
8.00 |
2,473,304.00 |
5.50 |
1,700,396.50 |
| 204-02 |
temporary hay or straw bales
|
1,000   |
ea |
10.00 |
10,000.00 |
30.00 |
30,000.00 |
8.00 |
8,000.00 |
7.00 |
7,000.00 |
| 204-03 |
temporary slope drains
|
1,266   |
ln m |
35.00 |
44,310.00 |
25.00 |
31,650.00 |
25.00 |
31,650.00 |
23.00 |
29,118.00 |
| 204-04 |
temporary sediment basins
|
2   |
ea |
550.00 |
1,100.00 |
1,000.00 |
2,000.00 |
300.00 |
600.00 |
300.00 |
600.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
451   |
ea |
150.00 |
67,650.00 |
200.00 |
90,200.00 |
80.00 |
36,080.00 |
80.00 |
36,080.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
26   |
ea |
500.00 |
13,000.00 |
1,000.00 |
26,000.00 |
350.00 |
9,100.00 |
350.00 |
9,100.00 |
| 204-06 |
temporary silt fencing
|
5,610   |
ln m |
7.00 |
39,270.00 |
10.00 |
56,100.00 |
6.00 |
33,660.00 |
6.00 |
33,660.00 |
| 204-07 |
temporary stone construction entrance
|
6   |
ea |
1,500.00 |
9,000.00 |
3,000.00 |
18,000.00 |
3,000.00 |
18,000.00 |
2,400.00 |
14,400.00 |
| 302-01-01 |
class ii base course (stone or recycled pccp)
|
24.6 |
cu m |
700.00 |
17,220.00 |
700.00 |
17,220.00 |
410.00 |
10,086.00 |
150.00 |
3,690.00 |
| 302-02-C-01 |
class ii base course (250 mm thick)(soil cement)
|
185,719.4 |
sq m |
12.50 |
2,321,492.50 |
12.50 |
2,321,492.50 |
9.00 |
1,671,474.60 |
14.00 |
2,600,071.60 |
| 302-02-E-02 |
class ii base course (100 mm thick)(stone or recycled
pccp) |
185,719.4 |
sq m |
11.00 |
2,042,913.40 |
12.00 |
2,228,632.80 |
10.00 |
1,857,194.00 |
12.25 |
2,275,062.65 |
| 304-01 |
lime
|
1,152.75 |
Mg |
172.00 |
198,273.00 |
1.00 |
1,152.75 |
195.00 |
224,786.25 |
125.00 |
144,093.75 |
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
76,154   |
sq m |
1.00 |
76,154.00 |
0.01 |
761.54 |
2.50 |
190,385.00 |
2.00 |
152,308.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
385.0 |
cu m |
42.00 |
16,170.00 |
110.00 |
42,350.00 |
175.00 |
67,375.00 |
75.00 |
28,875.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,000.0 |
cu m |
80.00 |
160,000.00 |
30.00 |
60,000.00 |
60.00 |
120,000.00 |
60.00 |
120,000.00 |
| 502-01 |
superpave asphaltic concrete
|
45,133.3 |
Mg |
70.00 |
3,159,331.00 |
75.00 |
3,384,997.50 |
100.00 |
4,513,330.00 |
90.00 |
4,061,997.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
10,296.4 |
Mg |
90.00 |
926,676.00 |
100.00 |
1,029,640.00 |
105.00 |
1,081,122.00 |
110.00 |
1,132,604.00 |
| 701-01-G |
cross drain pipe (450 mm rcp/pcp)
|
539.5 |
ln m |
250.00 |
134,875.00 |
200.00 |
107,900.00 |
150.00 |
80,925.00 |
160.00 |
86,320.00 |
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
294.0 |
ln m |
295.00 |
86,730.00 |
250.00 |
73,500.00 |
200.00 |
58,800.00 |
220.00 |
64,680.00 |
| 701-01-K |
cross drain pipe (750 mm rcp/pcp)
|
58.0 |
ln m |
405.00 |
23,490.00 |
300.00 |
17,400.00 |
250.00 |
14,500.00 |
275.00 |
15,950.00 |
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
301.0 |
ln m |
450.00 |
135,450.00 |
400.00 |
120,400.00 |
300.00 |
90,300.00 |
325.00 |
97,825.00 |
| 701-01-O |
cross drain pipe (1200 mm rcp/pcp)
|
224.0 |
ln m |
900.00 |
201,600.00 |
500.00 |
112,000.00 |
500.00 |
112,000.00 |
550.00 |
123,200.00 |
| 701-01-S |
cross drain pipe (1800 mm rcp/pcp)
|
583.0 |
ln m |
1,300.00 |
757,900.00 |
960.00 |
559,680.00 |
1,300.00 |
757,900.00 |
1,275.00 |
743,325.00 |
| 701-02-J |
cross drain pipe arch (1500 mm equiv. rcpa)
|
132.0 |
ln m |
950.00 |
125,400.00 |
850.00 |
112,200.00 |
850.00 |
112,200.00 |
900.00 |
118,800.00 |
| 701-05-G |
side drain pipe (450 mm)
|
213.0 |
ln m |
250.00 |
53,250.00 |
200.00 |
42,600.00 |
150.00 |
31,950.00 |
160.00 |
34,080.00 |
| 701-05-G-01 |
side drain pipe (450 mm)(bridge drain)
|
31.5 |
ln m |
250.00 |
7,875.00 |
340.00 |
10,710.00 |
150.00 |
4,725.00 |
160.00 |
5,040.00 |
| 701-05-I |
side drain pipe (600 mm)
|
142.0 |
ln m |
295.00 |
41,890.00 |
290.00 |
41,180.00 |
200.00 |
28,400.00 |
220.00 |
31,240.00 |
| 701-10-I |
reinforced concrete pipe (extension)(600 mm)
|
300.1 |
ln m |
400.00 |
120,040.00 |
310.00 |
93,031.00 |
420.00 |
126,042.00 |
450.00 |
135,045.00 |
| 701-10-K |
reinforced concrete pipe (extension)(750 mm)
|
32.9 |
ln m |
500.00 |
16,450.00 |
315.00 |
10,363.50 |
600.00 |
19,740.00 |
600.00 |
19,740.00 |
| 701-10-M |
reinforced concrete pipe (extension)(900 mm)
|
64.5 |
ln m |
565.00 |
36,442.50 |
390.00 |
25,155.00 |
655.00 |
42,247.50 |
700.00 |
45,150.00 |
| 701-10-N |
reinforced concrete pipe (extension)(1050 mm)
|
102.0 |
ln m |
765.00 |
78,030.00 |
520.00 |
53,040.00 |
740.00 |
75,480.00 |
800.00 |
81,600.00 |
| 701-10-O |
reinforced concrete pipe (extension)(1200 mm)
|
204.3 |
ln m |
945.00 |
193,063.50 |
600.00 |
122,580.00 |
820.00 |
167,526.00 |
850.00 |
173,655.00 |
| 701-11-I |
reinforced concrete pipe arch (extension)(600 mm
equiv.) |
30.0 |
ln m |
400.00 |
12,000.00 |
340.00 |
10,200.00 |
400.00 |
12,000.00 |
450.00 |
13,500.00 |
| 702-02-E |
manholes (r-cb-32)
|
1   |
ea |
9,500.00 |
9,500.00 |
5,800.00 |
5,800.00 |
6,000.00 |
6,000.00 |
5,500.00 |
5,500.00 |
| 702-02-F |
manholes (mh-01)
|
1   |
ea |
5,000.00 |
5,000.00 |
9,200.00 |
9,200.00 |
6,000.00 |
6,000.00 |
5,500.00 |
5,500.00 |
| 702-03-A |
catch basins (cb-01)
|
19   |
ea |
4,000.00 |
76,000.00 |
2,500.00 |
47,500.00 |
2,600.00 |
49,400.00 |
3,000.00 |
57,000.00 |
| 702-03-B |
catch basins (cb-02)
|
11   |
ea |
6,400.00 |
70,400.00 |
9,200.00 |
101,200.00 |
3,700.00 |
40,700.00 |
4,000.00 |
44,000.00 |
| 702-05-A |
cross drain end treatment (1 barrell, 450mm rcp)
|
2   |
ea |
2,400.00 |
4,800.00 |
1,600.00 |
3,200.00 |
1,600.00 |
3,200.00 |
1,700.00 |
3,400.00 |
| 702-05-B |
cross drain end treatment (1 barrell, 600mm rcp)
|
9   |
ea |
3,300.00 |
29,700.00 |
1,650.00 |
14,850.00 |
2,000.00 |
18,000.00 |
2,100.00 |
18,900.00 |
| 702-05-C |
cross drain end treatment (1 barrell, 750mm rcp)
|
2   |
ea |
3,600.00 |
7,200.00 |
1,800.00 |
3,600.00 |
2,500.00 |
5,000.00 |
2,600.00 |
5,200.00 |
| 702-05-D |
cross drain end treatment (1 barrell, 900mm rcp)
|
8   |
ea |
3,800.00 |
30,400.00 |
3,000.00 |
24,000.00 |
3,000.00 |
24,000.00 |
3,100.00 |
24,800.00 |
| 702-05-E |
cross drain end treatment (1 barrell, 1050mm rcp)
|
2   |
ea |
4,200.00 |
8,400.00 |
3,300.00 |
6,600.00 |
3,500.00 |
7,000.00 |
3,600.00 |
7,200.00 |
| 702-05-F |
cross drain end treatment (1 barrell, 1200mm rcp)
|
8   |
ea |
4,800.00 |
38,400.00 |
3,500.00 |
28,000.00 |
4,000.00 |
32,000.00 |
4,100.00 |
32,800.00 |
| 702-05-G |
cross drain end treatment (1 barrell, 1800mm rcp)
|
2   |
ea |
5,600.00 |
11,200.00 |
7,000.00 |
14,000.00 |
6,500.00 |
13,000.00 |
7,000.00 |
14,000.00 |
| 702-05-H |
cross drain end treatment (2 barrell, 600mm rcp)
|
2   |
ea |
6,700.00 |
13,400.00 |
3,000.00 |
6,000.00 |
3,800.00 |
7,600.00 |
4,000.00 |
8,000.00 |
| 702-05-I |
cross drain end treatment (2 barrell, 900mm rcp)
|
2   |
ea |
4,500.00 |
9,000.00 |
5,300.00 |
10,600.00 |
4,500.00 |
9,000.00 |
5,000.00 |
10,000.00 |
| 702-05-J |
cross drain end treatment (2 barrell, 1200mm rcp)
|
1   |
ea |
5,800.00 |
5,800.00 |
6,400.00 |
6,400.00 |
6,000.00 |
6,000.00 |
6,500.00 |
6,500.00 |
| 702-05-K |
cross drain end treatment (2 barrell, 1500mm equiv.
rcpa) |
2   |
ea |
6,700.00 |
13,400.00 |
7,200.00 |
14,400.00 |
7,000.00 |
14,000.00 |
7,500.00 |
15,000.00 |
| 702-05-L |
cross drain end treatment (3 barrell, 1800mm rcp)
|
2   |
ea |
8,700.00 |
17,400.00 |
11,300.00 |
22,600.00 |
15,000.00 |
30,000.00 |
15,500.00 |
31,000.00 |
| 702-05-M |
cross drain end treatment (4 barrell, 1800mm rcp)
|
2   |
ea |
13,500.00 |
27,000.00 |
12,300.00 |
24,600.00 |
19,000.00 |
38,000.00 |
20,000.00 |
40,000.00 |
| 702-08-A |
side drain safety end (type 1)
|
20   |
ea |
1,600.00 |
32,000.00 |
2,400.00 |
48,000.00 |
1,000.00 |
20,000.00 |
1,100.00 |
22,000.00 |
| 704-03 |
blocked out guard rail
|
461.02 |
ln m |
62.00 |
28,583.24 |
60.00 |
27,661.20 |
58.00 |
26,739.16 |
61.00 |
28,122.22 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
76.20 |
ln m |
190.00 |
14,478.00 |
190.00 |
14,478.00 |
180.00 |
13,716.00 |
161.00 |
12,268.20 |
| 704-11-A |
guard rail end treatment (flared)
|
10   |
ea |
2,200.00 |
22,000.00 |
2,200.00 |
22,000.00 |
2,000.00 |
20,000.00 |
2,250.00 |
22,500.00 |
| 705-01 |
barbed wire fence
|
500   |
ln m |
18.00 |
9,000.00 |
17.00 |
8,500.00 |
17.00 |
8,500.00 |
17.00 |
8,500.00 |
| 705-02 |
combination mesh & barbed wire fence
|
798   |
ln m |
22.00 |
17,556.00 |
20.00 |
15,960.00 |
20.00 |
15,960.00 |
21.00 |
16,758.00 |
| 705-04 |
single swinging driveway gates
|
5   |
ea |
250.00 |
1,250.00 |
570.00 |
2,850.00 |
800.00 |
4,000.00 |
300.00 |
1,500.00 |
| 705-05 |
double swinging driveway gates
|
5   |
dbgt |
550.00 |
2,750.00 |
800.00 |
4,000.00 |
1,300.00 |
6,500.00 |
550.00 |
2,750.00 |
| 708-01 |
right-of-way monument
|
6   |
ea |
105.00 |
630.00 |
325.00 |
1,950.00 |
150.00 |
900.00 |
500.00 |
3,000.00 |
| 708-02 |
right-of-way monument witness post
|
6   |
ea |
105.00 |
630.00 |
325.00 |
1,950.00 |
40.00 |
240.00 |
300.00 |
1,800.00 |
| 709-01 |
steel cattle guard
|
2   |
ea |
4,500.00 |
9,000.00 |
15,000.00 |
30,000.00 |
4,000.00 |
8,000.00 |
4,500.00 |
9,000.00 |
| 711-01-D |
riprap (25 kg, 450 mm)
|
3,252   |
sq m |
65.00 |
211,380.00 |
75.00 |
243,900.00 |
75.00 |
243,900.00 |
90.00 |
292,680.00 |
| 711-04 |
geotextile fabric
|
1,462   |
sq m |
4.00 |
5,848.00 |
3.00 |
4,386.00 |
5.00 |
7,310.00 |
4.00 |
5,848.00 |
| 712-01-C |
concrete cast-in-place revetment (150 mm thick)
|
128.0 |
sq m |
100.00 |
12,800.00 |
80.00 |
10,240.00 |
135.00 |
17,280.00 |
80.00 |
10,240.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
90,000.00 |
90,000.00 |
180,000.00 |
180,000.00 |
125,000.00 |
125,000.00 |
750,000.00 |
750,000.00 |
| 713-04-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
13.007 |
km |
675.00 |
8,779.73 |
680.00 |
8,844.76 |
600.00 |
7,804.20 |
175.00 |
2,276.23 |
| 713-04-B-01 |
temporary pvmt. markings (broken line)(100 mm w)(3.0 m
l)(type i removable) |
0.750 |
km |
2,750.00 |
2,062.50 |
2,700.00 |
2,025.00 |
2,500.00 |
1,875.00 |
7,500.00 |
5,625.00 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
13.007 |
km |
400.00 |
5,202.80 |
420.00 |
5,462.94 |
370.00 |
4,812.59 |
400.00 |
5,202.80 |
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type i removable) |
0.750 |
km |
10,000.00 |
7,500.00 |
10,000.00 |
7,500.00 |
9,500.00 |
7,125.00 |
9,000.00 |
6,750.00 |
| 716-01-A |
mulch (vegetative)
|
83.0 |
hctr |
1,400.00 |
116,200.00 |
2,200.00 |
182,600.00 |
1,900.00 |
157,700.00 |
2,000.00 |
166,000.00 |
| 717-01 |
seeding
|
2,800   |
kg |
19.00 |
53,200.00 |
20.00 |
56,000.00 |
12.00 |
33,600.00 |
12.50 |
35,000.00 |
| 718-01 |
fertilizer
|
93,334   |
kg |
0.60 |
56,000.40 |
0.70 |
65,333.80 |
0.50 |
46,667.00 |
0.60 |
56,000.40 |
| 720-01-A |
erosion control system, slope protection (type a)
|
62,993   |
sq m |
1.50 |
94,489.50 |
1.40 |
88,190.20 |
1.60 |
100,788.80 |
1.50 |
94,489.50 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
6,385   |
sq m |
1.50 |
9,577.50 |
2.20 |
14,047.00 |
2.20 |
14,047.00 |
2.00 |
12,770.00 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
9,063   |
sq m |
3.25 |
29,454.75 |
2.39 |
21,660.57 |
2.20 |
19,938.60 |
2.00 |
18,126.00 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
100   |
sq m |
3.25 |
325.00 |
4.00 |
400.00 |
3.30 |
330.00 |
3.00 |
300.00 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
100   |
sq m |
5.50 |
550.00 |
5.00 |
500.00 |
3.30 |
330.00 |
3.00 |
300.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
35,000.00 |
35,000.00 |
60,000.00 |
60,000.00 |
20,000.00 |
20,000.00 |
35,000.00 |
35,000.00 |
| 724-01-B |
pavement patching (300 mm minimum thickness)
|
2,527   |
sq m |
105.00 |
265,335.00 |
125.00 |
315,875.00 |
150.00 |
379,050.00 |
125.00 |
315,875.00 |
| 725-01 |
temporary detour roads
|
79.2 |
ln m |
500.00 |
39,600.00 |
650.00 |
51,480.00 |
850.00 |
67,320.00 |
600.00 |
47,520.00 |
| 726-01 |
bedding material
|
1,847.9 |
cu m |
110.00 |
203,269.00 |
105.00 |
194,029.50 |
150.00 |
277,185.00 |
100.00 |
184,790.00 |
| 727-01 |
mobilization
|
lump |
lump |
1,900,000.00 |
1,900,000.00 |
2,100,000.00 |
2,100,000.00 |
2,300,000.00 |
2,300,000.00 |
2,300,000.00 |
2,300,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
10   |
ea |
77.00 |
770.00 |
80.00 |
800.00 |
70.00 |
700.00 |
75.00 |
750.00 |
| 729-19-B |
dead end road installation (type b)
|
2   |
ea |
1,400.00 |
2,800.00 |
1,400.00 |
2,800.00 |
1,500.00 |
3,000.00 |
1,500.00 |
3,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,576   |
ea |
5.00 |
12,880.00 |
5.00 |
12,880.00 |
4.50 |
11,592.00 |
5.50 |
14,168.00 |
| 732-01-C |
plastic pavement striping (200 mm width)
|
440   |
ln m |
1.10 |
484.00 |
1.14 |
501.60 |
1.00 |
440.00 |
17.00 |
7,480.00 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
412   |
ln m |
3.30 |
1,359.60 |
3.40 |
1,400.80 |
3.00 |
1,236.00 |
21.00 |
8,652.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
53.994 |
km |
1,500.00 |
80,991.00 |
1,500.00 |
80,991.00 |
1,350.00 |
72,891.90 |
1,550.00 |
83,690.70 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
26.725 |
km |
475.00 |
12,694.38 |
500.00 |
13,362.50 |
450.00 |
12,026.25 |
600.00 |
16,035.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
22   |
ea |
150.00 |
3,300.00 |
160.00 |
3,520.00 |
150.00 |
3,300.00 |
350.00 |
7,700.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
22   |
ea |
150.00 |
3,300.00 |
160.00 |
3,520.00 |
150.00 |
3,300.00 |
350.00 |
7,700.00 |
| 732-05 |
removal of existing markings
|
13.007 |
km |
2,500.00 |
32,517.50 |
2,500.00 |
32,517.50 |
2,300.00 |
29,916.10 |
2,100.00 |
27,314.70 |
| 735-01 |
mailboxes
|
10   |
ea |
1.00 |
10.00 |
20.00 |
200.00 |
1.00 |
10.00 |
30.00 |
300.00 |
| 735-02 |
mailbox supports (single)
|
10   |
ea |
185.00 |
1,850.00 |
200.00 |
2,000.00 |
170.00 |
1,700.00 |
175.00 |
1,750.00 |
| 735-03 |
mailbox supports (double)
|
2   |
ea |
215.00 |
430.00 |
300.00 |
600.00 |
190.00 |
380.00 |
225.00 |
450.00 |
| 735-04 |
mailbox supports (multiple)
|
2   |
ea |
450.00 |
900.00 |
500.00 |
1,000.00 |
390.00 |
780.00 |
350.00 |
700.00 |
| 740-01 |
construction layout
|
lump |
lump |
250,000.00 |
250,000.00 |
350,000.00 |
350,000.00 |
323,700.00 |
323,700.00 |
550,000.00 |
550,000.00 |
| 744-01 |
traffic control management
|
lump |
lump |
35,000.00 |
35,000.00 |
100,000.00 |
100,000.00 |
30,000.00 |
30,000.00 |
200,000.00 |
200,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
684.0 |
ln m |
195.00 |
133,380.00 |
140.00 |
95,760.00 |
180.00 |
123,120.00 |
200.00 |
136,800.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
574.2 |
ln m |
400.00 |
229,680.00 |
270.00 |
155,034.00 |
300.00 |
172,260.00 |
500.00 |
287,100.00 |
| 804-12 |
loading permanent piles
|
2   |
ea |
20,000.00 |
40,000.00 |
100.00 |
200.00 |
40,000.00 |
80,000.00 |
100.00 |
200.00 |
| 804-17 |
dynamic monitoring
|
2   |
ea |
1,710.00 |
3,420.00 |
100.00 |
200.00 |
4,000.00 |
8,000.00 |
2,500.00 |
5,000.00 |
| 805-01-B |
class a concrete (bents)(box culvert headwalls)
|
5.78 |
cu m |
1,600.00 |
9,248.00 |
2,000.00 |
11,560.00 |
1,600.00 |
9,248.00 |
2,100.00 |
12,138.00 |
| 805-01-F |
class a concrete (bents)
|
135.20 |
cu m |
950.00 |
128,440.00 |
900.00 |
121,680.00 |
900.00 |
121,680.00 |
1,200.00 |
162,240.00 |
| 805-03 |
class aa concrete
|
361.82 |
cu m |
845.00 |
305,737.90 |
1,000.00 |
361,820.00 |
1,000.00 |
361,820.00 |
900.00 |
325,638.00 |
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
606.00 |
ln m |
400.00 |
242,400.00 |
260.00 |
157,560.00 |
400.00 |
242,400.00 |
350.00 |
212,100.00 |
| 805-11 |
strip seal joints
|
60.00 |
ln m |
585.00 |
35,100.00 |
300.00 |
18,000.00 |
700.00 |
42,000.00 |
600.00 |
36,000.00 |
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
39.40 |
ln m |
1,900.00 |
74,860.00 |
1,700.00 |
66,980.00 |
1,200.00 |
47,280.00 |
1,300.00 |
51,220.00 |
| 806-01 |
deformed reinforcing steel
|
74,186   |
kg |
2.00 |
148,372.00 |
1.56 |
115,730.16 |
2.00 |
148,372.00 |
2.00 |
148,372.00 |
| 807-06 |
structural metalwork
|
lump |
lump |
4,500.00 |
4,500.00 |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
7,000.00 |
7,000.00 |
| 810-01 |
concrete railing (barrier)
|
244.80 |
ln m |
215.00 |
52,632.00 |
210.00 |
51,408.00 |
275.00 |
67,320.00 |
260.00 |
63,648.00 |
| 813-01 |
concrete approach slabs
|
576.00 |
sq m |
300.00 |
172,800.00 |
190.00 |
109,440.00 |
250.00 |
144,000.00 |
210.00 |
120,960.00 |
| S-002 |
rumble strips(ground-in)
|
52.3 |
km |
330.00 |
17,259.00 |
370.00 |
19,351.00 |
400.00 |
20,920.00 |
500.00 |
26,150.00 |
| S-101 |
dynamic analysis
|
2   |
ea |
1,500.00 |
3,000.00 |
1,200.00 |
2,400.00 |
3,000.00 |
6,000.00 |
2,600.00 |
5,200.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
20,789,428.80 |
|
21,390,244.61 |
|
23,420,401.95 |
|
23,536,890.15 |
|