Lead Project: 282-01-0019
Parish: JEFFERSON
Routes: LA 48
Description: 3RD STREET (LA 49 - ST. CHARLES PARISH LINE)
Type Const: grading, cold planing asphaltic concrete pavement, drainage structures, superpave
asphaltic concrete pavement, pavement widening, pavement patching and related work.
Estimated Construction Cost: $1,094,618.50
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $1,177,286.20
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,286,987.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 150      SQYD 15.00 2,250.00 15.00 2,250.00        
202-02-G removal of surfacing & stabilized base 250.0    SQYD 10.00 2,500.00 10.00 2,500.00        
202-02-I removal of existing pipes 120      LNFT 18.00 2,160.00 17.00 2,040.00        
203-08 borrow (vehicular measurement) 1,000      CUYD 15.00 15,000.00 10.00 10,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
656      CUYD 80.00 52,480.00 50.00 32,800.00        
502-01 superpave asphaltic concrete 6,988.6    TON 78.00 545,110.80 82.00 573,065.20        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,225.0    TON 150.00 183,750.00 82.00 100,450.00        
509-01 cold planing asphaltic pavement 28,231      SQYD 3.00 84,693.00 4.00 112,924.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,176      CUYD 1.00 - 1,176.00 10.00 - 11,760.00        
701-01-G cross drain pipe (18" rcp/pcp) 80      LNFT 200.00 16,000.00 210.00 16,800.00        
701-01-I cross drain pipe (24" rcp/pcp) 40      LNFT 225.00 9,000.00 230.00 9,200.00        
702-04-A adjusting manholes 31      EACH 125.00 3,875.00 50.00 1,550.00        
702-04-B adjusting catch basins 26      EACH 300.00 7,800.00 400.00 10,400.00        
706-02-C concrete drive (6" thick) 10.0    SQYD 115.00 1,150.00 125.00 1,250.00        
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 190,000.00 190,000.00        
713-03-C temporary pavement markings (8" width) 1,544      LNFT 0.25 386.00 1.00 1,544.00        
713-03-E temporary pavement markings (24" width) 210      LNFT 1.00 210.00 2.00 420.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.240  MILE 150.00 936.00 10.00 62.40        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.910  MILE 500.00 1,455.00 20.00 58.20        
713-05-A temporary pavement markings (solid line)(4" width) 6.270  MILE 1,000.00 6,270.00 30.00 188.10        
713-06-A temporary pavement legends and symbols (arrow) 3      EACH 55.00 165.00 5.00 15.00        
713-06-C temporary pavement legends and symbols (only) 1      EACH 55.00 55.00 5.00 5.00        
724-01-B pavement patching (12" minimum thickness) 250      SQYD 50.00 12,500.00 100.00 25,000.00        
724-02 pavement widening 541.7    SQYD 70.00 37,919.00 90.00 48,753.00        
726-01 bedding material 22.0    CUYD 50.00 1,100.00 60.00 1,320.00        
727-01 mobilization lump      LUMP 100,000.00 100,000.00 120,000.00 120,000.00        
731-02 reflectorized raised pavement markers 400      EACH 6.00 2,400.00 6.00 2,400.00        
732-01-C plastic pavement striping (8" width) 772      LNFT 1.00 772.00 1.00 772.00        
732-01-E plastic pavement striping (24" width) 80      LNFT 4.00 320.00 4.00 320.00        
732-02-A plastic pavement striping (solid line) (4" width) 5.030  MILE 2,500.00 12,575.00 2,600.00 13,078.00        
732-03-A plastic pavement striping (broken line)(4" width) 7.936  MILE 900.00 7,142.40 900.00 7,142.40        
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 200.00 600.00 200.00 600.00        
732-04-C plastic pavement legends & symbols (only) 1      EACH 220.00 220.00 250.00 250.00        
735-01 mailboxes 18      EACH 6.00 108.00 5.00 90.00        
735-02 mailbox supports (single) 14      EACH 140.00 1,960.00 50.00 700.00        
735-03 mailbox supports (double) 2      EACH 250.00 500.00 100.00 200.00        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00        
741-11 adjusting water valve and meter box 1      EACH 100.00 100.00 600.00 600.00        
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 5,000.00 5,000.00        
                       
 CONTRACTOR TOTAL       1,177,286.20   1,286,987.30        