Lead Project: 221-30-0007
Parish: ST LANDRY
Routes: LA 760-2
Description: JUNCTION LA 93 - JUNCTION LA 182
Type Const: grading, cold plane asphaltic pavement, superpave asphaltic concrete overlay, asphatlic
pavement patching and widening and related work.
Estimated Construction Cost: $457,193.94
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $400,500.63
2 34356 PRAIRIE CONTRACTORS INC. $581,111.31
3 12312 GILCHRIST CONSTRUCTION CO. LLC $636,482.57
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 70      SQYD 25.00 1,750.00 100.00 7,000.00 30.00 2,100.00    
203-08 borrow (vehicular measurement) 75      CUYD 1.00 75.00 100.00 7,500.00 35.00 2,625.00    
203-08-A borrow (vehicular meas.)(selected soils) 25      CUYD 1.00 25.00 100.00 2,500.00 35.00 875.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
155      CUYD 30.00 4,650.00 115.00 17,825.00 90.00 13,950.00    
502-01 superpave asphaltic concrete 1,951.2    TON 73.00 142,437.60 95.00 185,364.00 105.00 204,876.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
134.1    TON 95.00 12,739.50 200.00 26,820.00 200.00 26,820.00    
509-01 cold planing asphaltic pavement 10,372      SQYD 2.25 23,337.00 2.40 24,892.80 5.00 51,860.00    
509-02 contractor retained reclaimed asphaltic pavement - 378      CUYD 0.01 - 3.78 0.01 - 3.78 0.01 - 3.78    
706-03-A incidental concrete paving ( 4" thick) 101.3    SQYD 52.00 5,267.60 104.00 10,535.20 65.00 6,584.50    
707-01 concrete curb 155.4    LNFT 16.00 2,486.40 49.00 7,614.60 15.00 2,331.00    
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 5,000.00 5,000.00 4,000.00 4,000.00    
713-03-B temporary pavement markings (6" width) 525      LNFT 0.29 152.25 0.15 78.75 0.28 147.00    
713-03-E temporary pavement markings (24" width) 921      LNFT 1.10 1,013.10 0.01 9.21 1.00 921.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.520  MILE 331.09 834.35 600.00 1,512.00 450.00 1,134.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.121  MILE 375.79 797.05 1.00 2.12 350.00 742.35    
713-05-A temporary pavement markings (solid line)(4" width) 6.411  MILE 607.04 3,891.73 1.00 6.41 550.00 3,526.05    
713-06-F temporary pavement legends and symbols (stop ahead) 3      EACH 115.63 346.89 1.00 3.00 120.00 360.00    
724-01-B pavement patching (12" minimum thickness) 215      SQYD 78.00 16,770.00 159.00 34,185.00 180.00 38,700.00    
724-02 pavement widening 2,419.8    SQYD 37.00 89,532.60 55.00 133,089.00 70.00 169,386.00    
727-01 mobilization lump      LUMP 32,500.00 32,500.00 100,000.00 100,000.00 40,000.00 40,000.00    
731-02 reflectorized raised pavement markers 324      EACH 5.90 1,911.60 6.00 1,944.00 5.50 1,782.00    
732-01-B plastic pavement striping (6" width) 175      LNFT 0.79 138.25 2.00 350.00 1.00 175.00    
732-01-E plastic pavement striping (24" width) 50      LNFT 3.76 188.00 5.00 250.00 4.00 200.00    
732-02-A plastic pavement striping (solid line) (4" width) 2.137  MILE 2,832.84 6,053.78 3,000.00 6,411.00 2,500.00 5,342.50    
732-03-A plastic pavement striping (broken line)(4" width) 0.707  MILE 936.58 662.16 1,000.00 707.00 850.00 600.95    
732-04-F plastic pavement legends & symbols (stop ahead) 1      EACH 572.35 572.35 2,000.00 2,000.00 550.00 550.00    
740-01 construction layout lump      LUMP 3,500.00 3,500.00 3,000.00 3,000.00 7,500.00 7,500.00    
741-11 adjusting water valve and meter box 1      EACH 350.00 350.00 1,000.00 1,000.00 150.00 150.00    
744-01 traffic control management lump      LUMP 22,000.00 22,000.00 100.00 100.00 45,000.00 45,000.00    
S-001 full depth sawcutting of existing portland cement
concrete drives
708      INFT 2.15 1,522.20 2.00 1,416.00 6.00 4,248.00    
                       
 CONTRACTOR TOTAL       400,500.63   581,111.31   636,482.57    