| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
12,500.00 |
12,500.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridges (sta 1359+05, 33.5'x 60' conc. slab
span bridges) |
1   |
EACH |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,092.7 |
SQYD |
18.00 |
19,668.60 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
325   |
LNFT |
5.00 |
1,625.00 |
|
|
|
|
|
|
| 202-02-I |
removal of concrete approach slabs
|
172.00 |
SQYD |
10.00 |
1,720.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
400   |
CUYD |
10.00 |
4,000.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
48   |
EACH |
30.00 |
1,440.00 |
|
|
|
|
|
|
| 204-04 |
temporary sediment basins
|
1   |
EACH |
1,250.00 |
1,250.00 |
|
|
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,049.4 |
TON |
150.00 |
157,410.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,240   |
SQYD |
15.00 |
18,600.00 |
|
|
|
|
|
|
| 509-02 |
contractor retatined reclaimed asphaltic pavement
|
- 35   |
CUYD |
0.01 |
- 0.35 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
440   |
LNFT |
42.00 |
18,480.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
312.5 |
LNFT |
20.00 |
6,250.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
55.00 |
2,750.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,000.00 |
4,000.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
1,300   |
SQYD |
70.00 |
91,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
76,000.00 |
76,000.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.081 |
MILE |
3,500.00 |
3,783.50 |
|
|
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
87   |
EACH |
700.00 |
60,900.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.30 |
ACRE |
2,000.00 |
600.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
9   |
LB |
55.00 |
495.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
300   |
LB |
3.50 |
1,050.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
200   |
SQYD |
100.00 |
20,000.00 |
|
|
|
|
|
|
| 725-01 |
temporary detour roads
|
800.0 |
LNFT |
200.00 |
160,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
130,000.00 |
130,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
75.00 |
150.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
109   |
EACH |
8.50 |
926.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.613 |
MILE |
4,000.00 |
6,452.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.806 |
MILE |
2,000.00 |
1,612.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
43,000.00 |
43,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
880   |
LNFT |
55.00 |
48,400.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
30.66 |
CUYD |
850.00 |
26,061.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
107.58 |
CUYD |
750.00 |
80,685.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
24,828   |
LB |
2.50 |
62,070.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
120.00 |
LNFT |
90.00 |
10,800.00 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
364.44 |
SQYD |
225.00 |
81,999.00 |
|
|
|
|
|
|
| S-001 |
impact attenuator (construction zone)
|
1   |
each |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-002 |
saw cutting of existing pavement (full depth)
|
634.00 |
LNFT |
3.50 |
2,219.00 |
|
|
|
|
|
|
| S-101 |
raising and/or undersealing concrete approach slab
(s.b.l) |
4,000.00 |
LB |
6.50 |
26,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,316,397.25 |
|
|
|
|
|
|
|