Letting of 2/28/2007 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 026-06-0050
Parish: FRANKLIN
Routes: LA 15
Description: STOKES BAYOU BRIDGE (N.B.L.)
Type Const: grading, drainage structures, cold planing asphaltic pvmt, superpave asphaltic concrete
overlay, pavement patching, concrete slab span bridge, and related work.
Estimated Construction Cost: $1,183,668.75
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $1,316,397.25
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 12,500.00 12,500.00            
202-02-A-01 removal of bridges (sta 1359+05, 33.5'x 60' conc. slab
span bridges)
1      EACH 45,000.00 45,000.00            
202-02-G removal of surfacing & stabilized base 1,092.7    SQYD 18.00 19,668.60            
202-02-H removal of guard rail 325      LNFT 5.00 1,625.00            
202-02-I removal of concrete approach slabs 172.00   SQYD 10.00 1,720.00            
203-02 drainage excavation 400      CUYD 10.00 4,000.00            
203-06 excavation & embankment lump      LUMP 15,000.00 15,000.00            
204-02 temporary hay or straw bales 48      EACH 30.00 1,440.00            
204-04 temporary sediment basins 1      EACH 1,250.00 1,250.00            
204-05-B temporary sediment check dams (stone) 1      EACH 2,500.00 2,500.00            
502-01 superpave asphaltic concrete 1,049.4    TON 150.00 157,410.00            
509-01 cold planing asphaltic pavement 1,240      SQYD 15.00 18,600.00            
509-02 contractor retatined reclaimed asphaltic pavement - 35      CUYD 0.01 - 0.35            
701-03-G storm drain pipe (18" rcp/pcp) 440      LNFT 42.00 18,480.00            
704-03 blocked out guard rail 312.5    LNFT 20.00 6,250.00            
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 55.00 2,750.00            
704-11-A guard rail end treatment (flared) 2      EACH 2,000.00 4,000.00            
712-04 flexible revetment 1,300      SQYD 70.00 91,000.00            
713-01 temporary signs & barricades lump      LUMP 76,000.00 76,000.00            
713-05-A temporary pavement markings (solid line)(4" width) 1.081  MILE 3,500.00 3,783.50            
713-09 temporary precast concrete barrier (department
furnished)
87      EACH 700.00 60,900.00            
716-01-A mulch (vegetative) 0.30   ACRE 2,000.00 600.00            
717-01 seeding 9      LB 55.00 495.00            
718-01 fertilizer 300      LB 3.50 1,050.00            
724-01-B pavement patching (12" minimum thickness) 200      SQYD 100.00 20,000.00            
725-01 temporary detour roads 800.0    LNFT 200.00 160,000.00            
727-01 mobilization lump      LUMP 130,000.00 130,000.00            
729-16-C object marker assembly (type 3) 2      EACH 75.00 150.00            
731-02 reflectorized raised pavement markers 109      EACH 8.50 926.50            
732-02-A plastic pavement striping (solid line) (4" width) 1.613  MILE 4,000.00 6,452.00            
732-03-A plastic pavement striping (broken line)(4" width) 0.806  MILE 2,000.00 1,612.00            
740-01 construction layout lump      LUMP 43,000.00 43,000.00            
744-01 traffic control management lump      LUMP 45,000.00 45,000.00            
804-01-B precast concrete piles (14") 880      LNFT 55.00 48,400.00            
804-12 loading permanent piles 1      EACH 1.00 1.00            
805-01-F class a concrete (bents) 30.66   CUYD 850.00 26,061.00            
805-03 class aa concrete 107.58   CUYD 750.00 80,685.00            
806-01 deformed reinforcing steel 24,828      LB 2.50 62,070.00            
810-01 concrete railing (barrier) 120.00   LNFT 90.00 10,800.00            
813-01 concrete approach slabs 364.44   SQYD 225.00 81,999.00            
S-001 impact attenuator (construction zone) 1      each 25,000.00 25,000.00            
S-002 saw cutting of existing pavement (full depth) 634.00   LNFT 3.50 2,219.00            
S-101 raising and/or undersealing concrete approach slab
(s.b.l)
4,000.00   LB 6.50 26,000.00            
                       
 CONTRACTOR TOTAL       1,316,397.25            