| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
500,000.00 |
500,000.00 |
300,000.00 |
300,000.00 |
900,000.00 |
900,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
57,000.00 |
57,000.00 |
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta. 1344+73; 1.5' x
4') |
1   |
EACH |
3,400.00 |
3,400.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta. 1372+59; 3' x
3') |
1   |
EACH |
3,400.00 |
3,400.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-B-03 |
removal of concrete box culverts (sta. 1393+62; 2' x
3') |
1   |
EACH |
3,400.00 |
3,400.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-B-04 |
removal of concrete box culverts (sta. 1525+19; 4' x
4') |
1   |
EACH |
3,400.00 |
3,400.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
7,246   |
SQYD |
5.75 |
41,664.50 |
15.00 |
108,690.00 |
7.00 |
50,722.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
316   |
SQYD |
10.00 |
3,160.00 |
20.00 |
6,320.00 |
20.00 |
6,320.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
15,955.9 |
SQYD |
4.50 |
71,801.55 |
7.00 |
111,691.30 |
5.00 |
79,779.50 |
|
|
| 202-02-01 |
removal of existing signal equipment (lt. & rt. of
sta. 1364+43) |
1   |
EACH |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
|
|
| 202-02-02 |
removal of 50' x 48' metal building (lt. of sta.
1564+65) |
1   |
EACH |
3,800.00 |
3,800.00 |
7,500.00 |
7,500.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-03 |
removal of 73' x 25' metal building (lt. of sta.
1564+95)(contains non-friable asbestos) |
1   |
EACH |
3,200.00 |
3,200.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-04 |
removal of 34' x 38' wood barn (lt. of sta. 1578+83)
|
1   |
EACH |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-05 |
removal of 76' x 22' brick residence (lt. of sta.
1579+67)(contains non-friable asbestos) |
1   |
EACH |
4,400.00 |
4,400.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-06 |
removal of 5' x 3' metal sign (lt. of sta. 1357+25)
|
1   |
EACH |
900.00 |
900.00 |
750.00 |
750.00 |
400.00 |
400.00 |
|
|
| 202-02-07 |
removal of 18' x 13' wood shed (lt. of sta. 1580+30)
|
1   |
EACH |
1,900.00 |
1,900.00 |
1,250.00 |
1,250.00 |
400.00 |
400.00 |
|
|
| 202-02-08 |
removal of 48' x 45' wood frame residence (lt. of sta.
1583+61)(contains non-friable asbestos) |
1   |
EACH |
5,400.00 |
5,400.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
|
|
| 203-01 |
general excavation
|
415,748   |
CUYD |
4.00 |
1,662,992.00 |
5.00 |
2,078,740.00 |
4.50 |
1,870,866.00 |
|
|
| 203-02 |
drainage excavation
|
327   |
CUYD |
11.00 |
3,597.00 |
8.00 |
2,616.00 |
9.22 |
3,014.94 |
|
|
| 203-03 |
muck excavation
|
452   |
CUYD |
11.00 |
4,972.00 |
12.00 |
5,424.00 |
13.00 |
5,876.00 |
|
|
| 203-04 |
embankment
|
215,770   |
CUYD |
5.00 |
1,078,850.00 |
5.00 |
1,078,850.00 |
2.50 |
539,425.00 |
|
|
| 203-05 |
non-plastic embankment
|
91   |
CUYD |
130.00 |
11,830.00 |
100.00 |
9,100.00 |
324.00 |
29,484.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
1,089   |
EACH |
20.00 |
21,780.00 |
10.00 |
10,890.00 |
10.00 |
10,890.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
203   |
EACH |
200.00 |
40,600.00 |
100.00 |
20,300.00 |
120.00 |
24,360.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
248   |
EACH |
700.00 |
173,600.00 |
220.00 |
54,560.00 |
500.00 |
124,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
55,909   |
LNFT |
2.50 |
139,772.50 |
2.00 |
111,818.00 |
2.26 |
126,354.34 |
|
|
| 204-07 |
temporary stone construction entrance
|
6   |
EACH |
2,500.00 |
15,000.00 |
1,000.00 |
6,000.00 |
1,000.00 |
6,000.00 |
|
|
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
158,202.3 |
SQYD |
10.00 |
1,582,023.00 |
10.00 |
1,582,023.00 |
10.00 |
1,582,023.00 |
|
|
| 302-02-F-01 |
class ii base course (8" thick)(soil cement)
|
151,517.4 |
SQYD |
6.50 |
984,863.10 |
9.00 |
1,363,656.60 |
10.50 |
1,590,932.70 |
|
|
| 304-01 |
lime
|
1,288.66 |
TON |
1.00 |
1,288.66 |
135.00 |
173,969.10 |
150.00 |
193,299.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
90,910   |
SQYD |
0.01 |
909.10 |
2.00 |
181,820.00 |
0.87 |
79,091.70 |
|
|
| 401-01 |
aggregate surface course (net section)
|
2,630.9 |
CUYD |
80.00 |
210,472.00 |
100.00 |
263,090.00 |
80.00 |
210,472.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
85   |
CUYD |
100.00 |
8,500.00 |
140.00 |
11,900.00 |
120.00 |
10,200.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
5,000.0 |
CUYD |
35.00 |
175,000.00 |
65.00 |
325,000.00 |
64.00 |
320,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
31,835.5 |
TON |
66.00 |
2,101,143.00 |
79.00 |
2,515,004.50 |
58.00 |
1,846,459.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
6,887.1 |
TON |
100.00 |
688,710.00 |
92.00 |
633,613.20 |
90.00 |
619,839.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
422   |
SQYD |
14.00 |
5,908.00 |
25.00 |
10,550.00 |
25.00 |
10,550.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 50   |
CUYD |
0.01 |
- 0.50 |
0.01 |
- 0.50 |
1.00 |
- 50.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
1,456   |
LNFT |
78.00 |
113,568.00 |
65.00 |
94,640.00 |
92.00 |
133,952.00 |
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
656   |
LNFT |
134.00 |
87,904.00 |
100.00 |
65,600.00 |
255.00 |
167,280.00 |
|
|
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
198   |
LNFT |
185.00 |
36,630.00 |
160.00 |
31,680.00 |
395.00 |
78,210.00 |
|
|
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
300   |
LNFT |
230.00 |
69,000.00 |
210.00 |
63,000.00 |
456.00 |
136,800.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
6,992   |
LNFT |
45.00 |
314,640.00 |
45.00 |
314,640.00 |
73.00 |
510,416.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
1,636   |
LNFT |
50.00 |
81,800.00 |
50.00 |
81,800.00 |
80.00 |
130,880.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
1,722   |
LNFT |
60.00 |
103,320.00 |
65.00 |
111,930.00 |
92.00 |
158,424.00 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
378   |
LNFT |
70.00 |
26,460.00 |
80.00 |
30,240.00 |
195.00 |
73,710.00 |
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
526   |
LNFT |
90.00 |
47,340.00 |
100.00 |
52,600.00 |
255.00 |
134,130.00 |
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
276   |
LNFT |
140.00 |
38,640.00 |
135.00 |
37,260.00 |
365.00 |
100,740.00 |
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
10   |
LNFT |
390.00 |
3,900.00 |
235.00 |
2,350.00 |
420.00 |
4,200.00 |
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
754   |
LNFT |
100.00 |
75,400.00 |
110.00 |
82,940.00 |
230.00 |
173,420.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
254   |
LNFT |
70.00 |
17,780.00 |
50.00 |
12,700.00 |
80.00 |
20,320.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
120   |
LNFT |
80.00 |
9,600.00 |
65.00 |
7,800.00 |
92.00 |
11,040.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
98   |
LNFT |
90.00 |
8,820.00 |
80.00 |
7,840.00 |
195.00 |
19,110.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
10   |
LNFT |
240.00 |
2,400.00 |
110.00 |
1,100.00 |
183.00 |
1,830.00 |
|
|
| 702-02-A |
manholes (mh-06)
|
10   |
EACH |
5,300.00 |
53,000.00 |
5,000.00 |
50,000.00 |
7,500.00 |
75,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
28   |
EACH |
2,200.00 |
61,600.00 |
2,800.00 |
78,400.00 |
2,700.00 |
75,600.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
5   |
EACH |
3,300.00 |
16,500.00 |
3,800.00 |
19,000.00 |
7,500.00 |
37,500.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
55   |
EACH |
3,800.00 |
209,000.00 |
4,000.00 |
220,000.00 |
3,000.00 |
165,000.00 |
|
|
| 702-03-D |
catch basins (cb-07)
|
26   |
EACH |
4,800.00 |
124,800.00 |
4,500.00 |
117,000.00 |
5,500.00 |
143,000.00 |
|
|
| 702-03-F |
catch basins (cb-08)
|
10   |
EACH |
8,200.00 |
82,000.00 |
8,200.00 |
82,000.00 |
10,000.00 |
100,000.00 |
|
|
| 702-03-I |
catch basins (cb-04)
|
3   |
EACH |
2,000.00 |
6,000.00 |
4,200.00 |
12,600.00 |
2,700.00 |
8,100.00 |
|
|
| 702-03-J |
catch basins (special detail)
|
1   |
EACH |
20,000.00 |
20,000.00 |
12,500.00 |
12,500.00 |
10,000.00 |
10,000.00 |
|
|
| 702-03-K |
catch basins (special detail)
|
2   |
EACH |
8,700.00 |
17,400.00 |
6,500.00 |
13,000.00 |
10,000.00 |
20,000.00 |
|
|
| 703-03 |
perforated pipe underdrains
|
12,648   |
LNFT |
7.75 |
98,022.00 |
11.00 |
139,128.00 |
19.00 |
240,312.00 |
|
|
| 703-04 |
nonperforated pipe underdrains
|
412   |
LNFT |
21.00 |
8,652.00 |
110.00 |
45,320.00 |
43.00 |
17,716.00 |
|
|
| 705-01 |
barbed wire fence
|
3,129   |
LNFT |
6.00 |
18,774.00 |
6.00 |
18,774.00 |
7.00 |
21,903.00 |
|
|
| 705-04 |
single swinging driveway gates
|
3   |
EACH |
450.00 |
1,350.00 |
450.00 |
1,350.00 |
500.00 |
1,500.00 |
|
|
| 705-05 |
double swinging driveway gates
|
1   |
dbgt |
690.00 |
690.00 |
650.00 |
650.00 |
700.00 |
700.00 |
|
|
| 705-06-A |
chain link fence (4-foot height)
|
985   |
LNFT |
20.00 |
19,700.00 |
20.00 |
19,700.00 |
22.00 |
21,670.00 |
|
|
| 705-07-A |
13-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
800.00 |
800.00 |
750.00 |
750.00 |
852.00 |
852.00 |
|
|
| 705-09 |
rebuilt fence
|
1,168   |
LNFT |
24.00 |
28,032.00 |
23.00 |
26,864.00 |
27.00 |
31,536.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
2,166.5 |
SQYD |
45.00 |
97,492.50 |
50.00 |
108,325.00 |
60.00 |
129,990.00 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
127.5 |
SQYD |
63.00 |
8,032.50 |
50.00 |
6,375.00 |
100.00 |
12,750.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
14,335.4 |
LNFT |
19.00 |
272,372.60 |
19.00 |
272,372.60 |
22.00 |
315,378.80 |
|
|
| 708-01 |
right-of-way monument
|
103   |
EACH |
340.00 |
35,020.00 |
200.00 |
20,600.00 |
100.00 |
10,300.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
80   |
EACH |
340.00 |
27,200.00 |
120.00 |
9,600.00 |
100.00 |
8,000.00 |
|
|
| 711-03-C |
riprap (30 lb.)
|
2,890.6 |
TON |
75.00 |
216,795.00 |
100.00 |
289,060.00 |
55.00 |
158,983.00 |
|
|
| 711-04 |
geotextile fabric
|
4,481   |
SQYD |
3.00 |
13,443.00 |
3.00 |
13,443.00 |
3.00 |
13,443.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
120,000.00 |
120,000.00 |
275,000.00 |
275,000.00 |
250,000.00 |
250,000.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
14.473 |
MILE |
6,000.00 |
86,838.00 |
7,000.00 |
101,311.00 |
14,500.00 |
209,858.50 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
400   |
EACH |
0.40 |
160.00 |
6.00 |
2,400.00 |
0.44 |
176.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
22.17 |
ACRE |
810.00 |
17,957.70 |
750.00 |
16,627.50 |
850.00 |
18,844.50 |
|
|
| 717-01 |
seeding
|
1,560   |
LB |
10.00 |
15,600.00 |
7.00 |
10,920.00 |
9.00 |
14,040.00 |
|
|
| 718-01 |
fertilizer
|
35,820   |
LB |
0.75 |
26,865.00 |
0.40 |
14,328.00 |
0.50 |
17,910.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
26,111   |
SQYD |
1.40 |
36,555.40 |
1.20 |
31,333.20 |
1.50 |
39,166.50 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
8,639   |
SQYD |
2.00 |
17,278.00 |
1.80 |
15,550.20 |
2.25 |
19,437.75 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
2,056   |
SQYD |
2.25 |
4,626.00 |
2.00 |
4,112.00 |
2.37 |
4,872.72 |
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
1,000   |
SQYD |
4.00 |
4,000.00 |
3.00 |
3,000.00 |
3.75 |
3,750.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
60,000.00 |
60,000.00 |
35,000.00 |
35,000.00 |
40,000.00 |
40,000.00 |
|
|
| 724-01-C |
pavement patching (14" minimum thickness)
|
567   |
SQYD |
140.00 |
79,380.00 |
150.00 |
85,050.00 |
160.00 |
90,720.00 |
|
|
| 725-02 |
temporary detour roads
|
3,318.0 |
SQYD |
50.00 |
165,900.00 |
50.00 |
165,900.00 |
95.00 |
315,210.00 |
|
|
| 726-01 |
bedding material
|
659.5 |
CUYD |
90.00 |
59,355.00 |
80.00 |
52,760.00 |
90.00 |
59,355.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,300,000.00 |
1,300,000.00 |
1,535,000.00 |
1,535,000.00 |
1,750,000.00 |
1,750,000.00 |
|
|
| 729-19-A |
dead end road installations (type a)
|
1   |
EACH |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
2,600.00 |
2,600.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,621   |
EACH |
5.20 |
13,629.20 |
6.00 |
15,726.00 |
6.00 |
15,726.00 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
1,551   |
LNFT |
0.60 |
930.60 |
2.30 |
3,567.30 |
0.63 |
977.13 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
8,671   |
LNFT |
1.14 |
9,884.94 |
2.55 |
22,111.05 |
1.25 |
10,838.75 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,604   |
LNFT |
3.50 |
5,614.00 |
6.00 |
9,624.00 |
3.75 |
6,015.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.427 |
MILE |
2,400.00 |
51,424.80 |
3,000.00 |
64,281.00 |
2,600.00 |
55,710.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
11.512 |
MILE |
800.00 |
9,209.60 |
1,400.00 |
16,116.80 |
850.00 |
9,785.20 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
39   |
EACH |
160.00 |
6,240.00 |
350.00 |
13,650.00 |
170.00 |
6,630.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
160.00 |
320.00 |
400.00 |
800.00 |
170.00 |
340.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
21   |
EACH |
230.00 |
4,830.00 |
400.00 |
8,400.00 |
250.00 |
5,250.00 |
|
|
| 732-05 |
removal of existing markings
|
3.676 |
MILE |
4,000.00 |
14,704.00 |
3,500.00 |
12,866.00 |
4,200.00 |
15,439.20 |
|
|
| 735-01 |
mailboxes
|
15   |
EACH |
22.00 |
330.00 |
25.00 |
375.00 |
25.00 |
375.00 |
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
170.00 |
2,550.00 |
175.00 |
2,625.00 |
150.00 |
2,250.00 |
|
|
| 736-01 |
trenching and backfilling
|
71   |
LNFT |
7.00 |
497.00 |
6.00 |
426.00 |
8.00 |
568.00 |
|
|
| 736-04-A |
signal support (40' treated timber pole)
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,000.00 |
4,000.00 |
2,200.00 |
4,400.00 |
|
|
| 736-05-B |
signal heads (1 section y, 8" lens)
|
4   |
EACH |
700.00 |
2,800.00 |
700.00 |
2,800.00 |
700.00 |
2,800.00 |
|
|
| 736-05-C |
signal heads (1 section r, 8" lens)
|
4   |
EACH |
700.00 |
2,800.00 |
700.00 |
2,800.00 |
700.00 |
2,800.00 |
|
|
| 736-06 |
signal service
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,200.00 |
1,200.00 |
1,100.00 |
1,100.00 |
|
|
| 736-08 |
signal controller (flasher)
|
1   |
EACH |
1,800.00 |
1,800.00 |
2,000.00 |
2,000.00 |
1,700.00 |
1,700.00 |
|
|
| 736-10 |
underground junction box (type e)
|
2   |
EACH |
575.00 |
1,150.00 |
600.00 |
1,200.00 |
600.00 |
1,200.00 |
|
|
| 736-11-A |
conduit (2" p.e.c.)
|
71   |
LNFT |
12.00 |
852.00 |
12.00 |
852.00 |
12.00 |
852.00 |
|
|
| 736-12-A |
conductor (3c power)
|
84   |
LNFT |
5.00 |
420.00 |
5.00 |
420.00 |
5.00 |
420.00 |
|
|
| 736-12-B |
conductor (6c power)
|
100   |
LNFT |
4.00 |
400.00 |
4.00 |
400.00 |
4.00 |
400.00 |
|
|
| 736-12-C |
conductor (10c power)
|
460   |
LNFT |
5.00 |
2,300.00 |
5.00 |
2,300.00 |
5.00 |
2,300.00 |
|
|
| 739-01-A |
hydro-seeding (forest service)
|
80.00 |
ACRE |
1,100.00 |
88,000.00 |
1,000.00 |
80,000.00 |
1,100.00 |
88,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
350,000.00 |
350,000.00 |
200,000.00 |
200,000.00 |
|
|
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
40,000.00 |
40,000.00 |
71,000.00 |
71,000.00 |
50,000.00 |
50,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
130,000.00 |
130,000.00 |
155,000.00 |
155,000.00 |
90,000.00 |
90,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
28.52 |
CUYD |
1,300.00 |
37,076.00 |
1,000.00 |
28,520.00 |
1,900.00 |
54,188.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
1,314.0 |
LNFT |
250.00 |
328,500.00 |
450.00 |
591,300.00 |
485.00 |
637,290.00 |
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
144.0 |
LNFT |
400.00 |
57,600.00 |
550.00 |
79,200.00 |
600.00 |
86,400.00 |
|
|
| 805-12-Y |
reinforced concrete box culverts (3'x 3')
|
30.0 |
LNFT |
460.00 |
13,800.00 |
350.00 |
10,500.00 |
610.00 |
18,300.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
2,252   |
LB |
3.00 |
6,756.00 |
2.50 |
5,630.00 |
2.50 |
5,630.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
7.7 |
MILE |
1,200.00 |
9,240.00 |
1,400.00 |
10,780.00 |
1,000.00 |
7,700.00 |
|
|
| S-002 |
forest service inspector
|
210   |
HOUR |
45.00 |
9,450.00 |
65.00 |
13,650.00 |
38.00 |
7,980.00 |
|
|
| S-003 |
removal of s. p. 023-01-0049 & 023-02-0014 transition
road |
lump |
LUMP |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
5,500.00 |
5,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
15,149,536.75 |
|
17,583,968.85 |
|
18,028,409.43 |
|
|
| | NUMBER OF DAYS BID AT $2,700 PER DAY. |
|
|
|
1,620,000.00 |
|
1,957,500.00 |
|
1,971,000.00 |
|
|
| | TOTAL BID |
|
|
|
16,769,536.75 |
|
19,541,468.85 |
|
19,999,409.43 |
|
|
|