| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
20.00 |
4,000.00 |
25.00 |
5,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,116   |
CUYD |
5.00 |
10,580.00 |
1.00 |
2,116.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
9,648.7 |
TON |
80.00 |
771,896.00 |
88.00 |
849,085.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,445.7 |
TON |
100.00 |
144,570.00 |
88.00 |
127,221.60 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
38,457   |
SQYD |
4.00 |
153,828.00 |
5.00 |
192,285.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
71,880   |
SQYD |
2.00 |
143,760.00 |
3.00 |
215,640.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,995   |
CUYD |
10.00 |
- 29,950.00 |
1.00 |
- 2,995.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
214.0 |
SQYD |
145.00 |
31,030.00 |
180.00 |
38,520.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
830   |
LNFT |
0.10 |
83.00 |
0.50 |
415.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,506   |
LNFT |
0.20 |
301.20 |
2.00 |
3,012.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.800 |
MILE |
10.00 |
98.00 |
200.00 |
1,960.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.960 |
MILE |
15.00 |
119.40 |
350.00 |
2,786.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
24.860 |
MILE |
20.00 |
497.20 |
700.00 |
17,402.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
14   |
EACH |
10.00 |
140.00 |
60.00 |
840.00 |
|
|
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
6   |
EACH |
15.00 |
90.00 |
80.00 |
480.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
26   |
EACH |
10.00 |
260.00 |
60.00 |
1,560.00 |
|
|
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
1,376   |
EACH |
2.00 |
2,752.00 |
3.00 |
4,128.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
200   |
SQYD |
200.00 |
40,000.00 |
100.00 |
20,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
155,000.00 |
155,000.00 |
180,000.00 |
180,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,080   |
EACH |
5.50 |
16,940.00 |
5.50 |
16,940.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
415   |
LNFT |
1.20 |
498.00 |
2.00 |
830.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
753   |
LNFT |
3.60 |
2,710.80 |
6.00 |
4,518.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.430 |
MILE |
2,200.00 |
27,346.00 |
2,300.00 |
28,589.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.980 |
MILE |
700.00 |
2,786.00 |
750.00 |
2,985.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
7   |
EACH |
180.00 |
1,260.00 |
200.00 |
1,400.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
3   |
EACH |
200.00 |
600.00 |
230.00 |
690.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
13   |
EACH |
200.00 |
2,600.00 |
230.00 |
2,990.00 |
|
|
|
|
| 735-01 |
mailboxes
|
161   |
EACH |
5.00 |
805.00 |
6.00 |
966.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
161   |
EACH |
110.00 |
17,710.00 |
120.00 |
19,320.00 |
|
|
|
|
| 736-09 |
loop detector
|
1,700   |
LNFT |
14.00 |
23,800.00 |
16.00 |
27,200.00 |
|
|
|
|
| 736-10 |
underground junction box
|
5   |
EACH |
270.00 |
1,350.00 |
300.00 |
1,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| S-001 |
u-channel post installation
|
51   |
EACH |
50.00 |
2,550.00 |
60.00 |
3,060.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,625,010.60 |
|
1,880,444.20 |
|
|
|
|
|