Letting of 2/28/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 018-01-0028
Parish: ORLEANS
Routes: US 11
Description: US 11 (US 90 TO I-10)
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete overlay, pavement patching, and related work.
Estimated Construction Cost: $2,820,703.31
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $2,724,529.30
2 06276 BARRIERE CONSTRUCTION CO., LLC $3,170,010.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing & stabilized base 80.0    SQYD 20.00 1,600.00 20.00 1,600.00        
202-02-H removal of guard rail 934      LNFT 5.00 4,670.00 4.00 3,736.00        
203-08 borrow (vehicular measurement) 935      CUYD 30.00 28,050.00 30.00 28,050.00        
203-08-A borrow (vehicular meas.) (selected soils) 200      CUYD 30.00 6,000.00 30.00 6,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,888      CUYD 90.00 169,920.00 70.00 132,160.00        
502-01 superpave asphaltic concrete 19,843.4    TON 75.00 1,488,255.00 73.00 1,448,568.20        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,133.9    TON 10.00 21,339.00 120.00 256,068.00        
509-01 cold planing asphaltic pavement 66,390      SQYD 2.00 132,780.00 2.00 132,780.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,844      CUYD 5.00 - 9,220.00 1.00 - 1,844.00        
701-01-O cross drain pipe (48" rcp/pcp) 288      LNFT 790.00 227,520.00 1,600.00 460,800.00        
704-03 blocked out guard rail 100.0    LNFT 20.00 2,000.00 20.00 2,000.00        
704-07-A guard rail bridge attachments (single thrie beam) 100.0    LNFT 50.00 5,000.00 50.00 5,000.00        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 70.00 14,000.00 60.00 12,000.00        
704-11-A guard rail end treatment (flared) 8      EACH 2,000.00 16,000.00 2,200.00 17,600.00        
711-03-C riprap (30 lb) 40.0    TON 200.00 8,000.00 160.00 6,400.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 170,000.00 170,000.00        
713-03-E temporary pavement markings (24" width) 44      LNFT 0.40 17.60 3.00 132.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
11.200  MILE 10.00 112.00 220.00 2,464.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
8.860  MILE 15.00 132.90 500.00 4,430.00        
713-05-A temporary pavement markings (solid line)(4" width) 32.340  MILE 20.00 646.80 100.00 3,234.00        
724-01-B pavement patching (12" minimum thickness) 1,410      SQYD 100.00 141,000.00 40.00 56,400.00        
727-01 mobilization lump      LUMP 260,000.00 260,000.00 300,000.00 300,000.00        
729-01 sign (type a) 70.0    SQFT 40.00 2,800.00 40.00 2,800.00        
729-16-B object marker assembly (type 2) 6      EACH 50.00 300.00 50.00 300.00        
729-16-C object marker assembly (type 3) 8      EACH 80.00 640.00 75.00 600.00        
731-02 reflectorized raised pavement markers 785      EACH 6.00 4,710.00 6.00 4,710.00        
732-01-E plastic pavement striping (24" width) 22      LNFT 3.00 66.00 3.00 66.00        
732-02-A plastic pavement striping (solid line) (4" width) 16.170  MILE 2,600.00 42,042.00 2,500.00 40,425.00        
732-03-A plastic pavement striping (broken line)(4" width) 4.430  MILE 800.00 3,544.00 700.00 3,101.00        
735-01 mailboxes 44      EACH 6.00 264.00 5.00 220.00        
735-02 mailbox supports (single) 44      EACH 140.00 6,160.00 115.00 5,060.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00        
741-11 adjusting water valve and meter box 1      EACH 600.00 600.00 1,000.00 1,000.00        
744-01 traffic control management lump      LUMP 6,000.00 6,000.00 25,000.00 25,000.00        
S-001 dynamic message sign unit 2      EACH 8,500.00 17,000.00 6,000.00 12,000.00        
S-002 geogrid 430      SQYD 6.00 2,580.00 5.00 2,150.00        
                       
 CONTRACTOR TOTAL       2,724,529.30   3,170,010.20        