| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - R. E. HEIDT CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
2,164   |
LNFT |
10.00 |
21,640.00 |
6.00 |
12,984.00 |
6.00 |
12,984.00 |
3.00 |
6,492.00 |
| 203-08 |
borrow (vehicular measurement)
|
500   |
CUYD |
20.00 |
10,000.00 |
40.00 |
20,000.00 |
20.00 |
10,000.00 |
62.00 |
31,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
48   |
CUYD |
100.00 |
4,800.00 |
100.00 |
4,800.00 |
100.00 |
4,800.00 |
226.00 |
10,848.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
270.5 |
TON |
175.00 |
47,337.50 |
180.00 |
48,690.00 |
155.00 |
41,927.50 |
80.00 |
21,640.00 |
| 508-01 |
asphalt concrete (sma) wearing course
|
14,057.9 |
TON |
100.00 |
1,405,790.00 |
120.00 |
1,686,948.00 |
110.00 |
1,546,369.00 |
101.00 |
1,419,847.90 |
| 509-01 |
cold planing asphaltic pavement
|
113,922   |
SQYD |
2.00 |
227,844.00 |
1.00 |
113,922.00 |
2.00 |
227,844.00 |
0.50 |
56,961.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,498   |
CUYD |
0.01 |
- 44.98 |
0.00 |
0.00 |
0.10 |
- 449.80 |
2.00 |
- 8,996.00 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
760   |
LNFT |
6.00 |
4,560.00 |
3.00 |
2,280.00 |
2.50 |
1,900.00 |
2.10 |
1,596.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,064   |
LNFT |
6.00 |
6,384.00 |
3.00 |
3,192.00 |
2.50 |
2,660.00 |
2.10 |
2,234.40 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
25.0 |
LNFT |
40.00 |
1,000.00 |
45.00 |
1,125.00 |
60.00 |
1,500.00 |
42.00 |
1,050.00 |
| 704-03 |
blocked out guard rail
|
897.8 |
LNFT |
17.00 |
15,262.60 |
18.00 |
16,160.40 |
24.00 |
21,547.20 |
18.00 |
16,160.40 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
125.0 |
LNFT |
39.00 |
4,875.00 |
40.00 |
5,000.00 |
54.00 |
6,750.00 |
41.00 |
5,125.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
263.5 |
LNFT |
52.00 |
13,702.00 |
53.00 |
13,965.50 |
66.00 |
17,391.00 |
55.00 |
14,492.50 |
| 704-11-A |
guard rail end treatment (flared)
|
32   |
EACH |
1,900.00 |
60,800.00 |
2,000.00 |
64,000.00 |
2,400.00 |
76,800.00 |
1,995.00 |
63,840.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,300.00 |
4,600.00 |
2,400.00 |
4,800.00 |
3,000.00 |
6,000.00 |
2,415.00 |
4,830.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
9,193.00 |
9,193.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
23.850 |
MILE |
400.00 |
9,540.00 |
400.00 |
9,540.00 |
150.00 |
3,577.50 |
671.00 |
16,003.35 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
24.222 |
MILE |
1.00 |
24.22 |
450.00 |
10,899.90 |
363.00 |
8,792.59 |
315.00 |
7,629.93 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
48.090 |
MILE |
1.00 |
48.09 |
850.00 |
40,876.50 |
725.00 |
34,865.25 |
630.00 |
30,296.70 |
| 717-01 |
seeding
|
32   |
LB |
200.00 |
6,400.00 |
22.00 |
704.00 |
24.00 |
768.00 |
21.00 |
672.00 |
| 718-01 |
fertilizer
|
530   |
LB |
2.00 |
1,060.00 |
2.00 |
1,060.00 |
2.00 |
1,060.00 |
2.00 |
1,060.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
250   |
SQYD |
150.00 |
37,500.00 |
180.00 |
45,000.00 |
124.00 |
31,000.00 |
76.00 |
19,000.00 |
| 724-03 |
pavement joint repair
|
10.0 |
TON |
200.00 |
2,000.00 |
500.00 |
5,000.00 |
500.00 |
5,000.00 |
427.00 |
4,270.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
80,000.00 |
80,000.00 |
320,000.00 |
320,000.00 |
50,000.00 |
50,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
58.00 |
1,160.00 |
65.00 |
1,300.00 |
65.00 |
1,300.00 |
61.00 |
1,220.00 |
| 729-16-C |
object marker assembly (type 3)
|
34   |
EACH |
70.00 |
2,380.00 |
75.00 |
2,550.00 |
90.00 |
3,060.00 |
74.00 |
2,516.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,050   |
EACH |
5.00 |
5,250.00 |
5.50 |
5,775.00 |
6.00 |
6,300.00 |
5.00 |
5,250.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
16.030 |
MILE |
2,600.00 |
41,678.00 |
2,400.00 |
38,472.00 |
2,600.00 |
41,678.00 |
2,258.00 |
36,195.74 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.074 |
MILE |
800.00 |
6,459.20 |
725.00 |
5,853.65 |
850.00 |
6,862.90 |
735.00 |
5,934.39 |
| 735-01 |
mailboxes
|
4   |
EACH |
1.00 |
4.00 |
50.00 |
200.00 |
20.00 |
80.00 |
1.00 |
4.00 |
| 735-02 |
mailbox supports (single)
|
4   |
EACH |
500.00 |
2,000.00 |
175.00 |
700.00 |
150.00 |
600.00 |
105.00 |
420.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
3,278.00 |
3,278.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
20,000.00 |
20,000.00 |
51,486.00 |
51,486.00 |
| S-001 |
rumble strips (ground-in)
|
1.3 |
MILE |
6,400.00 |
8,320.00 |
3,000.00 |
3,900.00 |
4,500.00 |
5,850.00 |
3,958.00 |
5,145.40 |
| S-002 |
high strain asphalt mixture-reflective crack relief
interlayer |
111,172   |
SQYD |
6.50 |
722,618.00 |
8.50 |
944,962.00 |
7.22 |
802,661.84 |
13.00 |
1,445,236.00 |
| S-127 |
sawcuts in asphaltic concrete lifts
|
1,824   |
LNFT |
5.00 |
9,120.00 |
3.00 |
5,472.00 |
2.50 |
4,560.00 |
2.10 |
3,830.40 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,234,111.63 |
|
3,285,131.95 |
|
3,316,038.98 |
|
3,345,762.11 |
|