Letting of 1/31/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 834-12-0012
Parish: MOREHOUSE
Routes: LA 593
Description: 1.3 MILES N. OF S. JCT. US 425 TO N. JCT. US 425
Type Const: asphalt surface treatment and striping
Estimated Construction Cost: $745,955.90
 
RankLicenseBidderConstruction Bid
1 05635 DREHER CONTRACTING, INC. $565,899.40
2 14422 T. L. WALLACE CONSTRUCTION, INC. $624,558.35
3 35378 P.R. PARKER COMPANY INC $627,729.35
 
Item Number Item Description Quantity Unit of Measure - 1 -
DREHER CONTRACTING, INC.
- 2 -
T. L. WALLACE CONSTRUCTION, INC.
- 3 -
P.R. PARKER COMPANY INC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
507-01-A asphaltic surface treatment (1 application) 335,560      SQYD 1.29 432,872.40 1.41 473,139.60 1.45 486,562.00    
713-01 temporary signs & barricades lump      LUMP 22,000.00 22,000.00 20,000.00 20,000.00 18,000.00 18,000.00    
713-07-A temporary reflectorized raised pavement markers (tabs) 7,368      EACH 1.10 8,104.80 0.50 3,684.00 1.15 8,473.20    
727-01 mobilization lump      LUMP 20,000.00 20,000.00 20,000.00 20,000.00 31,000.00 31,000.00    
731-02 reflectorized raised pavement markers 3,685      EACH 4.55 16,766.75 5.00 18,425.00 4.50 16,582.50    
732-01-E plastic pavement striping (24" width) 82      LNFT 5.05 414.10 3.00 246.00 5.00 410.00    
732-02-A-03 plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness)
56.276  MILE 955.00 53,743.58 1,200.00 67,531.20 975.00 54,869.10    
732-03-A-03 plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thick)
16.739  MILE 430.00 7,197.77 450.00 7,532.55 450.00 7,532.55    
732-04-D plastic pavement legends & symbols (rr crossing) 8      EACH 475.00 3,800.00 500.00 4,000.00 450.00 3,600.00    
744-01 traffic control management lump      LUMP 1,000.00 1,000.00 10,000.00 10,000.00 700.00 700.00    
                       
 CONTRACTOR TOTAL       565,899.40   624,558.35   627,729.35    