| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - LOUISIANA BRIDGE, INC. |
- 2 - BEN ALLEN, INC. |
- 3 - F. MILLER CONSTRUCTION LLC |
- 4 - QUALITY DESIGN & CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-A-01 |
removal of bridges - str. no. 58308300803511 (sta.
102+24.80 ; 122' x 24' concrete deck girder bridge) |
1   |
EACH |
26,770.00 |
26,770.00 |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
41,300.00 |
41,300.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
232.5 |
SQYD |
5.50 |
1,278.75 |
6.00 |
1,395.00 |
9.00 |
2,092.50 |
12.40 |
2,883.00 |
| 202-02-H |
removal of guard rail
|
472   |
LNFT |
7.00 |
3,304.00 |
4.00 |
1,888.00 |
10.00 |
4,720.00 |
8.40 |
3,964.80 |
| 203-02 |
drainage excavation
|
550   |
CUYD |
15.25 |
8,387.50 |
8.00 |
4,400.00 |
16.60 |
9,130.00 |
12.30 |
6,765.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
14,000.00 |
14,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
6,100.00 |
6,100.00 |
| 502-01 |
superpave asphaltic concrete
|
324.8 |
TON |
200.00 |
64,960.00 |
190.00 |
61,712.00 |
370.00 |
120,176.00 |
204.00 |
66,259.20 |
| 509-01 |
cold planing asphaltic pavement
|
678   |
SQYD |
17.00 |
11,526.00 |
12.00 |
8,136.00 |
34.00 |
23,052.00 |
18.20 |
12,339.60 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 33   |
CUYD |
1.14 |
- 37.62 |
1.00 |
- 33.00 |
6.00 |
- 198.00 |
1.00 |
- 33.00 |
| 704-03 |
blocked out guard rail
|
62.5 |
LNFT |
22.70 |
1,418.75 |
23.00 |
1,437.50 |
22.00 |
1,375.00 |
21.00 |
1,312.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
83.3 |
LNFT |
60.16 |
5,011.33 |
66.00 |
5,497.80 |
60.00 |
4,998.00 |
60.00 |
4,998.00 |
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,497.00 |
2,497.00 |
2,200.00 |
2,200.00 |
2,450.00 |
2,450.00 |
2,000.00 |
2,000.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,724.00 |
5,448.00 |
2,900.00 |
5,800.00 |
2,700.00 |
5,400.00 |
2,750.00 |
5,500.00 |
| 708-01 |
right-of-way monument
|
4   |
EACH |
227.00 |
908.00 |
150.00 |
600.00 |
900.00 |
3,600.00 |
300.00 |
1,200.00 |
| 708-02 |
right-of-way monument witness post
|
4   |
EACH |
227.00 |
908.00 |
150.00 |
600.00 |
900.00 |
3,600.00 |
300.00 |
1,200.00 |
| 712-04 |
flexible revetment
|
490   |
SQYD |
60.00 |
29,400.00 |
70.00 |
34,300.00 |
68.00 |
33,320.00 |
77.30 |
37,877.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,000.00 |
7,000.00 |
20,000.00 |
20,000.00 |
19,000.00 |
19,000.00 |
24,500.00 |
24,500.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.009 |
MILE |
13,620.00 |
122.58 |
1,000.00 |
9.00 |
5,300.00 |
47.70 |
24,000.00 |
216.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.268 |
MILE |
1,010.15 |
270.72 |
950.00 |
254.60 |
2,600.00 |
696.80 |
12,000.00 |
3,216.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
11   |
EACH |
6.13 |
67.43 |
20.00 |
220.00 |
14.00 |
154.00 |
6.50 |
71.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
59,595.00 |
59,595.00 |
70,000.00 |
70,000.00 |
80,000.00 |
80,000.00 |
49,400.00 |
49,400.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.15 |
340.60 |
85.00 |
340.00 |
75.00 |
300.00 |
75.00 |
300.00 |
| 731-02 |
reflectorized raised pavement markers
|
11   |
EACH |
6.95 |
76.45 |
7.00 |
77.00 |
20.00 |
220.00 |
6.70 |
73.70 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.268 |
MILE |
7,377.50 |
1,977.17 |
7,500.00 |
2,010.00 |
6,800.00 |
1,822.40 |
10,000.00 |
2,680.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.009 |
MILE |
3,972.50 |
35.75 |
4,500.00 |
40.50 |
4,000.00 |
36.00 |
20,000.00 |
180.00 |
| 739-01 |
hydro-seeding
|
0.15 |
ACRE |
6,810.00 |
1,021.50 |
10,000.00 |
1,500.00 |
6,600.00 |
990.00 |
10,000.00 |
1,500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
11,100.00 |
11,100.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
5,100.00 |
5,100.00 |
12,000.00 |
12,000.00 |
21,900.00 |
21,900.00 |
26,800.00 |
26,800.00 |
| 804-01-B |
precast concrete piles (14")
|
1,715   |
LNFT |
53.80 |
92,267.00 |
45.00 |
77,175.00 |
48.00 |
82,320.00 |
58.00 |
99,470.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
FREE |
FREE |
100.00 |
100.00 |
29,200.00 |
29,200.00 |
| 805-01-F |
class a concrete (bents)
|
56.80 |
CUYD |
550.00 |
31,240.00 |
700.00 |
39,760.00 |
950.00 |
53,960.00 |
1,407.00 |
79,917.60 |
| 805-03 |
class aa concrete
|
236.22 |
CUYD |
400.00 |
94,488.00 |
600.00 |
141,732.00 |
750.00 |
177,165.00 |
1,020.00 |
240,944.40 |
| 806-01 |
deformed reinforcing steel
|
50,362   |
LB |
0.85 |
42,807.70 |
0.80 |
40,289.60 |
0.85 |
42,807.70 |
1.40 |
70,506.80 |
| 810-01 |
concrete railing (barrier)
|
240.00 |
LNFT |
60.00 |
14,400.00 |
65.00 |
15,600.00 |
70.00 |
16,800.00 |
190.00 |
45,600.00 |
| 813-01 |
concrete approach slabs
|
400.00 |
SQYD |
208.50 |
83,400.00 |
225.00 |
90,000.00 |
190.00 |
76,000.00 |
280.00 |
112,000.00 |
| S-101 |
special guard rail anchor section
|
1   |
EACH |
1,248.50 |
1,248.50 |
1,000.00 |
1,000.00 |
1,200.00 |
1,200.00 |
1,045.00 |
1,045.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
613,239.11 |
|
724,941.00 |
|
837,235.10 |
|
992,387.10 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GUINN BROTHERS, LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-A-01 |
removal of bridges - str. no. 58308300803511 (sta.
102+24.80 ; 122' x 24' concrete deck girder bridge) |
1   |
EACH |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
232.5 |
SQYD |
25.00 |
5,812.50 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
472   |
LNFT |
8.00 |
3,776.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
550   |
CUYD |
15.00 |
8,250.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
324.8 |
TON |
328.00 |
106,534.40 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
678   |
SQYD |
23.00 |
15,594.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 33   |
CUYD |
0.00 |
0.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
62.5 |
LNFT |
35.00 |
2,187.50 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
83.3 |
LNFT |
70.00 |
5,831.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
3,700.00 |
7,400.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
4   |
EACH |
800.00 |
3,200.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
4   |
EACH |
800.00 |
3,200.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
490   |
SQYD |
100.00 |
49,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
18,000.00 |
18,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.009 |
MILE |
10,000.00 |
90.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.268 |
MILE |
2,500.00 |
670.00 |
|
|
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
11   |
EACH |
50.00 |
550.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
125.00 |
500.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
11   |
EACH |
50.00 |
550.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.268 |
MILE |
10,000.00 |
2,680.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.009 |
MILE |
10,000.00 |
90.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
0.15 |
ACRE |
25,000.00 |
3,750.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,715   |
LNFT |
68.00 |
116,620.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
56.80 |
CUYD |
1,500.00 |
85,200.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
236.22 |
CUYD |
1,000.00 |
236,220.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
50,362   |
LB |
1.08 |
54,390.96 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
240.00 |
LNFT |
90.00 |
21,600.00 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
400.00 |
SQYD |
228.00 |
91,200.00 |
|
|
|
|
|
|
| S-101 |
special guard rail anchor section
|
1   |
EACH |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,093,397.36 |
|
|
|
|
|
|
|