DBE GOAL FED
Lead Project: 830-08-0013
Parish: LASALLE
Routes: LA 127, LA 8
Description: HEMPS CREEK WEST BRIDGE REPLACEMENT
Type Const: cold planing asphaltic pavement, superpave asphaltic conc overlay, concrete slab
span bridge and related work.
Estimated Construction Cost: $857,178.87
 
RankLicenseBidderConstruction Bid
1 14788 LOUISIANA BRIDGE, INC. $613,239.11
2 23112 BEN ALLEN, INC. $724,941.00
3 00060 F. MILLER CONSTRUCTION LLC $837,235.10
4 32044 QUALITY DESIGN & CONSTRUCTION, INC. $992,387.10
5 09090 GUINN BROTHERS, LLC. $1,093,397.36
 
Item Number Item Description Quantity Unit of Measure - 1 -
LOUISIANA BRIDGE, INC.
- 2 -
BEN ALLEN, INC.
- 3 -
F. MILLER CONSTRUCTION LLC
- 4 -
QUALITY DESIGN & CONSTRUCTION, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-A-01 removal of bridges - str. no. 58308300803511 (sta.
102+24.80 ; 122' x 24' concrete deck girder
bridge)
1      EACH 26,770.00 26,770.00 50,000.00 50,000.00 25,000.00 25,000.00 41,300.00 41,300.00
202-02-G removal of surfacing & stabilized base 232.5    SQYD 5.50 1,278.75 6.00 1,395.00 9.00 2,092.50 12.40 2,883.00
202-02-H removal of guard rail 472      LNFT 7.00 3,304.00 4.00 1,888.00 10.00 4,720.00 8.40 3,964.80
203-02 drainage excavation 550      CUYD 15.25 8,387.50 8.00 4,400.00 16.60 9,130.00 12.30 6,765.00
203-06 excavation & embankment lump      LUMP 14,000.00 14,000.00 25,000.00 25,000.00 15,000.00 15,000.00 6,100.00 6,100.00
502-01 superpave asphaltic concrete 324.8    TON 200.00 64,960.00 190.00 61,712.00 370.00 120,176.00 204.00 66,259.20
509-01 cold planing asphaltic pavement 678      SQYD 17.00 11,526.00 12.00 8,136.00 34.00 23,052.00 18.20 12,339.60
509-02 contractor retained reclaimed asphaltic pavement - 33      CUYD 1.14 - 37.62 1.00 - 33.00 6.00 - 198.00 1.00 - 33.00
704-03 blocked out guard rail 62.5    LNFT 22.70 1,418.75 23.00 1,437.50 22.00 1,375.00 21.00 1,312.50
704-08-B guard rail transitions (double thrie beam) 83.3    LNFT 60.16 5,011.33 66.00 5,497.80 60.00 4,998.00 60.00 4,998.00
704-11-A guard rail end treatment (flared) 1      EACH 2,497.00 2,497.00 2,200.00 2,200.00 2,450.00 2,450.00 2,000.00 2,000.00
704-11-B guard rail end treatment (tangent) 2      EACH 2,724.00 5,448.00 2,900.00 5,800.00 2,700.00 5,400.00 2,750.00 5,500.00
708-01 right-of-way monument 4      EACH 227.00 908.00 150.00 600.00 900.00 3,600.00 300.00 1,200.00
708-02 right-of-way monument witness post 4      EACH 227.00 908.00 150.00 600.00 900.00 3,600.00 300.00 1,200.00
712-04 flexible revetment 490      SQYD 60.00 29,400.00 70.00 34,300.00 68.00 33,320.00 77.30 37,877.00
713-01 temporary signs & barricades lump      LUMP 7,000.00 7,000.00 20,000.00 20,000.00 19,000.00 19,000.00 24,500.00 24,500.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.009  MILE 13,620.00 122.58 1,000.00 9.00 5,300.00 47.70 24,000.00 216.00
713-05-A temporary pavement markings (solid line)(4" width) 0.268  MILE 1,010.15 270.72 950.00 254.60 2,600.00 696.80 12,000.00 3,216.00
713-07 temporary reflectorized raised pavement markers 11      EACH 6.13 67.43 20.00 220.00 14.00 154.00 6.50 71.50
727-01 mobilization lump      LUMP 59,595.00 59,595.00 70,000.00 70,000.00 80,000.00 80,000.00 49,400.00 49,400.00
729-16-C object marker assembly (type 3) 4      EACH 85.15 340.60 85.00 340.00 75.00 300.00 75.00 300.00
731-02 reflectorized raised pavement markers 11      EACH 6.95 76.45 7.00 77.00 20.00 220.00 6.70 73.70
732-02-A plastic pavement striping (solid line) (4" width) 0.268  MILE 7,377.50 1,977.17 7,500.00 2,010.00 6,800.00 1,822.40 10,000.00 2,680.00
732-03-A plastic pavement striping (broken line)(4" width) 0.009  MILE 3,972.50 35.75 4,500.00 40.50 4,000.00 36.00 20,000.00 180.00
739-01 hydro-seeding 0.15   ACRE 6,810.00 1,021.50 10,000.00 1,500.00 6,600.00 990.00 10,000.00 1,500.00
740-01 construction layout lump      LUMP 2,000.00 2,000.00 10,000.00 10,000.00 8,000.00 8,000.00 11,100.00 11,100.00
744-01 traffic control management lump      LUMP 5,100.00 5,100.00 12,000.00 12,000.00 21,900.00 21,900.00 26,800.00 26,800.00
804-01-B precast concrete piles (14") 1,715      LNFT 53.80 92,267.00 45.00 77,175.00 48.00 82,320.00 58.00 99,470.00
804-12 loading permanent piles 1      EACH 1.00 1.00 FREE FREE 100.00 100.00 29,200.00 29,200.00
805-01-F class a concrete (bents) 56.80   CUYD 550.00 31,240.00 700.00 39,760.00 950.00 53,960.00 1,407.00 79,917.60
805-03 class aa concrete 236.22   CUYD 400.00 94,488.00 600.00 141,732.00 750.00 177,165.00 1,020.00 240,944.40
806-01 deformed reinforcing steel 50,362      LB 0.85 42,807.70 0.80 40,289.60 0.85 42,807.70 1.40 70,506.80
810-01 concrete railing (barrier) 240.00   LNFT 60.00 14,400.00 65.00 15,600.00 70.00 16,800.00 190.00 45,600.00
813-01 concrete approach slabs 400.00   SQYD 208.50 83,400.00 225.00 90,000.00 190.00 76,000.00 280.00 112,000.00
S-101 special guard rail anchor section 1      EACH 1,248.50 1,248.50 1,000.00 1,000.00 1,200.00 1,200.00 1,045.00 1,045.00
                       
 CONTRACTOR TOTAL       613,239.11   724,941.00   837,235.10   992,387.10
 
Item Number Item Description Quantity Unit of Measure - 5 -
GUINN BROTHERS, LLC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-A-01 removal of bridges - str. no. 58308300803511 (sta.
102+24.80 ; 122' x 24' concrete deck girder
bridge)
1      EACH 35,000.00 35,000.00            
202-02-G removal of surfacing & stabilized base 232.5    SQYD 25.00 5,812.50            
202-02-H removal of guard rail 472      LNFT 8.00 3,776.00            
203-02 drainage excavation 550      CUYD 15.00 8,250.00            
203-06 excavation & embankment lump      LUMP 15,000.00 15,000.00            
502-01 superpave asphaltic concrete 324.8    TON 328.00 106,534.40            
509-01 cold planing asphaltic pavement 678      SQYD 23.00 15,594.00            
509-02 contractor retained reclaimed asphaltic pavement - 33      CUYD 0.00 0.00            
704-03 blocked out guard rail 62.5    LNFT 35.00 2,187.50            
704-08-B guard rail transitions (double thrie beam) 83.3    LNFT 70.00 5,831.00            
704-11-A guard rail end treatment (flared) 1      EACH 3,500.00 3,500.00            
704-11-B guard rail end treatment (tangent) 2      EACH 3,700.00 7,400.00            
708-01 right-of-way monument 4      EACH 800.00 3,200.00            
708-02 right-of-way monument witness post 4      EACH 800.00 3,200.00            
712-04 flexible revetment 490      SQYD 100.00 49,000.00            
713-01 temporary signs & barricades lump      LUMP 18,000.00 18,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.009  MILE 10,000.00 90.00            
713-05-A temporary pavement markings (solid line)(4" width) 0.268  MILE 2,500.00 670.00            
713-07 temporary reflectorized raised pavement markers 11      EACH 50.00 550.00            
727-01 mobilization lump      LUMP 125,000.00 125,000.00            
729-16-C object marker assembly (type 3) 4      EACH 125.00 500.00            
731-02 reflectorized raised pavement markers 11      EACH 50.00 550.00            
732-02-A plastic pavement striping (solid line) (4" width) 0.268  MILE 10,000.00 2,680.00            
732-03-A plastic pavement striping (broken line)(4" width) 0.009  MILE 10,000.00 90.00            
739-01 hydro-seeding 0.15   ACRE 25,000.00 3,750.00            
740-01 construction layout lump      LUMP 20,000.00 20,000.00            
744-01 traffic control management lump      LUMP 50,000.00 50,000.00            
804-01-B precast concrete piles (14") 1,715      LNFT 68.00 116,620.00            
804-12 loading permanent piles 1      EACH 1.00 1.00            
805-01-F class a concrete (bents) 56.80   CUYD 1,500.00 85,200.00            
805-03 class aa concrete 236.22   CUYD 1,000.00 236,220.00            
806-01 deformed reinforcing steel 50,362      LB 1.08 54,390.96            
810-01 concrete railing (barrier) 240.00   LNFT 90.00 21,600.00            
813-01 concrete approach slabs 400.00   SQYD 228.00 91,200.00            
S-101 special guard rail anchor section 1      EACH 2,000.00 2,000.00            
                       
 CONTRACTOR TOTAL       1,093,397.36            