Letting of 1/31/2007 LA DOTD Headquarters


REBID
go back
Go Back
 
Lead Project: 807-14-0003
Parish: BIENVILLE
Routes: LA 519
Description: JUNCTION LA 798-1 TO JUNCTION LA 798-2
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement
overlay, and related work.
Estimated Construction Cost: $89,979.07
 
RankLicenseBidderConstruction Bid
1 17464 BENTON & BROWN, LLC. $201,581.70
2 08584 MADDEN CONTRACTING CO., INC. $266,668.25
 
Item Number Item Description Quantity Unit of Measure - 1 -
BENTON & BROWN, LLC.
- 2 -
MADDEN CONTRACTING CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 4      SQYD 200.00 800.00 25.00 100.00        
203-08-A borrow (vehicular meas.)(selected soils) 100      CUYD 30.00 3,000.00 20.00 2,000.00        
502-01 superpave asphaltic concrete 638.1    TON 110.00 70,191.00 110.00 70,191.00        
502-01-A superpave asphaltic concrete,drives,turnouts and
miscellaneous
287.4    TON 110.00 31,614.00 155.00 44,547.00        
509-01 cold planing asphaltic pavement 3,222      SQYD 5.00 16,110.00 5.75 18,526.50        
509-02 contractor retained reclaimed asphaltic pavement - 90      CUYD 1.00 - 90.00 1.00 - 90.00        
701-03-F storm drain pipe (15" rcp/pcp) 18      LNFT 50.00 900.00 100.00 1,800.00        
702-04 adjusting water valves 1      EACH 150.00 150.00 300.00 300.00        
702-04-A adjusting manholes 2      EACH 300.00 600.00 500.00 1,000.00        
706-01-A concrete walk (4" thick) 4.4    SQYD 60.00 264.00 40.00 176.00        
706-03-A incidental concrete paving (4" thick) 160.0    SQYD 60.00 9,600.00 40.00 6,400.00        
713-01 temporary signs & barricades lump      LUMP 16,000.00 16,000.00 32,900.00 32,900.00        
713-03-E temporary pavement markings (24" width) 22      LNFT 2.50 55.00 10.00 220.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
0.550  MILE 400.00 220.00 325.00 178.75        
713-07 temporary reflectorized raised pavement markers 74      EACH 7.00 518.00 5.00 370.00        
716-01-B mulch (fiber) 0.34   ACRE 1,200.00 408.00 5,000.00 1,700.00        
724-01-A pavement patching (6" minimum thickness) 93      SQYD 100.00 9,300.00 86.00 7,998.00        
727-01 mobilization lump      LUMP 16,000.00 16,000.00 32,900.00 32,900.00        
731-02 reflectorized raised pavement markers 37      EACH 7.00 259.00 10.00 370.00        
732-01-E plastic pavement striping (24" width) 22      LNFT 5.00 110.00 3.00 66.00        
732-02-A plastic pavement striping (solid line) (4" width) 1.009  MILE 3,300.00 3,329.70 7,000.00 7,063.00        
739-01 hydro-seeding 0.34   ACRE 4,200.00 1,428.00 5,000.00 1,700.00        
740-01 construction layout lump      LUMP 4,500.00 4,500.00 10,000.00 10,000.00        
744-01 traffic control management lump      LUMP 2,500.00 2,500.00 7,500.00 7,500.00        
S-001 cleaning existing ditches 200      LNFT 15.00 3,000.00 10.00 2,000.00        
S-002 slotted drains 90      LNFT 100.00 9,000.00 170.00 15,300.00        
S-003 saw cutting concrete drives (4" depth) 121      LNFT 15.00 1,815.00 12.00 1,452.00        
                       
 CONTRACTOR TOTAL       201,581.70   266,668.25        