| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - R. E. HEIDT CONSTRUCTION CO., INC. |
DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
250   |
LNFT |
10.00 |
2,500.00 |
10.00 |
2,500.00 |
14.00 |
3,500.00 |
6.00 |
1,500.00 |
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
50.00 |
5,000.00 |
48.00 |
4,800.00 |
78.00 |
7,800.00 |
38.00 |
3,800.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,607   |
CUYD |
65.00 |
104,455.00 |
82.00 |
131,774.00 |
80.00 |
128,560.00 |
81.93 |
131,661.51 |
| 502-01 |
superpave asphaltic concrete
|
7,252.6 |
TON |
76.50 |
554,823.90 |
84.00 |
609,218.40 |
103.00 |
747,017.80 |
80.36 |
582,818.94 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
14.1 |
TON |
200.00 |
2,820.00 |
350.00 |
4,935.00 |
380.00 |
5,358.00 |
765.17 |
10,788.90 |
| 509-01 |
cold planing asphaltic pavement
|
900   |
SQYD |
20.00 |
18,000.00 |
8.00 |
7,200.00 |
5.00 |
4,500.00 |
10.18 |
9,162.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 22   |
CUYD |
0.01 |
- 0.22 |
1.00 |
- 22.00 |
7.00 |
- 154.00 |
1.00 |
- 22.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
34.00 |
3,400.00 |
33.00 |
3,300.00 |
36.10 |
3,610.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
76.0 |
LNFT |
60.00 |
4,560.00 |
54.00 |
4,104.00 |
50.35 |
3,826.60 |
55.31 |
4,203.56 |
| 704-03 |
blocked out guard rail
|
175.0 |
LNFT |
20.00 |
3,500.00 |
19.00 |
3,325.00 |
18.02 |
3,153.50 |
19.80 |
3,465.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,100.00 |
8,400.00 |
2,014.00 |
8,056.00 |
2,212.46 |
8,849.84 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
3,351.00 |
3,351.00 |
3,680.84 |
3,680.84 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.690 |
MILE |
400.00 |
1,476.00 |
400.00 |
1,476.00 |
881.00 |
3,250.89 |
391.60 |
1,445.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.550 |
MILE |
1.00 |
3.55 |
1.00 |
3.55 |
467.00 |
1,657.85 |
689.21 |
2,446.70 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.140 |
MILE |
1.00 |
0.14 |
1.00 |
0.14 |
933.00 |
130.62 |
1,378.43 |
192.98 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
100.00 |
50,000.00 |
110.00 |
55,000.00 |
135.00 |
67,500.00 |
74.55 |
37,275.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
75,000.00 |
75,000.00 |
35,000.00 |
35,000.00 |
60,000.00 |
60,000.00 |
30,000.00 |
30,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
22   |
EACH |
75.00 |
1,650.00 |
68.00 |
1,496.00 |
64.00 |
1,408.00 |
69.87 |
1,537.14 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
75.00 |
300.00 |
74.20 |
296.80 |
81.51 |
326.04 |
| 731-02 |
reflectorized raised pavement markers
|
488   |
EACH |
5.20 |
2,537.60 |
6.00 |
2,928.00 |
6.00 |
2,928.00 |
8.15 |
3,977.20 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.140 |
MILE |
3,000.00 |
420.00 |
2,900.00 |
406.00 |
2,767.00 |
387.38 |
4,088.29 |
572.36 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.550 |
MILE |
1,500.00 |
5,325.00 |
1,400.00 |
4,970.00 |
1,383.00 |
4,909.65 |
2,042.57 |
7,251.12 |
| 740-01 |
construction layout
|
lump |
LUMP |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
5,531.15 |
5,531.15 |
| 744-01 |
traffic control management
|
lump |
LUMP |
1.00 |
1.00 |
30,000.00 |
30,000.00 |
26,100.00 |
26,100.00 |
10,000.00 |
10,000.00 |
| S-103 |
cleaning and resealing existing longitudinal pavement
joints (bridges) |
76   |
LNFT |
15.00 |
1,140.00 |
10.00 |
760.00 |
14.50 |
1,102.00 |
15.72 |
1,194.72 |
| S-104 |
cleaning and resealing existing transverse pavement
joints (bridges) |
72   |
LNFT |
15.00 |
1,080.00 |
11.00 |
792.00 |
14.50 |
1,044.00 |
15.72 |
1,131.84 |
| S-122 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay (bridges) |
76   |
LNFT |
6.00 |
456.00 |
11.00 |
836.00 |
5.30 |
402.80 |
5.82 |
442.32 |
| S-123 |
sawing and sealing transverse joints in asphaltic
concrete overlay (bridges) |
120   |
LNFT |
6.00 |
720.00 |
7.00 |
840.00 |
5.30 |
636.00 |
5.82 |
698.40 |
| S-127 |
sawcuts in asphaltic concrete lifts (bridges)
|
196   |
LNFT |
2.00 |
392.00 |
2.00 |
392.00 |
1.10 |
215.60 |
1.16 |
227.36 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
860,260.97 |
|
928,334.09 |
|
1,115,238.49 |
|
IRREGULAR |
|