| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUTCON, INC. |
GARRETT-LABORDE CONSTRUCTION LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
970   |
SQYD |
15.00 |
14,550.00 |
10.00 |
9,700.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
154.0 |
LNFT |
10.00 |
1,540.00 |
20.00 |
3,080.00 |
|
|
|
|
| 202-02-I |
removal of asphalt surfacing
|
95.0 |
SQYD |
15.00 |
1,425.00 |
10.00 |
950.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
400   |
CUYD |
25.00 |
10,000.00 |
15.00 |
6,000.00 |
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp)
|
60   |
LNFT |
90.00 |
5,400.00 |
45.00 |
2,700.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 705-06-D |
chain link fence (7-foot high)
|
150.0 |
LNFT |
25.00 |
3,750.00 |
25.00 |
3,750.00 |
|
|
|
|
| 705-07-D |
4-foot single gates for chain link fence (7-foot high)
|
1   |
EACH |
250.00 |
250.00 |
500.00 |
500.00 |
|
|
|
|
| 706-01-B |
concrete walk (5" thick)
|
2,710.0 |
SQYD |
45.00 |
121,950.00 |
NO BID |
NO BID |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
272.0 |
SQYD |
48.50 |
13,192.00 |
40.00 |
10,880.00 |
|
|
|
|
| 707-01 |
concrete curb
|
30.0 |
LNFT |
50.00 |
1,500.00 |
30.00 |
900.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 18" thickness)
|
582   |
SQYD |
80.00 |
46,560.00 |
60.00 |
34,920.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 714-01-A |
slab sodding(zoysia)
|
1,160   |
SQYD |
10.00 |
11,600.00 |
7.50 |
8,700.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
14,000.00 |
14,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
33.0 |
SQFT |
35.00 |
1,155.00 |
50.00 |
1,650.00 |
|
|
|
|
| 729-21 |
u-channel post
|
14   |
EACH |
55.00 |
770.00 |
125.00 |
1,750.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
720   |
LNFT |
0.60 |
432.00 |
2.00 |
1,440.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
390   |
LNFT |
1.75 |
682.50 |
3.00 |
1,170.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
268   |
LNFT |
3.00 |
804.00 |
4.75 |
1,273.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
6,400.00 |
6,400.00 |
|
|
|
|
| S-001 |
safety rail
|
70   |
LNFT |
200.00 |
14,000.00 |
75.00 |
5,250.00 |
|
|
|
|
| S-002 |
truncated dome detectable warning surface
|
280   |
SQFT |
15.00 |
4,200.00 |
10.00 |
2,800.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
299,260.50 |
|
145,313.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
additive alternate a1
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
additive alternate a1
|
|
|
|
|
|
|
|
|
|
|
| 201-01-A |
clearing & grubbing
|
lump |
LUMP |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-E-A |
removal of concrete curbs
|
65.0 |
LNFT |
10.00 |
650.00 |
25.00 |
1,625.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular measurement)
|
200   |
CUYD |
25.00 |
5,000.00 |
15.00 |
3,000.00 |
|
|
|
|
| 701-01-G-A |
cross drain pipe (18" rcp)
|
92   |
LNFT |
80.00 |
7,360.00 |
50.00 |
4,600.00 |
|
|
|
|
| 702-03-A-A |
catch basins (cb-01)
|
1   |
EACH |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 706-01-B-A |
concrete walk (5" thick)
|
262.0 |
SQYD |
45.00 |
11,790.00 |
35.00 |
9,170.00 |
|
|
|
|
| 706-01-C-A |
concrete walk (6" thick)
|
36.0 |
SQYD |
48.50 |
1,746.00 |
45.00 |
1,620.00 |
|
|
|
|
| 713-01-A |
temporary signs & barricades
|
lump |
LUMP |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 714-01-A-A |
slab sodding(zoysia)
|
215   |
SQYD |
15.00 |
3,225.00 |
12.50 |
2,687.50 |
|
|
|
|
| 729-01-A |
sign (type a)
|
15.0 |
SQFT |
35.00 |
525.00 |
10.00 |
150.00 |
|
|
|
|
| 729-21-A |
u-channel post
|
5   |
EACH |
55.00 |
275.00 |
125.00 |
625.00 |
|
|
|
|
| 740-01-A |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 744-01-A |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| S-001-A |
safety rail
|
20   |
LNFT |
200.00 |
4,000.00 |
100.00 |
2,000.00 |
|
|
|
|
| S-002-A |
truncated dome detectable warning surface
|
100   |
SQFT |
15.00 |
1,500.00 |
12.00 |
1,200.00 |
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
45,571.00 |
|
35,177.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B |
additive alternate b1
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE B1 |
additive alternate b1
|
|
|
|
|
|
|
|
|
|
|
| 730-05-A-B |
light pole (10 ft. cast aluminum,decorative)
|
15   |
EACH |
2,530.00 |
37,950.00 |
2,550.00 |
38,250.00 |
|
|
|
|
| 730-07-A-B |
luminaire (150 watt hps lamp)
|
15   |
EACH |
1,193.50 |
17,902.50 |
1,300.00 |
19,500.00 |
|
|
|
|
| 730-09-B |
electrical system
|
lump |
LUMP |
16,500.00 |
16,500.00 |
27,500.00 |
27,500.00 |
|
|
|
|
| | SUBTOTAL ALT B1 |
|
|
|
72,352.50 |
|
85,250.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C |
additive alternate c1
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE C1 |
additive alternate c1
|
|
|
|
|
|
|
|
|
|
|
| 706-01-B-C |
concrete walk (5" thick)
|
27.0 |
SQYD |
45.00 |
1,215.00 |
60.00 |
1,620.00 |
|
|
|
|
| S-003 |
benches
|
3   |
EACH |
2,000.00 |
6,000.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| S-004 |
trash receptacles
|
3   |
EACH |
1,300.00 |
3,900.00 |
500.00 |
1,500.00 |
|
|
|
|
| | SUBTOTAL ALT C1 |
|
|
|
11,115.00 |
|
6,120.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
428,299.00 |
|
IRREGULAR |
|
|
|
|
|