| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. MILLER CONSTRUCTION LLC |
- 2 - K.A.S. CONSTRUCTION LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
35,500.00 |
35,500.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,900.00 |
2,900.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 203-03 |
muck excavation
|
1,545   |
CUYD |
9.10 |
14,059.50 |
28.00 |
43,260.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
38,000.00 |
38,000.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,991   |
CUYD |
25.00 |
49,775.00 |
21.00 |
41,811.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp)
|
48   |
LNFT |
36.00 |
1,728.00 |
65.00 |
3,120.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp)
|
16   |
LNFT |
60.00 |
960.00 |
110.00 |
1,760.00 |
|
|
|
|
| 701-03-P |
storm drain pipe (54" rcp)
|
64   |
LNFT |
185.00 |
11,840.00 |
145.00 |
9,280.00 |
|
|
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
48   |
LNFT |
90.00 |
4,320.00 |
165.00 |
7,920.00 |
|
|
|
|
| 701-04-H |
storm drain pipe arch (48" equiv. rcpa)
|
16   |
LNFT |
175.00 |
2,800.00 |
180.00 |
2,880.00 |
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
400.00 |
1,600.00 |
1,500.00 |
6,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
6   |
EACH |
5,500.00 |
33,000.00 |
3,200.00 |
19,200.00 |
|
|
|
|
| 702-03-A-01 |
catch basins (cb-01)(open top)
|
1   |
EACH |
4,500.00 |
4,500.00 |
2,600.00 |
2,600.00 |
|
|
|
|
| 705-06-C |
chain link fence (6-foot height)
|
70   |
LNFT |
29.00 |
2,030.00 |
24.00 |
1,680.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,104.4 |
SQYD |
50.00 |
55,220.00 |
40.00 |
44,176.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
37.3 |
SQYD |
212.00 |
7,907.60 |
65.00 |
2,424.50 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
26   |
SQYD |
197.00 |
5,122.00 |
98.00 |
2,548.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,500.00 |
12,500.00 |
18,000.00 |
18,000.00 |
|
|
|
|
| 716-01-B |
mulch (fiber)
|
1.21 |
ACRE |
700.00 |
847.00 |
1,400.00 |
1,694.00 |
|
|
|
|
| 726-01 |
bedding material
|
28.0 |
CUYD |
95.00 |
2,660.00 |
110.00 |
3,080.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
24,500.00 |
24,500.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
96   |
LNFT |
11.00 |
1,056.00 |
25.00 |
2,400.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
1.21 |
ACRE |
1,650.00 |
1,996.50 |
1,750.00 |
2,117.50 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
channel drain
|
14   |
EACH |
300.00 |
4,200.00 |
325.00 |
4,550.00 |
|
|
|
|
| S-002 |
detectable warning
|
192   |
SQFT |
13.00 |
2,496.00 |
55.00 |
10,560.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
324,517.60 |
|
391,061.00 |
|
|
|
|
|