| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GLYNN W. LEONARD, INC. |
- 2 - COASTAL BRIDGE CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
136,000.00 |
136,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta.1+165.054;29.80 m x 6.94 m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta.1+158.669;16.98 m x 6.87 m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridge(sta.1+153.725;19.43 m x 4.70 m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
65,000.00 |
65,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
160   |
ea |
10.00 |
1,600.00 |
10.00 |
1,600.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
40   |
ln m |
25.00 |
1,000.00 |
25.00 |
1,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
21   |
ea |
300.00 |
6,300.00 |
200.00 |
4,200.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
260   |
ln m |
16.40 |
4,264.00 |
8.00 |
2,080.00 |
|
|
|
|
| 302-01 |
class ii base course
|
330.6 |
cu m |
85.00 |
28,101.00 |
155.00 |
51,243.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
51   |
cu m |
115.00 |
5,865.00 |
155.00 |
7,905.00 |
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
82.0 |
cu m |
115.00 |
9,430.00 |
100.00 |
8,200.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
304.4 |
Mg |
260.00 |
79,144.00 |
275.00 |
83,710.00 |
|
|
|
|
| 701-02-P |
cross drain pipe arch (2400 mm equiv. rcpa)
|
76.8 |
ln m |
2,200.00 |
168,960.00 |
2,700.00 |
207,360.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
175.00 |
10,668.00 |
200.00 |
12,192.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
30.48 |
ln m |
115.00 |
3,505.20 |
100.00 |
3,048.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
2,200.00 |
8,800.00 |
2,500.00 |
10,000.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
23   |
ln m |
50.00 |
1,150.00 |
30.00 |
690.00 |
|
|
|
|
| 711-01-C |
riprap (15 kg,360 mm thick )
|
491   |
sq m |
105.00 |
51,555.00 |
90.00 |
44,190.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
491   |
sq m |
4.00 |
1,964.00 |
3.00 |
1,473.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.4 |
hctr |
3,000.00 |
1,200.00 |
4,000.00 |
1,600.00 |
|
|
|
|
| 717-01 |
seeding
|
16   |
kg |
25.00 |
400.00 |
50.00 |
800.00 |
|
|
|
|
| 718-01 |
fertilizer
|
395   |
kg |
1.00 |
395.00 |
3.00 |
1,185.00 |
|
|
|
|
| 726-01 |
bedding material
|
129.9 |
cu m |
90.00 |
11,691.00 |
55.00 |
7,144.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
60,000.00 |
60,000.00 |
110,000.00 |
110,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
1.86 |
sq m |
190.00 |
353.40 |
200.00 |
372.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
50.00 |
200.00 |
75.00 |
300.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
ea |
75.00 |
900.00 |
100.00 |
1,200.00 |
|
|
|
|
| 729-21 |
u-channel post
|
2   |
ea |
75.00 |
150.00 |
100.00 |
200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
973.0 |
ln m |
140.00 |
136,220.00 |
210.00 |
204,330.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
500.00 |
1,000.00 |
100.00 |
200.00 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
93.06 |
cu m |
1,350.00 |
125,631.00 |
1,800.00 |
167,508.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(90 degree
crossing; 8.5 m rdwy.) |
6   |
span |
28,000.00 |
168,000.00 |
26,200.00 |
157,200.00 |
|
|
|
|
| 805-10-B |
bridge superstructure & substructure(90 degree
crossing; 7.3 m rdwy.) (precast) |
5   |
span |
26,000.00 |
130,000.00 |
26,200.00 |
131,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
4,313   |
kg |
3.00 |
12,939.00 |
2.00 |
8,626.00 |
|
|
|
|
| S-101 |
concrete approach slabs(90 degree crossing; 8.5 m
rdwy.) |
2   |
ea |
10,000.00 |
20,000.00 |
7,000.00 |
14,000.00 |
|
|
|
|
| S-102 |
concrete approach slabs(90 degree crossing; 7.3 m
rdwy.) |
2   |
ea |
10,000.00 |
20,000.00 |
7,000.00 |
14,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,362,385.60 |
|
1,468,556.50 |
|
|
|
|
|