Lead Project: 451-06-0139
Parish: OUACHITA, RICHLAND
Routes: I-20
Description: PAVEMENT MARKING REPLACEMENT EAST AND WEST BOUND LANES
Type Const: interstate striping, reflectorized raised pavement markers, and related work.
Estimated Construction Cost: $513,823.20
 
RankLicenseBidderConstruction Bid
1 24518 HIGHWAY GRAPHICS INC. $479,015.20
2 06799 PAV'T-MARK. CO, DIV OF GULF IND INC $532,616.42
 
Item Number Item Description Quantity Unit of Measure - 1 -
HIGHWAY GRAPHICS INC.
- 2 -
PAV'T-MARK. CO, DIV OF GULF IND INC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 45,000.00 45,000.00        
727-01 mobilization lump      LUMP 30,000.00 30,000.00 95,000.00 95,000.00        
731-02 reflectorized raised pavement markers 9,700      EACH 2.30 22,310.00 5.10 49,470.00        
732-02-A plastic pavement striping (solid line) (4" width) 35.984  MILE 2,700.00 97,156.80 2,310.00 83,123.04        
732-02-A-03 plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness)
50.188  MILE 1,400.00 70,263.20 1,160.00 58,218.08        
732-02-C plastic pavement striping (solid line) (8" width) 1.100  MILE 8,000.00 8,800.00 4,700.00 5,170.00        
732-02-C-03 plast pvmt striping(solid line)(8"width) hot appl
thermo (40 mil thickness)
1.100  MILE 8,000.00 8,800.00 2,300.00 2,530.00        
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
18.300  MILE 5,500.00 100,650.00 3,613.00 66,117.90        
732-03-A-03 plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thickness)
25.300  MILE 900.00 22,770.00 610.00 15,433.00        
732-05 removal of existing markings 17.992  MILE 4,350.00 78,265.20 5,700.00 102,554.40        
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00        
                       
 CONTRACTOR TOTAL       479,015.20   532,616.42        