Lead Project: 384-02-0041
Parish: CAMERON
Routes: LA 82
Description: MIDDLE RIDGE RD. - CONSTANCE BEACH
Type Const: grading, superpave asphaltic concrete overlay, pavement patching and related work.
Estimated Construction Cost: $1,820,367.79
 
RankLicenseBidderConstruction Bid
1 00183 R. E. HEIDT CONSTRUCTION CO., INC. $1,902,300.40
2 14096 BESSETTE DEVELOPMENT CORP. $1,956,560.02
3 34356 PRAIRIE CONTRACTORS INC. $2,205,220.89
 
Item Number Item Description Quantity Unit of Measure - 1 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 2 -
BESSETTE DEVELOPMENT CORP.
- 3 -
PRAIRIE CONTRACTORS INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 105.00 105.00 700.00 700.00 1,000.00 1,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
3,374      CUYD 66.00 222,684.00 98.50 332,339.00 87.00 293,538.00    
502-01 superpave asphaltic concrete 16,455.2    TON 86.00 1,415,147.20 82.00 1,349,326.40 85.00 1,398,692.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
605.8    TON 142.00 86,023.60 93.50 56,642.30 85.00 51,493.00    
701-01-I cross drain pipe (24" rcp) 4      LNFT 105.00 420.00 200.00 800.00 1,300.00 5,200.00    
701-15 concrete collar 1      EACH 1,050.00 1,050.00 750.00 750.00 1,500.00 1,500.00    
713-01 temporary signs & barricades lump      LUMP 6,151.00 6,151.00 6,000.00 6,000.00 100,000.00 100,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
8.200  MILE 458.00 3,755.60 1,575.00 12,915.00 500.00 4,100.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
8.022  MILE 315.00 2,526.93 345.00 2,767.59 1.00 8.02    
713-05-A temporary pavement markings (solid line)(4" width) 16.872  MILE 630.00 10,629.36 690.00 11,641.68 1.00 16.87    
724-01-B pavement patching (12" minimum thickness) 1,000      SQYD 60.00 60,000.00 78.55 78,550.00 90.00 90,000.00    
726-01 bedding material 2.2    CUYD 105.00 231.00 150.00 330.00 500.00 1,100.00    
727-01 mobilization lump      LUMP 16,240.00 16,240.00 25,500.00 25,500.00 200,000.00 200,000.00    
729-16-B object marker assembly (type 2) 56      EACH 52.50 2,940.00 58.00 3,248.00 50.00 2,800.00    
731-02 reflectorized raised pavement markers 1,083      EACH 4.75 5,144.25 5.15 5,577.45 5.00 5,415.00    
732-02-A plastic pavement striping (solid line) (4" width) 16.872  MILE 2,257.50 38,088.54 2,500.00 42,180.00 2,300.00 38,805.60    
732-03-A plastic pavement striping (broken line)(4" width) 8.022  MILE 735.00 5,896.17 800.00 6,417.60 700.00 5,615.40    
735-01 mailboxes 50      EACH 1.05 52.50 1.50 75.00 1.00 50.00    
735-02 mailbox supports (single) 40      EACH 136.50 5,460.00 150.00 6,000.00 130.00 5,200.00    
735-03 mailbox supports (double) 1      EACH 173.25 173.25 200.00 200.00 165.00 165.00    
735-04 mailbox supports (multiple) 2      EACH 273.00 546.00 300.00 600.00 260.00 520.00    
740-01 construction layout lump      LUMP 2,946.00 2,946.00 6,000.00 6,000.00 1.00 1.00    
744-01 traffic control management lump      LUMP 16,090.00 16,090.00 8,000.00 8,000.00 1.00 1.00    
                       
 CONTRACTOR TOTAL       1,902,300.40   1,956,560.02   2,205,220.89    