| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
13,001.54 |
13,001.54 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
61   |
SQYD |
10.00 |
610.00 |
46.62 |
2,843.82 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
4,439   |
CUYD |
12.50 |
55,487.50 |
15.57 |
69,115.23 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
2,663   |
CUYD |
8.00 |
21,304.00 |
17.39 |
46,309.57 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
71,096   |
SQYD |
8.00 |
568,768.00 |
7.85 |
558,103.60 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
123   |
CUYD |
55.00 |
6,765.00 |
97.85 |
12,035.55 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
718.0 |
CUYD |
15.00 |
10,770.00 |
10.57 |
7,589.26 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
14,303.8 |
TON |
90.00 |
1,287,342.00 |
84.43 |
1,207,669.83 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
392.3 |
TON |
150.00 |
58,845.00 |
170.50 |
66,887.15 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
64,517   |
SQYD |
1.50 |
96,775.50 |
1.44 |
92,904.48 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,792   |
CUYD |
0.01 |
- 17.92 |
0.10 |
- 179.20 |
|
|
|
|
| 701-02-H/I-01 |
cross drain pipe arch (48" equiv. rcpa or 54" equiv.
bccspa or 54" equiv. capa) |
40   |
LNFT |
195.00 |
7,800.00 |
325.04 |
13,001.60 |
|
|
|
|
| 701-08 |
relaying pipe
|
4   |
LNFT |
125.00 |
500.00 |
650.08 |
2,600.32 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
130.00 |
1,040.00 |
260.03 |
2,080.24 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
8   |
LNFT |
130.00 |
1,040.00 |
325.04 |
2,600.32 |
|
|
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
550.00 |
1,650.00 |
1,300.15 |
3,900.45 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
47.0 |
SQYD |
62.00 |
2,914.00 |
195.02 |
9,165.94 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
34,714.48 |
34,714.48 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
15.189 |
MILE |
165.00 |
2,506.19 |
166.52 |
2,529.27 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.990 |
MILE |
1.00 |
2.99 |
390.05 |
1,166.25 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
37.144 |
MILE |
1.00 |
37.14 |
780.09 |
28,975.66 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
9.56 |
ACRE |
850.00 |
8,126.00 |
666.45 |
6,371.26 |
|
|
|
|
| 717-01 |
seeding
|
430   |
LB |
8.25 |
3,547.50 |
8.75 |
3,762.50 |
|
|
|
|
| 718-01 |
fertilizer
|
9,560   |
LB |
0.65 |
6,214.00 |
0.53 |
5,066.80 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
925   |
SQYD |
45.00 |
41,625.00 |
94.16 |
87,098.00 |
|
|
|
|
| 726-01 |
bedding material
|
205.0 |
CUYD |
80.00 |
16,400.00 |
97.51 |
19,989.55 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
158,000.00 |
158,000.00 |
102,349.84 |
102,349.84 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
15   |
EACH |
85.00 |
1,275.00 |
104.01 |
1,560.15 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
670   |
EACH |
6.50 |
4,355.00 |
5.85 |
3,919.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.572 |
MILE |
3,000.00 |
55,716.00 |
2,795.33 |
51,914.87 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.495 |
MILE |
1,500.00 |
2,242.50 |
910.11 |
1,360.61 |
|
|
|
|
| 735-01 |
mailboxes
|
25   |
EACH |
1.00 |
25.00 |
21.62 |
540.50 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
20   |
EACH |
135.00 |
2,700.00 |
159.75 |
3,195.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
185.00 |
185.00 |
827.89 |
827.89 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
350.00 |
350.00 |
905.71 |
905.71 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
30,813.65 |
30,813.65 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
25,000.00 |
25,000.00 |
54,759.06 |
54,759.06 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
36.11 |
CUYD |
1,000.00 |
36,110.00 |
2,340.28 |
84,507.51 |
|
|
|
|
| 805-12-L |
reinforced concrete box culverts (8'x 5')
|
152.0 |
LNFT |
800.00 |
121,600.00 |
1,040.12 |
158,098.24 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,630   |
LB |
2.50 |
6,575.00 |
3.25 |
8,547.50 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
25,000.00 |
25,000.00 |
32,503.85 |
32,503.85 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
300   |
LNFT |
12.00 |
3,600.00 |
19.50 |
5,850.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,767,785.40 |
|
IRREGULAR |
|
|
|
|
|