February 06, 2014 Error processing SSI file

Letting of 1/31/2007 LA DOTD Headquarters


READV
go back
Go Back
DBE GOAL FED
Lead Project: 313-01-0007
Parish: UNION
Routes: LA 549
Description: LA 15 - LA 348
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete pavement, pavement patching and related work.
Estimated Construction Cost: $2,734,645.20
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $2,767,785.40
 12487 DIAMOND B CONSTRUCTION CO., L.L.C. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.

DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00 13,001.54 13,001.54        
202-02-D removal of concrete walks & drives 61      SQYD 10.00 610.00 46.62 2,843.82        
203-08 borrow (vehicular measurement) 4,439      CUYD 12.50 55,487.50 15.57 69,115.23        
203-08-A borrow (vehicular meas.)(selected soils) 2,663      CUYD 8.00 21,304.00 17.39 46,309.57        
308-01-A in-place cement treated base course (12" thick) 71,096      SQYD 8.00 568,768.00 7.85 558,103.60        
401-02 aggregate surface course (adjusted vehicular
measurement)
123      CUYD 55.00 6,765.00 97.85 12,035.55        
402-01 traffic maintenance aggregate (vehicular measurement) 718.0    CUYD 15.00 10,770.00 10.57 7,589.26        
502-01 superpave asphaltic concrete 14,303.8    TON 90.00 1,287,342.00 84.43 1,207,669.83        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
392.3    TON 150.00 58,845.00 170.50 66,887.15        
509-01 cold planing asphaltic pavement 64,517      SQYD 1.50 96,775.50 1.44 92,904.48        
509-02 contractor retained reclaimed asphaltic pavement - 1,792      CUYD 0.01 - 17.92 0.10 - 179.20        
701-02-H/I-01 cross drain pipe arch (48" equiv. rcpa or 54" equiv.
bccspa or 54" equiv. capa)
40      LNFT 195.00 7,800.00 325.04 13,001.60        
701-08 relaying pipe 4      LNFT 125.00 500.00 650.08 2,600.32        
701-10-I reinforced concrete pipe (extension)(24") 8      LNFT 130.00 1,040.00 260.03 2,080.24        
701-10-K reinforced concrete pipe (extension)(30") 8      LNFT 130.00 1,040.00 325.04 2,600.32        
701-15 concrete collar 3      EACH 550.00 1,650.00 1,300.15 3,900.45        
706-02-C concrete drive (6" thick) 47.0    SQYD 62.00 2,914.00 195.02 9,165.94        
713-01 temporary signs & barricades lump      LUMP 75,000.00 75,000.00 34,714.48 34,714.48        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
15.189  MILE 165.00 2,506.19 166.52 2,529.27        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.990  MILE 1.00 2.99 390.05 1,166.25        
713-05-A temporary pavement markings (solid line)(4" width) 37.144  MILE 1.00 37.14 780.09 28,975.66        
716-01-A mulch (vegetative) 9.56   ACRE 850.00 8,126.00 666.45 6,371.26        
717-01 seeding 430      LB 8.25 3,547.50 8.75 3,762.50        
718-01 fertilizer 9,560      LB 0.65 6,214.00 0.53 5,066.80        
724-01-B pavement patching (12" minimum thickness) 925      SQYD 45.00 41,625.00 94.16 87,098.00        
726-01 bedding material 205.0    CUYD 80.00 16,400.00 97.51 19,989.55        
727-01 mobilization lump      LUMP 158,000.00 158,000.00 102,349.84 102,349.84        
729-16-C object marker assembly (type 3) 15      EACH 85.00 1,275.00 104.01 1,560.15        
731-02 reflectorized raised pavement markers 670      EACH 6.50 4,355.00 5.85 3,919.50        
732-02-A plastic pavement striping (solid line) (4" width) 18.572  MILE 3,000.00 55,716.00 2,795.33 51,914.87        
732-03-A plastic pavement striping (broken line)(4" width) 1.495  MILE 1,500.00 2,242.50 910.11 1,360.61        
735-01 mailboxes 25      EACH 1.00 25.00 21.62 540.50        
735-02 mailbox supports (single) 20      EACH 135.00 2,700.00 159.75 3,195.00        
735-03 mailbox supports (double) 1      EACH 185.00 185.00 827.89 827.89        
735-04 mailbox supports (multiple) 1      EACH 350.00 350.00 905.71 905.71        
740-01 construction layout lump      LUMP 30,000.00 30,000.00 30,813.65 30,813.65        
744-01 traffic control management lump      LUMP 25,000.00 25,000.00 54,759.06 54,759.06        
805-01-B class a concrete (box culvert headwalls) 36.11   CUYD 1,000.00 36,110.00 2,340.28 84,507.51        
805-12-L reinforced concrete box culverts (8'x 5') 152.0    LNFT 800.00 121,600.00 1,040.12 158,098.24        
806-01 deformed reinforcing steel 2,630      LB 2.50 6,575.00 3.25 8,547.50        
S-001 tree trimming lump      LUMP 25,000.00 25,000.00 32,503.85 32,503.85        
S-002 cleaning existing ditches 300      LNFT 12.00 3,600.00 19.50 5,850.00        
                       
 CONTRACTOR TOTAL       2,767,785.40   IRREGULAR        