| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - BARBER BROS. CONTRACTING CO., L.L.C |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
157   |
CUYD |
25.00 |
3,925.00 |
10.00 |
1,570.00 |
25.00 |
3,925.00 |
25.00 |
3,925.00 |
| 204-06 |
temporary silt fencing
|
100   |
LNFT |
2.00 |
200.00 |
2.00 |
200.00 |
7.00 |
700.00 |
5.00 |
500.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,787   |
CUYD |
1.00 |
1,787.00 |
24.00 |
42,888.00 |
20.00 |
35,740.00 |
30.00 |
53,610.00 |
| 502-01 |
superpave asphaltic concrete
|
11,875.0 |
TON |
68.00 |
807,500.00 |
60.00 |
712,500.00 |
68.50 |
813,437.50 |
72.00 |
855,000.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
927.9 |
TON |
1.00 |
927.90 |
6.00 |
5,567.40 |
100.00 |
92,790.00 |
100.00 |
92,790.00 |
| 509-01 |
cold planing asphaltic pavement
|
61,665   |
SQYD |
1.40 |
86,331.00 |
0.75 |
46,248.75 |
3.80 |
234,327.00 |
2.00 |
123,330.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,927   |
CUYD |
1.00 |
- 1,927.00 |
0.01 |
- 19.27 |
0.00 |
0.00 |
0.00 |
0.00 |
| 701-08 |
relaying pipe
|
8   |
LNFT |
300.00 |
2,400.00 |
300.00 |
2,400.00 |
115.00 |
920.00 |
300.00 |
2,400.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
1,600.00 |
3,200.00 |
1,000.00 |
2,000.00 |
1,800.00 |
3,600.00 |
1,200.00 |
2,400.00 |
| 702-07-C |
cross drain safety end (type 3)
|
4   |
EACH |
4,000.00 |
16,000.00 |
3,000.00 |
12,000.00 |
3,700.00 |
14,800.00 |
7,500.00 |
30,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
95,000.00 |
95,000.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
33   |
LNFT |
1.00 |
33.00 |
0.60 |
19.80 |
4.00 |
132.00 |
4.00 |
132.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.710 |
MILE |
170.00 |
2,330.70 |
500.00 |
6,855.00 |
400.00 |
5,484.00 |
250.00 |
3,427.50 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.710 |
MILE |
1.00 |
13.71 |
10.00 |
137.10 |
450.00 |
6,169.50 |
425.00 |
5,826.75 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
27.960 |
MILE |
1.00 |
27.96 |
10.00 |
279.60 |
1.00 |
27.96 |
450.00 |
12,582.00 |
| 717-01 |
seeding
|
33   |
LB |
25.00 |
825.00 |
12.00 |
396.00 |
25.00 |
825.00 |
25.00 |
825.00 |
| 718-01 |
fertilizer
|
1,100   |
LB |
1.20 |
1,320.00 |
1.00 |
1,100.00 |
1.15 |
1,265.00 |
150.00 |
165,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,500   |
SQYD |
75.00 |
112,500.00 |
100.00 |
150,000.00 |
50.00 |
75,000.00 |
80.00 |
120,000.00 |
| 726-01 |
bedding material
|
1.5 |
CUYD |
120.00 |
180.00 |
100.00 |
150.00 |
175.00 |
262.50 |
80.00 |
120.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
95,000.00 |
95,000.00 |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
40,000.00 |
40,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
18   |
EACH |
85.00 |
1,530.00 |
85.00 |
1,530.00 |
90.00 |
1,620.00 |
90.00 |
1,620.00 |
| 731-02 |
reflectorized raised pavement markers
|
603   |
EACH |
5.50 |
3,316.50 |
6.00 |
3,618.00 |
6.00 |
3,618.00 |
6.00 |
3,618.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
11   |
LNFT |
7.00 |
77.00 |
3.00 |
33.00 |
3.75 |
41.25 |
5.00 |
55.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.320 |
MILE |
2,500.00 |
23,300.00 |
2,500.00 |
23,300.00 |
2,800.00 |
26,096.00 |
2,800.00 |
26,096.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.570 |
MILE |
750.00 |
3,427.50 |
800.00 |
3,656.00 |
800.00 |
3,656.00 |
1,000.00 |
4,570.00 |
| 735-01 |
mailboxes
|
31   |
EACH |
7.00 |
217.00 |
7.00 |
217.00 |
7.00 |
217.00 |
10.00 |
310.00 |
| 735-02 |
mailbox supports (single)
|
31   |
EACH |
135.00 |
4,185.00 |
130.00 |
4,030.00 |
150.00 |
4,650.00 |
150.00 |
4,650.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
69,000.00 |
69,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
75,000.00 |
75,000.00 |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
| S-001 |
cleaning existing ditches
|
400   |
LNFT |
9.00 |
3,600.00 |
15.00 |
6,000.00 |
11.50 |
4,600.00 |
15.00 |
6,000.00 |
| S-002 |
u-channel post installation
|
32   |
EACH |
70.00 |
2,240.00 |
70.00 |
2,240.00 |
70.00 |
2,240.00 |
70.00 |
2,240.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,220,467.27 |
|
1,367,916.38 |
|
1,561,143.71 |
|
1,621,027.25 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
157   |
CUYD |
44.00 |
6,908.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
100   |
LNFT |
17.00 |
1,700.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,787   |
CUYD |
15.00 |
26,805.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
11,875.0 |
TON |
66.00 |
783,750.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
927.9 |
TON |
95.00 |
88,150.50 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
61,665   |
SQYD |
1.00 |
61,665.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,927   |
CUYD |
1.00 |
- 1,927.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
8   |
LNFT |
110.00 |
880.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
1,100.00 |
2,200.00 |
|
|
|
|
|
|
| 702-07-C |
cross drain safety end (type 3)
|
4   |
EACH |
5,500.00 |
22,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,600.00 |
6,600.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
33   |
LNFT |
1.00 |
33.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.710 |
MILE |
275.00 |
3,770.25 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.710 |
MILE |
385.00 |
5,278.35 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
27.960 |
MILE |
825.00 |
23,067.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
33   |
LB |
22.00 |
726.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
1,100   |
LB |
1.10 |
1,210.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,500   |
SQYD |
120.00 |
180,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
1.5 |
CUYD |
82.50 |
123.75 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
46,000.00 |
46,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
18   |
EACH |
82.50 |
1,485.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
603   |
EACH |
5.50 |
3,316.50 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
11   |
LNFT |
3.30 |
36.30 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.320 |
MILE |
2,400.00 |
22,368.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.570 |
MILE |
880.00 |
4,021.60 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
31   |
EACH |
6.60 |
204.60 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
31   |
EACH |
130.00 |
4,030.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
28,000.00 |
28,000.00 |
|
|
|
|
|
|
| S-001 |
cleaning existing ditches
|
400   |
LNFT |
11.00 |
4,400.00 |
|
|
|
|
|
|
| S-002 |
u-channel post installation
|
32   |
EACH |
66.00 |
2,112.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
IRREGULAR |
|
|
|
|
|
|
|