| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - COASTAL BRIDGE CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
95,000.00 |
95,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
5,000.00 |
5,000.00 |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-A-01 |
removal of bridges(sta. 14+487.175, 8.53m x 23.16m
precast concrete bridge) |
1   |
ea |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,144   |
sq m |
9.57 |
10,948.08 |
30.00 |
34,320.00 |
45.00 |
51,480.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
57.1 |
ln m |
26.24 |
1,498.30 |
36.00 |
2,055.60 |
30.00 |
1,713.00 |
|
|
| 202-02-H |
removal of guard rail
|
95   |
ln m |
15.00 |
1,425.00 |
20.00 |
1,900.00 |
20.00 |
1,900.00 |
|
|
| 202-02-I |
removal of signal equipment
|
lump |
lump |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
3,500.00 |
3,500.00 |
|
|
| 202-02-L |
removal of surfacing and stabilized base
|
1,581   |
sq m |
14.35 |
22,687.35 |
5.00 |
7,905.00 |
11.50 |
18,181.50 |
|
|
| 203-02 |
drainage excavation
|
362   |
cu m |
30.00 |
10,860.00 |
30.00 |
10,860.00 |
11.50 |
4,163.00 |
|
|
| 203-03 |
muck excavation
|
686   |
cu m |
19.62 |
13,459.32 |
20.00 |
13,720.00 |
11.50 |
7,889.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
315,000.00 |
315,000.00 |
250,000.00 |
250,000.00 |
340,000.00 |
340,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
13,911   |
ln m |
3.50 |
48,688.50 |
3.50 |
48,688.50 |
1.00 |
13,911.00 |
|
|
| 302-02-D |
class ii base course (300 mm thick)(stone or recycled
pccp) |
7,647.9 |
sq m |
35.88 |
274,406.65 |
30.00 |
229,437.00 |
37.50 |
286,796.25 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,165   |
cu m |
32.70 |
38,095.50 |
65.00 |
75,725.00 |
70.00 |
81,550.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
400.0 |
cu m |
45.78 |
18,312.00 |
75.00 |
30,000.00 |
48.00 |
19,200.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
14,057.4 |
Mg |
66.12 |
929,475.29 |
75.00 |
1,054,305.00 |
70.00 |
984,018.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
306.7 |
Mg |
110.20 |
33,798.34 |
120.00 |
36,804.00 |
110.00 |
33,737.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
48,605   |
sq m |
3.59 |
174,491.95 |
3.60 |
174,978.00 |
8.90 |
432,584.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,430   |
cu m |
0.01 |
- 24.30 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 701-02-D |
cross drain pipe arch (600 mm equiv. rcpa)
|
97.0 |
ln m |
400.00 |
38,800.00 |
400.00 |
38,800.00 |
400.00 |
38,800.00 |
|
|
| 701-02-E |
cross drain pipe arch (750 mm equiv. rcpa)
|
77.0 |
ln m |
400.00 |
30,800.00 |
400.00 |
30,800.00 |
415.00 |
31,955.00 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
70.0 |
ln m |
250.00 |
17,500.00 |
250.00 |
17,500.00 |
250.00 |
17,500.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
57.5 |
ln m |
330.00 |
18,975.00 |
320.00 |
18,400.00 |
310.00 |
17,825.00 |
|
|
| 701-06-E |
side drain pipe arch (750 mm equiv.)
|
223.0 |
ln m |
330.00 |
73,590.00 |
325.00 |
72,475.00 |
330.00 |
73,590.00 |
|
|
| 701-06-F |
side drain pipe arch (900 mm equiv.)
|
104.5 |
ln m |
450.00 |
47,025.00 |
450.00 |
47,025.00 |
460.00 |
48,070.00 |
|
|
| 701-06-G |
side drain pipe arch (1050 mm equiv.)
|
321.0 |
ln m |
470.00 |
150,870.00 |
470.00 |
150,870.00 |
485.00 |
155,685.00 |
|
|
| 701-06-H |
side drain pipe arch (1200 mm equiv.)
|
54.5 |
ln m |
620.00 |
33,790.00 |
620.00 |
33,790.00 |
640.00 |
34,880.00 |
|
|
| 701-06-I |
side drain pipe arch (1350 mm equiv.)
|
61.0 |
ln m |
850.00 |
51,850.00 |
830.00 |
50,630.00 |
860.00 |
52,460.00 |
|
|
| 701-06-J |
side drain pipe arch (1500 mm equiv.)
|
58.0 |
ln m |
950.00 |
55,100.00 |
950.00 |
55,100.00 |
980.00 |
56,840.00 |
|
|
| 701-09 |
fabricating pipe fittings
|
1   |
ea |
2,200.00 |
2,200.00 |
2,500.00 |
2,500.00 |
2,300.00 |
2,300.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(600 mm)
|
9.7 |
ln m |
350.00 |
3,395.00 |
350.00 |
3,395.00 |
350.00 |
3,395.00 |
|
|
| 701-15 |
concrete collar
|
2   |
ea |
900.00 |
1,800.00 |
500.00 |
1,000.00 |
925.00 |
1,850.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
10   |
ea |
6,500.00 |
65,000.00 |
6,600.00 |
66,000.00 |
7,000.00 |
70,000.00 |
|
|
| 702-07-A |
cross drain safety end (type 1)
|
21   |
ea |
3,700.00 |
77,700.00 |
3,650.00 |
76,650.00 |
3,750.00 |
78,750.00 |
|
|
| 702-08-B |
side drain safety end (type 2)
|
26   |
ea |
3,700.00 |
96,200.00 |
3,500.00 |
91,000.00 |
3,600.00 |
93,600.00 |
|
|
| 702-08-C |
side drain safety end (type 3)
|
19   |
ea |
4,000.00 |
76,000.00 |
4,200.00 |
79,800.00 |
4,300.00 |
81,700.00 |
|
|
| 704-03 |
blocked out guard rail
|
68.58 |
ln m |
75.00 |
5,143.50 |
75.00 |
5,143.50 |
75.00 |
5,143.50 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
200.00 |
6,096.00 |
180.00 |
5,486.40 |
200.00 |
6,096.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
2,700.00 |
10,800.00 |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
|
|
| 705-05 |
double swinging driveway gates
|
2   |
dbgt |
1,400.00 |
2,800.00 |
2,000.00 |
4,000.00 |
1,600.00 |
3,200.00 |
|
|
| 705-06-D |
chain link fence (2100 mm height)
|
85   |
ln m |
100.00 |
8,500.00 |
100.00 |
8,500.00 |
120.00 |
10,200.00 |
|
|
| 705-09 |
rebuilt fence
|
145   |
ln m |
100.00 |
14,500.00 |
150.00 |
21,750.00 |
105.00 |
15,225.00 |
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
931.2 |
sq m |
71.76 |
66,822.91 |
50.00 |
46,560.00 |
58.00 |
54,009.60 |
|
|
| 707-01 |
concrete curb
|
71.4 |
ln m |
59.04 |
4,215.46 |
45.00 |
3,213.00 |
77.00 |
5,497.80 |
|
|
| 708-01 |
right-of-way monument
|
44   |
ea |
175.00 |
7,700.00 |
300.00 |
13,200.00 |
400.00 |
17,600.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
44   |
ea |
175.00 |
7,700.00 |
250.00 |
11,000.00 |
400.00 |
17,600.00 |
|
|
| 712-04 |
flexible revetment
|
304   |
sq m |
100.00 |
30,400.00 |
95.00 |
28,880.00 |
100.00 |
30,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
168,000.00 |
168,000.00 |
75,000.00 |
75,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-03-A |
temporary pavement markings (100 mm width)
|
68,604   |
ln m |
0.50 |
34,302.00 |
0.75 |
51,453.00 |
0.70 |
48,022.80 |
|
|
| 713-03-C |
temporary pavement markings (200 mm width)
|
425   |
ln m |
0.60 |
255.00 |
1.50 |
637.50 |
1.00 |
425.00 |
|
|
| 713-03-E |
temporary pavement markings (600 mm width)
|
786   |
ln m |
2.00 |
1,572.00 |
4.25 |
3,340.50 |
3.00 |
2,358.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
10.110 |
km |
150.00 |
1,516.50 |
350.00 |
3,538.50 |
345.00 |
3,487.95 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
21   |
ea |
25.00 |
525.00 |
60.00 |
1,260.00 |
58.00 |
1,218.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
21   |
ea |
25.00 |
525.00 |
60.00 |
1,260.00 |
58.00 |
1,218.00 |
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
ea |
50.00 |
300.00 |
120.00 |
720.00 |
115.00 |
690.00 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
9,054   |
ea |
5.00 |
45,270.00 |
6.00 |
54,324.00 |
6.00 |
54,324.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
184   |
sq m |
2.50 |
460.00 |
15.00 |
2,760.00 |
3.00 |
552.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
| 724-01-B |
pavement patching (300 mm minimum thickness)
|
566   |
sq m |
83.72 |
47,385.52 |
75.00 |
42,450.00 |
96.00 |
54,336.00 |
|
|
| 726-01 |
bedding material
|
140.0 |
cu m |
70.00 |
9,800.00 |
80.00 |
11,200.00 |
80.00 |
11,200.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
175,000.00 |
175,000.00 |
200,000.00 |
200,000.00 |
350,000.00 |
350,000.00 |
|
|
| 729-01 |
sign (type a)
|
1.95 |
sq m |
300.00 |
585.00 |
350.00 |
682.50 |
115.00 |
224.25 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
75.00 |
300.00 |
85.00 |
340.00 |
95.00 |
380.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,018   |
ea |
6.00 |
18,108.00 |
6.00 |
18,108.00 |
6.00 |
18,108.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
22.868 |
km |
1,700.00 |
38,875.60 |
1,800.00 |
41,162.40 |
1,700.00 |
38,875.60 |
|
|
| 732-02-C |
plastic pavement striping (solid line)(200 mm width)
|
0.175 |
km |
3,000.00 |
525.00 |
3,200.00 |
560.00 |
3,250.00 |
568.75 |
|
|
| 732-02-E |
plastic pavement striping (solid line)(600 mm width)
|
0.262 |
km |
10,000.00 |
2,620.00 |
10,000.00 |
2,620.00 |
10,000.00 |
2,620.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
3.370 |
km |
600.00 |
2,022.00 |
600.00 |
2,022.00 |
570.00 |
1,920.90 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
7   |
ea |
170.00 |
1,190.00 |
200.00 |
1,400.00 |
168.00 |
1,176.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
7   |
ea |
170.00 |
1,190.00 |
200.00 |
1,400.00 |
190.00 |
1,330.00 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
ea |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
490.00 |
980.00 |
|
|
| 735-01 |
mailboxes
|
42   |
ea |
1.00 |
42.00 |
6.00 |
252.00 |
5.00 |
210.00 |
|
|
| 735-02 |
mailbox supports (single)
|
42   |
ea |
135.00 |
5,670.00 |
115.00 |
4,830.00 |
115.00 |
4,830.00 |
|
|
| 736-01 |
trenching and backfilling
|
189   |
ln m |
8.00 |
1,512.00 |
9.00 |
1,701.00 |
9.25 |
1,748.25 |
|
|
| 736-03-A |
jacked or bored conduit (2" pec)
|
44   |
ln m |
45.00 |
1,980.00 |
50.00 |
2,200.00 |
49.00 |
2,156.00 |
|
|
| 736-04 |
signal support (steel strain pole)
|
4   |
ea |
7,000.00 |
28,000.00 |
8,000.00 |
32,000.00 |
7,900.00 |
31,600.00 |
|
|
| 736-05-B |
signal heads (3 section, ryg) led
|
8   |
each |
900.00 |
7,200.00 |
1,000.00 |
8,000.00 |
950.00 |
7,600.00 |
|
|
| 736-05-C |
signal heads (5 section, ryg, lt.y, lt.g) led
|
4   |
each |
1,300.00 |
5,200.00 |
1,500.00 |
6,000.00 |
1,420.00 |
5,680.00 |
|
|
| 736-06 |
signal service
|
1   |
ea |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
|
|
| 736-08-A |
signal controller (naztec ts2, type 2 controller in
type 6 cabinet) |
1   |
ea |
19,000.00 |
19,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
| 736-09 |
loop detector
|
694   |
ln m |
35.00 |
24,290.00 |
40.00 |
27,760.00 |
37.00 |
25,678.00 |
|
|
| 736-10-A |
underground junction box (type d)
|
6   |
ea |
300.00 |
1,800.00 |
350.00 |
2,100.00 |
320.00 |
1,920.00 |
|
|
| 736-10-B |
underground junction box (type e)
|
7   |
ea |
300.00 |
2,100.00 |
400.00 |
2,800.00 |
360.00 |
2,520.00 |
|
|
| 736-10-C |
underground junction box (type h)
|
2   |
ea |
750.00 |
1,500.00 |
850.00 |
1,700.00 |
865.00 |
1,730.00 |
|
|
| 736-10-D |
underground junction box (type f)
|
6   |
ea |
600.00 |
3,600.00 |
600.00 |
3,600.00 |
1,100.00 |
6,600.00 |
|
|
| 736-11-A |
conduit (1/2-in. (1.3 cm) schedule 80 pec conduit)
|
15   |
ln m |
10.00 |
150.00 |
12.00 |
180.00 |
10.00 |
150.00 |
|
|
| 736-11-B |
conduit (1-in. (2.5 cm) schedule 80 pec conduit)
|
189   |
ln m |
8.00 |
1,512.00 |
10.00 |
1,890.00 |
8.50 |
1,606.50 |
|
|
| 736-11-C |
conduit (2-in. (5.1 cm) schedule 80 pec conduit)
|
54   |
ln m |
12.00 |
648.00 |
25.00 |
1,350.00 |
11.50 |
621.00 |
|
|
| 736-11-D |
conduit (3-in. (7.6 cm) schedule 80 pec conduit)
|
6   |
ln m |
18.00 |
108.00 |
20.00 |
120.00 |
18.50 |
111.00 |
|
|
| 736-11-E |
conduit (2-in. (5.1 cm) galvanized rigid steel conduit)
|
3   |
ln m |
31.00 |
93.00 |
40.00 |
120.00 |
32.25 |
96.75 |
|
|
| 736-12-A |
conductor (power - 3c, #6 awg, stranded)
|
70   |
ln m |
15.00 |
1,050.00 |
18.00 |
1,260.00 |
17.25 |
1,207.50 |
|
|
| 736-12-B |
conductor (signal - 6c, #14 awg, stranded)
|
11   |
ln m |
5.00 |
55.00 |
6.00 |
66.00 |
5.75 |
63.25 |
|
|
| 736-12-C |
conductor (signal - 10c, #14 awg, stranded)
|
251   |
ln m |
7.00 |
1,757.00 |
8.00 |
2,008.00 |
8.00 |
2,008.00 |
|
|
| 736-12-D |
conductor (loop lead-in - 2c, #14 awg, shielded and
stranded, imsa 50-2) |
103   |
ln m |
4.00 |
412.00 |
5.00 |
515.00 |
4.50 |
463.50 |
|
|
| 739-01 |
hydro-seeding
|
5   |
hctr |
2,500.00 |
12,500.00 |
3,500.00 |
17,500.00 |
2,550.00 |
12,750.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
105,000.00 |
105,000.00 |
50,000.00 |
50,000.00 |
180,000.00 |
180,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
101,000.00 |
101,000.00 |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
570.0 |
ln m |
200.00 |
114,000.00 |
216.00 |
123,120.00 |
280.00 |
159,600.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
100.00 |
100.00 |
150.00 |
150.00 |
1,150.00 |
1,150.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
39.08 |
cu m |
1,700.00 |
66,436.00 |
2,000.00 |
78,160.00 |
1,200.00 |
46,896.00 |
|
|
| 805-03 |
class aa concrete
|
141.40 |
cu m |
1,000.00 |
141,400.00 |
1,100.00 |
155,540.00 |
900.00 |
127,260.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
18,039   |
kg |
2.00 |
36,078.00 |
2.00 |
36,078.00 |
2.00 |
36,078.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
60.00 |
ln m |
300.00 |
18,000.00 |
315.00 |
18,900.00 |
230.00 |
13,800.00 |
|
|
| 813-01 |
concrete approach slabs
|
295.20 |
sq m |
250.00 |
73,800.00 |
275.00 |
81,180.00 |
260.00 |
76,752.00 |
|
|
| S-001 |
cleaning existing ditches
|
1,539   |
ln m |
25.00 |
38,475.00 |
25.00 |
38,475.00 |
25.00 |
38,475.00 |
|
|
| S-002 |
roadway reinforcing mesh (complete road system)
|
48,605   |
sq m |
8.00 |
388,840.00 |
8.00 |
388,840.00 |
9.35 |
454,456.75 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,757,029.47 |
|
4,791,299.40 |
|
5,460,827.90 |
|
|
|