| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
383   |
CUYD |
16.00 |
6,128.00 |
32.00 |
12,256.00 |
23.00 |
8,809.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
170   |
CUYD |
36.00 |
6,120.00 |
82.00 |
13,940.00 |
115.00 |
19,550.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
5,335.9 |
TON |
80.00 |
426,872.00 |
96.50 |
514,914.35 |
70.00 |
373,513.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
247.6 |
TON |
150.00 |
37,140.00 |
180.00 |
44,568.00 |
133.00 |
32,930.80 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
37,601   |
SQYD |
3.30 |
124,083.30 |
3.50 |
131,603.50 |
3.70 |
139,123.70 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
711   |
SQYD |
12.50 |
8,887.50 |
8.00 |
5,688.00 |
12.00 |
8,532.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 24   |
CUYD |
0.01 |
- 0.24 |
1.00 |
- 24.00 |
1.00 |
- 24.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
3,300.00 |
3,300.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.003 |
MILE |
250.00 |
500.75 |
400.00 |
801.20 |
250.00 |
500.75 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.142 |
MILE |
1.00 |
3.14 |
1.00 |
3.14 |
330.00 |
1,036.86 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
11.114 |
MILE |
1.00 |
11.11 |
1.00 |
11.11 |
660.00 |
7,335.24 |
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
1,060   |
EACH |
1.50 |
1,590.00 |
2.00 |
2,120.00 |
2.00 |
2,120.00 |
|
|
| 717-01 |
seeding
|
33   |
LB |
7.50 |
247.50 |
8.00 |
264.00 |
8.00 |
264.00 |
|
|
| 718-01 |
fertilizer
|
1,100   |
LB |
0.40 |
440.00 |
0.50 |
550.00 |
0.45 |
495.00 |
|
|
| 721-01 |
asphalt mulch
|
2,644   |
GAL |
2.00 |
5,288.00 |
2.50 |
6,610.00 |
2.25 |
5,949.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
120   |
SQYD |
150.00 |
18,000.00 |
134.00 |
16,080.00 |
112.00 |
13,440.00 |
|
|
| 724-01-C |
pavement patching (8.5" minimum thickness)
|
622   |
SQYD |
80.00 |
49,760.00 |
85.00 |
52,870.00 |
83.00 |
51,626.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
35,000.00 |
35,000.00 |
26,000.00 |
26,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
264   |
EACH |
6.55 |
1,729.20 |
6.00 |
1,584.00 |
5.00 |
1,320.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.557 |
MILE |
2,160.00 |
12,003.12 |
2,900.00 |
16,115.30 |
2,400.00 |
13,336.80 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.571 |
MILE |
725.00 |
1,138.98 |
1,250.00 |
1,963.75 |
770.00 |
1,209.67 |
|
|
| 735-01 |
mailboxes
|
7   |
EACH |
1.00 |
7.00 |
10.00 |
70.00 |
22.00 |
154.00 |
|
|
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
125.00 |
375.00 |
140.00 |
420.00 |
165.00 |
495.00 |
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
175.00 |
350.00 |
200.00 |
400.00 |
275.00 |
550.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
12,000.00 |
12,000.00 |
32,000.00 |
32,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
9,000.00 |
9,000.00 |
25,000.00 |
25,000.00 |
8,000.00 |
8,000.00 |
|
|
| S-002 |
saw cutting
|
14,900   |
INFT |
0.90 |
13,410.00 |
0.50 |
7,450.00 |
0.25 |
3,725.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
788,084.36 |
|
935,258.35 |
|
IRREGULAR |
|
|
|