| DBE GOAL FED |
| Lead Project: 088-05-0018 |
| Parish: BIENVILLE, CLAIBORNE |
| Routes: LA 154 |
| Description: JUNCTION I-20 TO JUNCTION LA 518 |
Type Const:
grading, drainage structures, superpave asphaltic concrete pavement, pavement patching,
and related work. |
| Estimated Construction Cost: $1,978,391.85 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
660   |
LNFT |
3.25 |
2,145.00 |
|
|
|
|
|
|
| 202-02-I |
removal of asphalt surfacing from bridge deck and
approaches |
864   |
SQYD |
5.00 |
4,320.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
6,000   |
CUYD |
11.00 |
66,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
150   |
CUYD |
50.00 |
7,500.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
16,095.2 |
TON |
69.00 |
1,110,568.80 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,000.0 |
TON |
90.00 |
180,000.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
4   |
LNFT |
120.00 |
480.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension) (24")
|
266   |
LNFT |
165.00 |
43,890.00 |
|
|
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension) (30")
|
12   |
LNFT |
185.00 |
2,220.00 |
|
|
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension) (36")
|
130   |
LNFT |
200.00 |
26,000.00 |
|
|
|
|
|
|
| 701-10-O |
reinforced concrete pipe (extension) (48")
|
22   |
LNFT |
210.00 |
4,620.00 |
|
|
|
|
|
|
| 701-12-I |
corrugated metal pipe (extension) (24")
|
16   |
LNFT |
163.00 |
2,608.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
59   |
EACH |
300.00 |
17,700.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam) (3'-1 1/2" post spacing)
|
250.0 |
LNFT |
45.00 |
11,250.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam) (6'-3" post spacing)
|
420.0 |
LNFT |
47.00 |
19,740.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
137.5 |
LNFT |
16.00 |
2,200.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,900.00 |
7,600.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,200.00 |
8,800.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
271   |
SQYD |
70.00 |
18,970.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
55,000.00 |
55,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line) (4" width)
(4' length) |
7.029 |
MILE |
325.00 |
2,284.43 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line) (4" width)
(10' length) |
0.877 |
MILE |
300.00 |
263.10 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line) (4" width)
|
24.705 |
MILE |
600.00 |
14,823.00 |
|
|
|
|
|
|
| 713-06-D |
temporary pavement legends & symbols (rr crossing)
|
2   |
EACH |
200.00 |
400.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
13.00 |
ACRE |
1,400.00 |
18,200.00 |
|
|
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
300   |
SQYD |
71.00 |
21,300.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
55,000.00 |
55,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
70.00 |
560.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
929   |
EACH |
4.70 |
4,366.30 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
33   |
LNFT |
3.00 |
99.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
24.705 |
MILE |
2,150.00 |
53,115.75 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
0.877 |
MILE |
700.00 |
613.90 |
|
|
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
10   |
EACH |
1.00 |
10.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
135.00 |
1,350.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
13.00 |
ACRE |
1,600.00 |
20,800.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
290,000.00 |
290,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,120,597.28 |
|
|
|
|
|
|
|