Letting of 1/31/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 055-30-0011
Parish: VERMILION
Routes: LA 14-B
Description: CONTINUOUS LEFT TURN LANE
Type Const: grading, drainage structures, cold planing asph pvmt, superpave asph conc overlay,
cleaning and resealing pvmt joints, pvmt patching, pvmt widening and related work.
Estimated Construction Cost: $2,644,491.50
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $2,780,336.54
2 12312 GILCHRIST CONSTRUCTION CO. LLC $3,569,441.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-C removal of portland cement concrete pavement 100      SQYD 23.00 2,300.00 35.00 3,500.00        
202-02-E removal of concrete curbs 103.0    LNFT 21.50 2,214.50 5.00 515.00        
203-08 borrow (vehicular measurement) 1,820      CUYD 15.00 27,300.00 24.00 43,680.00        
204-02 temporary hay or straw bales 50      EACH 15.00 750.00 20.00 1,000.00        
204-06 temporary silt fencing 512      LNFT 2.50 1,280.00 3.00 1,536.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,351      CUYD 42.00 56,742.00 100.00 135,100.00        
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 35.00 3,500.00 80.00 8,000.00        
502-01 superpave asphaltic concrete 12,678.7    TON 82.00 1,039,653.40 115.00 1,458,050.50        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,002.0    TON 115.00 115,230.00 180.00 180,360.00        
509-01 cold planing asphaltic pavement 778      SQYD 18.00 14,004.00 10.00 7,780.00        
509-02 contractor retained reclaimed asphaltic pavement - 16      CUYD 0.01 - 0.16 0.50 - 8.00        
602-02-A cleaning and resealing existing longitudinal pavement
joints
23,421      LNFT 2.09 48,949.89 6.00 140,526.00        
602-02-B cleaning and resealing existing transverse pavement
joints
19,159      LNFT 2.09 40,042.31 7.00 134,113.00        
602-03 cleaning and sealing random cracks 542      LNFT 3.85 2,086.70 7.00 3,794.00        
701-12-G corrugated metal pipe (extension)(18") 8      LNFT 150.00 1,200.00 200.00 1,600.00        
701-15 concrete collar 1      EACH 1,500.00 1,500.00 1,400.00 1,400.00        
702-04-B adjusting catch basins 3      EACH 300.00 900.00 1,300.00 3,900.00        
707-01 concrete curb 43.0    LNFT 35.00 1,505.00 47.00 2,021.00        
713-01 temporary signs & barricades lump      LUMP 195,000.00 195,000.00 125,000.00 125,000.00        
713-03-C temporary pavement markings (8" width) 600      LNFT 0.53 318.00 1.00 600.00        
713-03-E temporary pavement markings (24" width) 586      LNFT 1.58 925.88 2.00 1,172.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.155  MILE 220.30 1,355.95 450.00 2,769.75        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
12.311  MILE 458.66 5,646.56 550.00 6,771.05        
713-05-A temporary pavement markings (solid line)(4" width) 12.311  MILE 916.23 11,279.71 1,000.00 12,311.00        
713-06-A temporary pavement legends and symbols (arrow) 44      EACH 55.00 2,420.00 65.00 2,860.00        
713-06-C temporary pavement legends and symbols (only) 8      EACH 60.50 484.00 70.00 560.00        
722-02 project site laboratory (equipped) 1      EACH 8,500.00 8,500.00 18,000.00 18,000.00        
724-01-C pavement patching (15" minimum thickness) 610      SQYD 160.00 97,600.00 145.00 88,450.00        
724-02 pavement widening 6,809.1    SQYD 72.00 490,255.20 65.00 442,591.50        
727-01 mobilization lump      LUMP 230,000.00 230,000.00 330,000.00 330,000.00        
729-16-B object marker assembly (type 2) 15      EACH 66.00 990.00 100.00 1,500.00        
731-02 reflectorized raised pavement markers 985      EACH 5.72 5,634.20 6.80 6,698.00        
732-01-C plastic pavement striping (8" width) 300      LNFT 1.06 318.00 1.20 360.00        
732-01-E plastic pavement striping (24" width) 293      LNFT 356.40 104,425.20 4.50 1,318.50        
732-02-A plastic pavement striping (solid line) (4" width) 6.155  MILE 2,580.70 15,884.21 3,000.00 18,465.00        
732-03-A plastic pavement striping (broken line)(4" width) 6.155  MILE 760.58 4,681.37 900.00 5,539.50        
732-04-A plastic pavement legends & symbols (arrow) 22      EACH 214.50 4,719.00 250.00 5,500.00        
732-04-C plastic pavement legends & symbols (only) 4      EACH 225.50 902.00 260.00 1,040.00        
732-05 removal of existing markings 0.057  MILE 5,500.00 313.50 7,800.00 444.60        
735-01 mailboxes 5      EACH 1.10 5.50 10.00 50.00        
735-02 mailbox supports (single) 5      EACH 170.50 852.50 200.00 1,000.00        
740-01 construction layout lump      LUMP 27,000.00 27,000.00 30,000.00 30,000.00        
744-01 traffic control management lump      LUMP 42,000.00 42,000.00 130,000.00 130,000.00        
S-004 concrete milling 1,207      SQYD 21.00 25,347.00 9.00 10,863.00        
S-922 sawing and sealing longitudinal joints in asphaltic
concrete overlay
39,035      LNFT 1.54 60,113.90 2.00 78,070.00        
S-923 sawing and sealing transverse joints in asphaltic
concrete overlay
19,159      LNFT 1.54 29,504.86 2.50 47,897.50        
S-927 sawcuts in asphaltic concrete lifts 58,194      LNFT 0.94 54,702.36 1.25 72,742.50        
                       
 CONTRACTOR TOTAL       2,780,336.54   3,569,441.40        