| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
100   |
SQYD |
23.00 |
2,300.00 |
35.00 |
3,500.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
103.0 |
LNFT |
21.50 |
2,214.50 |
5.00 |
515.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,820   |
CUYD |
15.00 |
27,300.00 |
24.00 |
43,680.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
50   |
EACH |
15.00 |
750.00 |
20.00 |
1,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
512   |
LNFT |
2.50 |
1,280.00 |
3.00 |
1,536.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,351   |
CUYD |
42.00 |
56,742.00 |
100.00 |
135,100.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
35.00 |
3,500.00 |
80.00 |
8,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,678.7 |
TON |
82.00 |
1,039,653.40 |
115.00 |
1,458,050.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,002.0 |
TON |
115.00 |
115,230.00 |
180.00 |
180,360.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
778   |
SQYD |
18.00 |
14,004.00 |
10.00 |
7,780.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 16   |
CUYD |
0.01 |
- 0.16 |
0.50 |
- 8.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
23,421   |
LNFT |
2.09 |
48,949.89 |
6.00 |
140,526.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
19,159   |
LNFT |
2.09 |
40,042.31 |
7.00 |
134,113.00 |
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
542   |
LNFT |
3.85 |
2,086.70 |
7.00 |
3,794.00 |
|
|
|
|
| 701-12-G |
corrugated metal pipe (extension)(18")
|
8   |
LNFT |
150.00 |
1,200.00 |
200.00 |
1,600.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,400.00 |
1,400.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
3   |
EACH |
300.00 |
900.00 |
1,300.00 |
3,900.00 |
|
|
|
|
| 707-01 |
concrete curb
|
43.0 |
LNFT |
35.00 |
1,505.00 |
47.00 |
2,021.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
195,000.00 |
195,000.00 |
125,000.00 |
125,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
600   |
LNFT |
0.53 |
318.00 |
1.00 |
600.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
586   |
LNFT |
1.58 |
925.88 |
2.00 |
1,172.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.155 |
MILE |
220.30 |
1,355.95 |
450.00 |
2,769.75 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.311 |
MILE |
458.66 |
5,646.56 |
550.00 |
6,771.05 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
12.311 |
MILE |
916.23 |
11,279.71 |
1,000.00 |
12,311.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
44   |
EACH |
55.00 |
2,420.00 |
65.00 |
2,860.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
8   |
EACH |
60.50 |
484.00 |
70.00 |
560.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
8,500.00 |
8,500.00 |
18,000.00 |
18,000.00 |
|
|
|
|
| 724-01-C |
pavement patching (15" minimum thickness)
|
610   |
SQYD |
160.00 |
97,600.00 |
145.00 |
88,450.00 |
|
|
|
|
| 724-02 |
pavement widening
|
6,809.1 |
SQYD |
72.00 |
490,255.20 |
65.00 |
442,591.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
230,000.00 |
230,000.00 |
330,000.00 |
330,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
15   |
EACH |
66.00 |
990.00 |
100.00 |
1,500.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
985   |
EACH |
5.72 |
5,634.20 |
6.80 |
6,698.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
300   |
LNFT |
1.06 |
318.00 |
1.20 |
360.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
293   |
LNFT |
356.40 |
104,425.20 |
4.50 |
1,318.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.155 |
MILE |
2,580.70 |
15,884.21 |
3,000.00 |
18,465.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.155 |
MILE |
760.58 |
4,681.37 |
900.00 |
5,539.50 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
22   |
EACH |
214.50 |
4,719.00 |
250.00 |
5,500.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
225.50 |
902.00 |
260.00 |
1,040.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.057 |
MILE |
5,500.00 |
313.50 |
7,800.00 |
444.60 |
|
|
|
|
| 735-01 |
mailboxes
|
5   |
EACH |
1.10 |
5.50 |
10.00 |
50.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
5   |
EACH |
170.50 |
852.50 |
200.00 |
1,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
27,000.00 |
27,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
42,000.00 |
42,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| S-004 |
concrete milling
|
1,207   |
SQYD |
21.00 |
25,347.00 |
9.00 |
10,863.00 |
|
|
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
39,035   |
LNFT |
1.54 |
60,113.90 |
2.00 |
78,070.00 |
|
|
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
19,159   |
LNFT |
1.54 |
29,504.86 |
2.50 |
47,897.50 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
58,194   |
LNFT |
0.94 |
54,702.36 |
1.25 |
72,742.50 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,780,336.54 |
|
3,569,441.40 |
|
|
|
|
|