| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks and drives
|
2,005   |
SQYD |
14.00 |
28,070.00 |
15.00 |
30,075.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
2,500.0 |
LNFT |
18.00 |
45,000.00 |
10.00 |
25,000.00 |
|
|
|
|
| 302-02-A |
class ii base course (6" thick)
|
470.0 |
SQYD |
30.00 |
14,100.00 |
40.00 |
18,800.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
15,838.0 |
TON |
70.00 |
1,108,660.00 |
79.00 |
1,251,202.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,500.0 |
TON |
100.00 |
150,000.00 |
79.00 |
118,500.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
135,075   |
SQYD |
4.00 |
540,300.00 |
3.00 |
405,225.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,814   |
CUYD |
1.00 |
- 2,814.00 |
5.00 |
- 14,070.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
10   |
EACH |
2,500.00 |
25,000.00 |
2,000.00 |
20,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
437   |
EACH |
100.00 |
43,700.00 |
50.00 |
21,850.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
35   |
EACH |
500.00 |
17,500.00 |
2,000.00 |
70,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
2,005.0 |
SQYD |
130.00 |
260,650.00 |
140.00 |
280,700.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
180.0 |
SQYD |
90.00 |
16,200.00 |
90.00 |
16,200.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
2,500.0 |
LNFT |
40.00 |
100,000.00 |
30.00 |
75,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
180,000.00 |
180,000.00 |
370,000.00 |
370,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
12,210   |
LNFT |
0.10 |
1,221.00 |
0.10 |
1,221.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
2,108   |
LNFT |
0.10 |
210.80 |
0.30 |
632.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.638 |
MILE |
200.00 |
2,727.60 |
10.00 |
136.38 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.158 |
MILE |
400.00 |
2,863.20 |
15.00 |
107.37 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
27.276 |
MILE |
800.00 |
21,820.80 |
20.00 |
545.52 |
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
8   |
EACH |
100.00 |
800.00 |
10.00 |
80.00 |
|
|
|
|
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
28   |
EACH |
10.00 |
280.00 |
10.00 |
280.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
6,855   |
SQYD |
62.00 |
425,010.00 |
85.00 |
582,675.00 |
|
|
|
|
| 724-02 |
pavement widening
|
550   |
SQYD |
60.00 |
33,000.00 |
85.00 |
46,750.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
300.0 |
TON |
100.00 |
30,000.00 |
100.00 |
30,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
360,000.00 |
360,000.00 |
400,000.00 |
400,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,020   |
EACH |
6.00 |
6,120.00 |
5.00 |
5,100.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
6,105   |
LNFT |
1.00 |
6,105.00 |
1.00 |
6,105.00 |
|
|
|
|
| 732-01-C-01 |
plastic pavement striping (8" width) (dashed)
|
7,000   |
LNFT |
2.00 |
14,000.00 |
1.30 |
9,100.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,054   |
LNFT |
4.00 |
4,216.00 |
4.00 |
4,216.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.638 |
MILE |
2,500.00 |
34,095.00 |
2,600.00 |
35,458.80 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.819 |
MILE |
700.00 |
4,773.30 |
700.00 |
4,773.30 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
180.00 |
540.00 |
50.00 |
150.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
4   |
EACH |
200.00 |
800.00 |
100.00 |
400.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
220.00 |
660.00 |
100.00 |
300.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
14   |
EACH |
700.00 |
9,800.00 |
600.00 |
8,400.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
35,000.00 |
35,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
15   |
EACH |
400.00 |
6,000.00 |
400.00 |
6,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
30,000.00 |
30,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-002 |
tree pruning
|
lump |
LUMP |
15,000.00 |
15,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| S-003 |
cleaning catch basins
|
40   |
EACH |
70.00 |
2,800.00 |
400.00 |
16,000.00 |
|
|
|
|
| S-004 |
cleaning existing culverts
|
4,000   |
LNFT |
5.00 |
20,000.00 |
12.00 |
48,000.00 |
|
|
|
|
| S-006 |
impact attenuator
|
3   |
EACH |
25,000.00 |
75,000.00 |
30,000.00 |
90,000.00 |
|
|
|
|
| S-007 |
cleaning and sealing random cracks in asphaltic
concrete |
40,000   |
LNFT |
1.50 |
60,000.00 |
2.00 |
80,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,796,208.70 |
|
4,134,912.77 |
|
|
|
|
|