| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. R. CORE, LLC. |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - PRAIRIE CONTRACTORS INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
4,600.00 |
4,600.00 |
10,000.00 |
10,000.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
450   |
LNFT |
3.30 |
1,485.00 |
8.00 |
3,600.00 |
300.00 |
135,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
203   |
CUYD |
20.00 |
4,060.00 |
13.00 |
2,639.00 |
75.00 |
15,225.00 |
|
|
| 507-01-C |
asphaltic surface treatment (3 applications)
|
164,875   |
SQYD |
4.90 |
807,887.50 |
5.25 |
865,593.75 |
5.50 |
906,812.50 |
|
|
| 602-03 |
cleaning and sealing random cracks
|
4,775   |
LNFT |
6.00 |
28,650.00 |
4.40 |
21,010.00 |
3.00 |
14,325.00 |
|
|
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
96   |
LNFT |
118.20 |
11,347.20 |
225.00 |
21,600.00 |
250.00 |
24,000.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
24   |
LNFT |
145.00 |
3,480.00 |
185.00 |
4,440.00 |
200.00 |
4,800.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
16   |
LNFT |
175.00 |
2,800.00 |
210.00 |
3,360.00 |
200.00 |
3,200.00 |
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
500.00 |
1,500.00 |
1,250.00 |
3,750.00 |
1,500.00 |
4,500.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
2,200.00 |
26,400.00 |
2,100.00 |
25,200.00 |
2,000.00 |
24,000.00 |
|
|
| 712-04 |
flexible revetment
|
85   |
SQYD |
50.00 |
4,250.00 |
110.00 |
9,350.00 |
100.00 |
8,500.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
45,000.00 |
45,000.00 |
100,000.00 |
100,000.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
12.448 |
MILE |
330.00 |
4,107.84 |
1.00 |
12.45 |
1.00 |
12.45 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
37.448 |
MILE |
660.00 |
24,715.68 |
1.00 |
37.45 |
1.00 |
37.45 |
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
11,041   |
EACH |
FREE |
FREE |
1.75 |
19,321.75 |
2.50 |
27,602.50 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,300   |
SQYD |
112.00 |
145,600.00 |
100.00 |
130,000.00 |
120.00 |
156,000.00 |
|
|
| 726-01 |
bedding material
|
36.5 |
CUYD |
65.00 |
2,372.50 |
100.00 |
3,650.00 |
100.00 |
3,650.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
53,000.00 |
53,000.00 |
92,000.00 |
92,000.00 |
150,000.00 |
150,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
5   |
EACH |
77.00 |
385.00 |
75.00 |
375.00 |
100.00 |
500.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,840   |
EACH |
5.00 |
9,200.00 |
5.00 |
9,200.00 |
5.00 |
9,200.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
37.396 |
MILE |
2,400.00 |
89,750.40 |
2,300.00 |
86,010.80 |
2,500.00 |
93,490.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
12.448 |
MILE |
770.00 |
9,584.96 |
900.00 |
11,203.20 |
800.00 |
9,958.40 |
|
|
| 735-01 |
mailboxes
|
114   |
EACH |
10.00 |
1,140.00 |
1.00 |
114.00 |
1.00 |
114.00 |
|
|
| 735-02 |
mailbox supports (single)
|
91   |
EACH |
150.00 |
13,650.00 |
130.00 |
11,830.00 |
115.00 |
10,465.00 |
|
|
| 735-03 |
mailbox supports (double)
|
12   |
EACH |
250.00 |
3,000.00 |
180.00 |
2,160.00 |
160.00 |
1,920.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
300.00 |
900.00 |
315.00 |
945.00 |
250.00 |
750.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
60,000.00 |
60,000.00 |
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
3.80 |
CUYD |
1,100.00 |
4,180.00 |
1,500.00 |
5,700.00 |
1,500.00 |
5,700.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
211   |
LB |
3.00 |
633.00 |
2.55 |
538.05 |
3.00 |
633.00 |
|
|
| S-001 |
pavement edging (6" thick)
|
333   |
SQYD |
155.00 |
51,615.00 |
100.00 |
33,300.00 |
200.00 |
66,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,347,294.08 |
|
1,461,940.45 |
|
1,858,995.30 |
|
|
|