Letting of 1/31/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 027-03-0034
Parish: WEBSTER
Routes: LA 159
Description: JUNCTION I-20 - JUNCTION US 80 (NORTHBOUND LANES)
Type Const: cold planing asphaltic concrete, superpave asphaltic concrete overlay, pavement
patching and related work.
Estimated Construction Cost: $299,998.59
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $321,422.01
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-F removal of concrete combination curb & gutter 30.0    LNFT 10.00 300.00            
502-01 superpave asphaltic concrete 1,972.6    TON 70.00 138,082.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
339.4    TON 45.00 15,273.00            
509-01 cold planing asphaltic pavement 21,018      SQYD 2.80 58,850.40            
702-04-A adjusting manholes 1      EACH 500.00 500.00            
706-01-C concrete walk (6" thick) 6.0    SQYD 70.00 420.00            
707-03 combination concrete curb and gutter 30.0    LNFT 50.00 1,500.00            
713-01 temporary signs & barricades lump      LUMP 30,700.00 30,700.00            
713-03-C temporary pavement markings (8" width) 620      LNFT 0.01 6.20            
713-03-E temporary pavement markings (24" width) 224      LNFT 0.01 2.24            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.548  MILE 325.00 828.10            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.190  MILE 1.00 2.19            
713-05-A temporary pavement markings (solid line)(4" width) 4.382  MILE 1.00 4.38            
713-06-A temporary pavement legends and symbols (arrow) 4      EACH 1.00 4.00            
724-01-A pavement patching (6" minimum thickness) 300      SQYD 62.00 18,600.00            
727-01 mobilization lump      LUMP 30,700.00 30,700.00            
731-02 reflectorized raised pavement markers 170      EACH 5.00 850.00            
732-01-C plastic pavement striping (8" width) 310      LNFT 1.00 310.00            
732-01-E plastic pavement striping (24" width) 112      LNFT 3.00 336.00            
732-02-A plastic pavement striping (solid line) (4" width) 2.191  MILE 2,500.00 5,477.50            
732-03-A plastic pavement striping (broken line)(4" width) 1.095  MILE 800.00 876.00            
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 150.00 300.00            
740-01 construction layout lump      LUMP 10,000.00 10,000.00            
744-01 traffic control management lump      LUMP 7,500.00 7,500.00            
                       
 CONTRACTOR TOTAL       321,422.01            