| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MACK'S TRUCKING OF INDEPENDENCE LLC |
- 2 - FORBY CONTRACTING, INC. |
- 3 - JEFF MERCER LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,809   |
SQYD |
12.00 |
21,708.00 |
10.00 |
18,090.00 |
20.00 |
36,180.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
227.2 |
SQYD |
12.00 |
2,726.40 |
10.00 |
2,272.00 |
20.00 |
4,544.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
5.00 |
50.00 |
10.00 |
100.00 |
200.00 |
2,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
1.25 |
1,250.00 |
2.00 |
2,000.00 |
5.00 |
5,000.00 |
|
|
| 702-03-C-01 |
catch basins (cb-06)(paved gutter drains)
|
1   |
EACH |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
|
|
| 702-04-A |
adjusting manholes
|
6   |
EACH |
1,500.00 |
9,000.00 |
500.00 |
3,000.00 |
2,000.00 |
12,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,224.1 |
SQYD |
52.19 |
63,885.78 |
67.00 |
82,014.70 |
50.00 |
61,205.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
853.5 |
SQYD |
58.84 |
50,219.94 |
75.00 |
64,012.50 |
70.00 |
59,745.00 |
|
|
| 706-02-D |
concrete drive (8" thick)
|
131.8 |
SQYD |
85.20 |
11,229.36 |
82.00 |
10,807.60 |
75.00 |
9,885.00 |
|
|
| 707-01 |
concrete curb
|
33.5 |
LNFT |
15.00 |
502.50 |
15.00 |
502.50 |
60.00 |
2,010.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
|
|
| 717-01 |
seeding
|
11   |
LB |
10.00 |
110.00 |
25.00 |
275.00 |
110.00 |
1,210.00 |
|
|
| 718-01 |
fertilizer
|
350   |
LB |
1.00 |
350.00 |
2.00 |
700.00 |
10.00 |
3,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
7,500.00 |
7,500.00 |
25,000.00 |
25,000.00 |
36,000.00 |
36,000.00 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
835   |
LNFT |
1.35 |
1,127.25 |
1.20 |
1,002.00 |
5.00 |
4,175.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
630   |
LNFT |
2.65 |
1,669.50 |
2.40 |
1,512.00 |
10.00 |
6,300.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,600.00 |
8,600.00 |
2,500.00 |
2,500.00 |
30,000.00 |
30,000.00 |
|
|
| S-001 |
saw cut (per 1" depth)
|
1,107   |
LNFT |
1.00 |
1,107.00 |
2.50 |
2,767.50 |
10.00 |
11,070.00 |
|
|
| S-002 |
concrete walk with monolithic curb
|
271.7 |
SQYD |
93.97 |
25,531.65 |
85.00 |
23,094.50 |
100.00 |
27,170.00 |
|
|
| S-003 |
concrete walk with raised edge (6" thick)
|
14.9 |
SQYD |
60.00 |
894.00 |
85.00 |
1,266.50 |
150.00 |
2,235.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
228,461.38 |
|
262,416.80 |
|
372,229.00 |
|
|
|