Lead Project: 016-01-0043
Parish: OUACHITA
Routes: US 165
Description: US 165 DRAINAGE IMPROVEMENTS
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete pavement, pavement patching, and related work.
Estimated Construction Cost: $534,011.52
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $654,739.67
2 44289 JEFF MERCER LLC $1,299,644.90
 12487 DIAMOND B CONSTRUCTION CO., L.L.C. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
JEFF MERCER LLC

DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 8,000.00 8,000.00 120,000.00 120,000.00 40,273.98 40,273.98    
203-07 excavation & embankment 1,712      LNFT 5.00 8,560.00 40.00 68,480.00 53.70 91,934.40    
203-08 borrow (vehicular measurement) 350      CUYD 11.00 3,850.00 30.00 10,500.00 40.27 14,094.50    
204-05-A temporary sediment check dams (hay) 36      EACH 125.00 4,500.00 125.00 4,500.00 335.17 12,066.12    
302-02-D class ii base course (12" thick) 266.5    SQYD 50.00 13,325.00 40.00 10,660.00 84.54 22,529.91    
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 50.00 5,000.00 100.00 10,000.00 78.81 7,881.00    
502-01 superpave asphaltic concrete 1,915.4    TON 115.00 220,271.00 123.00 235,594.20 117.96 225,940.58    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
18.3    TON 345.00 6,313.50 350.00 6,405.00 406.99 7,447.92    
509-01 cold planing asphaltic pavement 1,200      SQYD 12.00 14,400.00 13.50 16,200.00 11.83 14,196.00    
509-02 contractor retained reclaimed asphaltic pavement - 33      CUYD 0.01 - 0.33 0.10 - 3.30 0.10 - 3.30    
602-05-I-03 full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over)
266.5    SQYD 200.00 53,300.00 350.00 93,275.00 536.99 143,107.84    
701-01-M cross drain pipe (36" rcp) 180      LNFT 130.00 23,400.00 250.00 45,000.00 402.74 72,493.20    
701-01-O cross drain pipe (48" rcp) 176      LNFT 195.00 34,320.00 350.00 61,600.00 671.23 118,136.48    
701-02-D cross drain pipe arch (24" equiv. rcpa) 88      LNFT 90.00 7,920.00 225.00 19,800.00 335.62 29,534.56    
701-05-G side drain pipe (18" rcp) 12      LNFT 65.00 780.00 200.00 2,400.00 469.86 5,638.32    
701-05-M side drain pipe (36" rcp) 46      LNFT 130.00 5,980.00 300.00 13,800.00 402.74 18,526.04    
702-03-A catch basins (cb-01) 2      EACH 3,600.00 7,200.00 3,000.00 6,000.00 4,832.88 9,665.76    
702-03-B catch basins (cb-02) 1      EACH 5,000.00 5,000.00 6,000.00 6,000.00 8,054.80 8,054.80    
702-08-A side drain safety end (type 1) 3      EACH 1,600.00 4,800.00 2,500.00 7,500.00 3,758.90 11,276.70    
710-01 flowable fill 1      CUYD 550.00 550.00 500.00 500.00 671.23 671.23    
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 120,000.00 120,000.00 20,419.86 20,419.86    
716-01-A mulch (vegetative) 1.76   ACRE 800.00 1,408.00 1,000.00 1,760.00 1,006.85 1,772.06    
717-01 seeding 81      LB 10.00 810.00 15.00 1,215.00 12.42 1,006.02    
718-01 fertilizer 1,760      LB 0.45 792.00 1.10 1,936.00 0.51 897.60    
724-01-C pavement patching (7-1/2" minimum thickness) 223      SQYD 200.00 44,600.00 250.00 55,750.00 166.23 37,069.29    
726-01 bedding material 277.9    CUYD 85.00 23,621.50 150.00 41,685.00 167.81 46,634.40    
727-01 mobilization lump      LUMP 65,000.00 65,000.00 130,000.00 130,000.00 55,458.82 55,458.82    
731-02 reflectorized raised pavement markers 48      EACH 7.00 336.00 10.00 480.00 67.12 3,221.76    
732-02-A plastic pavement striping (solid line) (4" width) 0.720  MILE 3,600.00 2,592.00 4,500.00 3,240.00 6,712.33 4,832.88    
732-03-A plastic pavement striping (broken line)(4" width) 0.360  MILE 3,600.00 1,296.00 4,500.00 1,620.00 2,684.94 966.58    
740-01 construction layout lump      LUMP 12,750.00 12,750.00 60,000.00 60,000.00 9,128.77 9,128.77    
744-01 traffic control management lump      LUMP 15,000.00 15,000.00 120,000.00 120,000.00 13,855.65 13,855.65    
S-001 cleaning existing ditches 375      LNFT 11.00 4,125.00 20.00 7,500.00 13.42 5,032.50    
S-002 milling concrete pavement 636      SQYD 15.00 9,540.00 18.00 11,448.00 22.32 14,195.52    
S-003 catch basin grate (type "b") 6      EACH 900.00 5,400.00 800.00 4,800.00 10,068.50 60,411.00    
                       
 CONTRACTOR TOTAL       654,739.67   1,299,644.90   IRREGULAR    