Letting of 1/31/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 012-06-0047
Parish: ALLEN
Routes: US 190
Description: CALCASIEU RIVER BRIDGE - 8TH STREET
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
pavement patching and related work.
Estimated Construction Cost: $1,650,695.15
 
RankLicenseBidderConstruction Bid
1 14096 BESSETTE DEVELOPMENT CORP. $1,520,727.83
2 12312 GILCHRIST CONSTRUCTION CO. LLC $1,721,509.32
3 34356 PRAIRIE CONTRACTORS INC. $1,775,394.22
4 00183 R. E. HEIDT CONSTRUCTION CO., INC. $1,888,643.61
 12487 DIAMOND B CONSTRUCTION CO., L.L.C. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
BESSETTE DEVELOPMENT CORP.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
PRAIRIE CONTRACTORS INC.
- 4 -
R. E. HEIDT CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 802      LNFT 3.80 3,047.60 4.00 3,208.00 7.00 5,614.00 3.68 2,951.36
203-08 borrow (vehicular measurement) 210      CUYD 33.75 7,087.50 28.00 5,880.00 50.00 10,500.00 88.00 18,480.00
401-02 aggregate surface course (adjusted vehicular
measurement)
3,055      CUYD 20.60 62,933.00 76.00 232,180.00 40.00 122,200.00 67.00 204,685.00
502-01 superpave asphaltic concrete 14,016.9    TON 74.44 1,043,418.04 79.00 1,107,335.10 80.00 1,121,352.00 92.00 1,289,554.80
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
307.6    TON 86.60 26,638.16 115.00 35,374.00 110.00 33,836.00 136.00 41,833.60
509-01 cold planing asphaltic pavement 56,606      SQYD 1.00 56,606.00 0.30 16,981.80 1.75 99,060.50 0.63 35,661.78
509-02 contractor retained reclaimed asphaltic pavement - 2,345      CUYD 1.00 - 2,345.00 0.50 - 1,172.50 0.01 - 23.45 1.15 - 2,696.75
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 100.0    LNFT 33.55 3,355.00 34.00 3,400.00 35.00 3,500.00 32.55 3,255.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 190.0    LNFT 51.40 9,766.00 52.00 9,880.00 55.00 10,450.00 49.88 9,477.20
704-03 blocked out guard rail 331.3    LNFT 18.00 5,963.40 18.00 5,963.40 20.00 6,626.00 17.60 5,830.88
704-07-A guard rail bridge attachments (single thrie beam) 25.0    LNFT 38.00 950.00 38.00 950.00 50.00 1,250.00 36.75 918.75
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 59.50 2,975.00 60.00 3,000.00 55.00 2,750.00 57.75 2,887.50
704-11-A guard rail end treatment (flared) 6      EACH 2,056.00 12,336.00 2,100.00 12,600.00 2,100.00 12,600.00 1,995.00 11,970.00
713-01 temporary signs & barricades lump      LUMP 9,625.00 9,625.00 10,000.00 10,000.00 29,000.00 29,000.00 4,620.00 4,620.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.360  MILE 334.50 4,134.42 380.00 4,696.80 400.00 4,944.00 503.00 6,217.08
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
11.580  MILE 324.65 3,759.45 1.00 11.58 1.00 11.58 315.00 3,647.70
713-05-A temporary pavement markings (solid line)(4" width) 25.491  MILE 649.25 16,550.03 1.00 25.49 1.00 25.49 630.00 16,059.33
717-01 seeding 12      LB 27.10 325.20 27.00 324.00 100.00 1,200.00 26.25 315.00
718-01 fertilizer 200      LB 3.25 650.00 3.50 700.00 3.00 600.00 3.15 630.00
724-01-B pavement patching (12" minimum thickness) 150      SQYD 70.00 10,500.00 180.00 27,000.00 200.00 30,000.00 181.00 27,150.00
724-03 pavement joint repair 10.0    TON 220.00 2,200.00 300.00 3,000.00 300.00 3,000.00 264.00 2,640.00
727-01 mobilization lump      LUMP 29,970.00 29,970.00 55,000.00 55,000.00 86,000.00 86,000.00 25,000.00 25,000.00
729-16-B object marker assembly (type 2) 8      EACH 65.00 520.00 55.00 440.00 75.00 600.00 63.00 504.00
729-16-C object marker assembly (type 3) 6      EACH 77.00 462.00 77.00 462.00 85.00 510.00 71.71 430.26
731-02 reflectorized raised pavement markers 544      EACH 5.50 2,992.00 5.75 3,128.00 5.00 2,720.00 5.25 2,856.00
732-02-A plastic pavement striping (solid line) (4" width) 8.497  MILE 2,327.00 19,772.52 2,500.00 21,242.50 2,200.00 18,693.40 2,257.50 19,181.98
732-03-A plastic pavement striping (broken line)(4" width) 3.860  MILE 866.00 3,342.76 750.00 2,895.00 800.00 3,088.00 840.00 3,242.40
735-01 mailboxes 13      EACH 2.00 26.00 10.00 130.00 1.00 13.00 1.05 13.65
735-02 mailbox supports (single) 13      EACH 148.00 1,924.00 150.00 1,950.00 125.00 1,625.00 131.25 1,706.25
740-01 construction layout lump      LUMP 9,510.00 9,510.00 15,000.00 15,000.00 1,000.00 1,000.00 4,172.00 4,172.00
744-01 traffic control management lump      LUMP 27,370.00 27,370.00 40,000.00 40,000.00 12,000.00 12,000.00 12,335.00 12,335.00
S-001 rumble strips (ground-in) 2.0    MILE 3,120.00 6,240.00 3,000.00 6,000.00 3,500.00 7,000.00 2,467.50 4,935.00
S-927 sawcuts in asphaltic concrete lifts 110,499      LNFT 1.25 138,123.75 0.85 93,924.15 1.30 143,648.70 1.16 128,178.84
                       
 CONTRACTOR TOTAL       1,520,727.83   1,721,509.32   1,775,394.22   1,888,643.61
 
Item Number Item Description Quantity Unit of Measure
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 802      LNFT 4.00 3,208.00            
203-08 borrow (vehicular measurement) 210      CUYD 38.00 7,980.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
3,055      CUYD 18.00 54,990.00            
502-01 superpave asphaltic concrete 14,016.9    TON 87.50 1,226,478.75            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
307.6    TON 140.00 43,064.00            
509-01 cold planing asphaltic pavement 56,606      SQYD 1.00 56,606.00            
509-02 contractor retained reclaimed asphaltic pavement - 2,345      CUYD 1.00 - 2,345.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 100.0    LNFT 34.00 3,400.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 190.0    LNFT 50.00 9,500.00            
704-03 blocked out guard rail 331.3    LNFT 20.00 6,626.00            
704-07-A guard rail bridge attachments (single thrie beam) 25.0    LNFT 38.00 950.00            
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 60.00 3,000.00            
704-11-A guard rail end treatment (flared) 6      EACH 2,100.00 12,600.00            
713-01 temporary signs & barricades lump      LUMP 8,000.00 8,000.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.360  MILE 300.00 3,708.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
11.580  MILE 330.00 3,821.40            
713-05-A temporary pavement markings (solid line)(4" width) 25.491  MILE 700.00 17,843.70            
717-01 seeding 12      LB 28.00 336.00            
718-01 fertilizer 200      LB 4.00 800.00            
724-01-B pavement patching (12" minimum thickness) 150      SQYD 164.00 24,600.00            
724-03 pavement joint repair 10.0    TON 850.00 8,500.00            
727-01 mobilization lump      LUMP 56,500.00 56,500.00            
729-16-B object marker assembly (type 2) 8      EACH 66.00 528.00            
729-16-C object marker assembly (type 3) 6      EACH 78.00 468.00            
731-02 reflectorized raised pavement markers 544      EACH 6.00 3,264.00            
732-02-A plastic pavement striping (solid line) (4" width) 8.497  MILE 2,500.00 21,242.50            
732-03-A plastic pavement striping (broken line)(4" width) 3.860  MILE 900.00 3,474.00            
735-01 mailboxes 13      EACH 25.00 325.00            
735-02 mailbox supports (single) 13      EACH 165.00 2,145.00            
740-01 construction layout lump      LUMP 10,000.00 10,000.00            
744-01 traffic control management lump      LUMP 23,000.00 23,000.00            
S-001 rumble strips (ground-in) 2.0    MILE 4,000.00 8,000.00            
S-927 sawcuts in asphaltic concrete lifts 110,499      LNFT 1.40 154,698.60            
                       
 CONTRACTOR TOTAL       IRREGULAR            