| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BESSETTE DEVELOPMENT CORP. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - PRAIRIE CONTRACTORS INC. |
- 4 - R. E. HEIDT CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
802   |
LNFT |
3.80 |
3,047.60 |
4.00 |
3,208.00 |
7.00 |
5,614.00 |
3.68 |
2,951.36 |
| 203-08 |
borrow (vehicular measurement)
|
210   |
CUYD |
33.75 |
7,087.50 |
28.00 |
5,880.00 |
50.00 |
10,500.00 |
88.00 |
18,480.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,055   |
CUYD |
20.60 |
62,933.00 |
76.00 |
232,180.00 |
40.00 |
122,200.00 |
67.00 |
204,685.00 |
| 502-01 |
superpave asphaltic concrete
|
14,016.9 |
TON |
74.44 |
1,043,418.04 |
79.00 |
1,107,335.10 |
80.00 |
1,121,352.00 |
92.00 |
1,289,554.80 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
307.6 |
TON |
86.60 |
26,638.16 |
115.00 |
35,374.00 |
110.00 |
33,836.00 |
136.00 |
41,833.60 |
| 509-01 |
cold planing asphaltic pavement
|
56,606   |
SQYD |
1.00 |
56,606.00 |
0.30 |
16,981.80 |
1.75 |
99,060.50 |
0.63 |
35,661.78 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,345   |
CUYD |
1.00 |
- 2,345.00 |
0.50 |
- 1,172.50 |
0.01 |
- 23.45 |
1.15 |
- 2,696.75 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
33.55 |
3,355.00 |
34.00 |
3,400.00 |
35.00 |
3,500.00 |
32.55 |
3,255.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
190.0 |
LNFT |
51.40 |
9,766.00 |
52.00 |
9,880.00 |
55.00 |
10,450.00 |
49.88 |
9,477.20 |
| 704-03 |
blocked out guard rail
|
331.3 |
LNFT |
18.00 |
5,963.40 |
18.00 |
5,963.40 |
20.00 |
6,626.00 |
17.60 |
5,830.88 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
25.0 |
LNFT |
38.00 |
950.00 |
38.00 |
950.00 |
50.00 |
1,250.00 |
36.75 |
918.75 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
59.50 |
2,975.00 |
60.00 |
3,000.00 |
55.00 |
2,750.00 |
57.75 |
2,887.50 |
| 704-11-A |
guard rail end treatment (flared)
|
6   |
EACH |
2,056.00 |
12,336.00 |
2,100.00 |
12,600.00 |
2,100.00 |
12,600.00 |
1,995.00 |
11,970.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,625.00 |
9,625.00 |
10,000.00 |
10,000.00 |
29,000.00 |
29,000.00 |
4,620.00 |
4,620.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.360 |
MILE |
334.50 |
4,134.42 |
380.00 |
4,696.80 |
400.00 |
4,944.00 |
503.00 |
6,217.08 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.580 |
MILE |
324.65 |
3,759.45 |
1.00 |
11.58 |
1.00 |
11.58 |
315.00 |
3,647.70 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
25.491 |
MILE |
649.25 |
16,550.03 |
1.00 |
25.49 |
1.00 |
25.49 |
630.00 |
16,059.33 |
| 717-01 |
seeding
|
12   |
LB |
27.10 |
325.20 |
27.00 |
324.00 |
100.00 |
1,200.00 |
26.25 |
315.00 |
| 718-01 |
fertilizer
|
200   |
LB |
3.25 |
650.00 |
3.50 |
700.00 |
3.00 |
600.00 |
3.15 |
630.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
150   |
SQYD |
70.00 |
10,500.00 |
180.00 |
27,000.00 |
200.00 |
30,000.00 |
181.00 |
27,150.00 |
| 724-03 |
pavement joint repair
|
10.0 |
TON |
220.00 |
2,200.00 |
300.00 |
3,000.00 |
300.00 |
3,000.00 |
264.00 |
2,640.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
29,970.00 |
29,970.00 |
55,000.00 |
55,000.00 |
86,000.00 |
86,000.00 |
25,000.00 |
25,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
65.00 |
520.00 |
55.00 |
440.00 |
75.00 |
600.00 |
63.00 |
504.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
77.00 |
462.00 |
77.00 |
462.00 |
85.00 |
510.00 |
71.71 |
430.26 |
| 731-02 |
reflectorized raised pavement markers
|
544   |
EACH |
5.50 |
2,992.00 |
5.75 |
3,128.00 |
5.00 |
2,720.00 |
5.25 |
2,856.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
8.497 |
MILE |
2,327.00 |
19,772.52 |
2,500.00 |
21,242.50 |
2,200.00 |
18,693.40 |
2,257.50 |
19,181.98 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.860 |
MILE |
866.00 |
3,342.76 |
750.00 |
2,895.00 |
800.00 |
3,088.00 |
840.00 |
3,242.40 |
| 735-01 |
mailboxes
|
13   |
EACH |
2.00 |
26.00 |
10.00 |
130.00 |
1.00 |
13.00 |
1.05 |
13.65 |
| 735-02 |
mailbox supports (single)
|
13   |
EACH |
148.00 |
1,924.00 |
150.00 |
1,950.00 |
125.00 |
1,625.00 |
131.25 |
1,706.25 |
| 740-01 |
construction layout
|
lump |
LUMP |
9,510.00 |
9,510.00 |
15,000.00 |
15,000.00 |
1,000.00 |
1,000.00 |
4,172.00 |
4,172.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
27,370.00 |
27,370.00 |
40,000.00 |
40,000.00 |
12,000.00 |
12,000.00 |
12,335.00 |
12,335.00 |
| S-001 |
rumble strips (ground-in)
|
2.0 |
MILE |
3,120.00 |
6,240.00 |
3,000.00 |
6,000.00 |
3,500.00 |
7,000.00 |
2,467.50 |
4,935.00 |
| S-927 |
sawcuts in asphaltic concrete lifts
|
110,499   |
LNFT |
1.25 |
138,123.75 |
0.85 |
93,924.15 |
1.30 |
143,648.70 |
1.16 |
128,178.84 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,520,727.83 |
|
1,721,509.32 |
|
1,775,394.22 |
|
1,888,643.61 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
802   |
LNFT |
4.00 |
3,208.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
210   |
CUYD |
38.00 |
7,980.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,055   |
CUYD |
18.00 |
54,990.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
14,016.9 |
TON |
87.50 |
1,226,478.75 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
307.6 |
TON |
140.00 |
43,064.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
56,606   |
SQYD |
1.00 |
56,606.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,345   |
CUYD |
1.00 |
- 2,345.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
34.00 |
3,400.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
190.0 |
LNFT |
50.00 |
9,500.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
331.3 |
LNFT |
20.00 |
6,626.00 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
25.0 |
LNFT |
38.00 |
950.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
60.00 |
3,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
6   |
EACH |
2,100.00 |
12,600.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
12.360 |
MILE |
300.00 |
3,708.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.580 |
MILE |
330.00 |
3,821.40 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
25.491 |
MILE |
700.00 |
17,843.70 |
|
|
|
|
|
|
| 717-01 |
seeding
|
12   |
LB |
28.00 |
336.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
200   |
LB |
4.00 |
800.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
150   |
SQYD |
164.00 |
24,600.00 |
|
|
|
|
|
|
| 724-03 |
pavement joint repair
|
10.0 |
TON |
850.00 |
8,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
56,500.00 |
56,500.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
66.00 |
528.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
78.00 |
468.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
544   |
EACH |
6.00 |
3,264.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
8.497 |
MILE |
2,500.00 |
21,242.50 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.860 |
MILE |
900.00 |
3,474.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
13   |
EACH |
25.00 |
325.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
13   |
EACH |
165.00 |
2,145.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
23,000.00 |
23,000.00 |
|
|
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
2.0 |
MILE |
4,000.00 |
8,000.00 |
|
|
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
110,499   |
LNFT |
1.40 |
154,698.60 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
IRREGULAR |
|
|
|
|
|
|
|