Bid Tabulations
Letting of
06/23/2010
LA DOTD Headquarters
| Lead Project: 070-04-0028 | |
| Parish: Union | |
| Routes: LA 2 | |
| Description: JCT US 167 - 0.3 MILES WEST OF LA 550 | |
| Type Const: CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $912,048.15 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $748,660.06 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $819,200.09 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Diamond B Construction Co., L.L.C. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing TREE TRIMMING ONLY | 1 | LUMP | 6,000.00 | 6,000.00 | 4,019.47 | 4,019.47 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,500.00 | 3,500.00 | 4,036.19 | 4,036.19 |
| 0003 | 202-03-00010 | Relocation OF PARKING BUMPERS | 24 | EACH | 100.00 | 2,400.00 | 120.05 | 2,881.20 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 800 | CUYD | 16.00 | 12,800.00 | 25.36 | 20,288.00 |
| 0005 | 302-02-05100 | Class II Base Course (10" Thick) (Stone) | 5,518.7 | SQYD | 30.00 | 165,561.00 | 31.40 | 173,287.18 |
| 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 77 | CUYD | 60.00 | 4,620.00 | 41.93 | 3,228.61 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 72 | CUYD | 60.00 | 4,320.00 | 20.92 | 1,506.24 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 2,884.8 | TON | 88.00 | 253,862.40 | 87.02 | 251,035.30 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 200.5 | TON | 120.00 | 24,060.00 | 197.71 | 39,640.86 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 20,999 | SQYD | 1.80 | 37,798.20 | 2.43 | 51,027.57 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -875 | CUYD | 0.10 | -87.50 | 0.10 | -87.50 |
| 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 300 | SQYD | 110.00 | 33,000.00 | 82.72 | 24,816.00 |
| 0013 | 510-03-00100 | Pavement Joint Repair | 175 | TON | 215.00 | 37,625.00 | 207.59 | 36,328.25 |
| 0014 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 16 | LNFT | 110.00 | 1,760.00 | 126.85 | 2,029.60 |
| 0015 | 701-15-00100 | Concrete Collar | 2 | EACH | 500.00 | 1,000.00 | 576.60 | 1,153.20 |
| 0016 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,050.00 | 1,050.00 | 1,153.20 | 1,153.20 |
| 0017 | 702-04-00200 | Adjusting Catch Basins | 2 | EACH | 2,500.00 | 5,000.00 | 2,537.04 | 5,074.08 |
| 0018 | 706-04-00100 | Handicapped Curb Ramps | 5 | EACH | 2,500.00 | 12,500.00 | 2,882.99 | 14,414.95 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 18,872.01 | 18,872.01 |
| 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.574 | MILE | 225.00 | 804.15 | 173.91 | 621.55 |
| 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.13 | MILE | 300.00 | 639.00 | 345.96 | 736.89 |
| 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.613 | MILE | 1.00 | 11.61 | 691.92 | 8,035.27 |
| 0023 | 716-01-00100 | Mulch (Vegetative) | 4 | TON | 500.00 | 2,000.00 | 922.56 | 3,690.24 |
| 0024 | 717-01-00100 | Seeding | 120 | LB | 8.00 | 960.00 | 11.53 | 1,383.60 |
| 0025 | 718-01-00100 | Fertilizer | 2,000 | LB | 0.40 | 800.00 | 0.58 | 1,160.00 |
| 0026 | 719-04-00100 | Landscaping | 1 | LUMP | 5,500.00 | 5,500.00 | 6,948.01 | 6,948.01 |
| 0027 | 726-01-00100 | Bedding Material | 20.5 | CUYD | 100.00 | 2,050.00 | 115.32 | 2,364.06 |
| 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 28,000.00 | 28,000.00 | 24,701.74 | 24,701.74 |
| 0029 | 729-16-00200 | Object Marker Assembly (Type 2) | 12 | EACH | 100.00 | 1,200.00 | 86.49 | 1,037.88 |
| 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 159 | EACH | 9.00 | 1,431.00 | 5.77 | 917.43 |
| 0031 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 3.871 | MILE | 3,200.00 | 12,387.20 | 2,652.35 | 10,267.25 |
| 0032 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 0.71 | MILE | 2,200.00 | 1,562.00 | 807.24 | 573.14 |
| 0033 | 732-04-08040 | Plastic Pavement Legends and Symbols (Handicap Parking) | 2 | EACH | 800.00 | 1,600.00 | 345.96 | 691.92 |
| 0034 | 735-01-00100 | Mailboxes | 3 | EACH | 5.00 | 15.00 | 3.46 | 10.38 |
| 0035 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 500.00 | 1,500.00 | 576.60 | 1,729.80 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,500.00 | 5,500.00 | 4,843.43 | 4,843.43 |
| 0037 | 741-11-00100 | Adjusting Water Valve | 2 | EACH | 700.00 | 1,400.00 | 749.58 | 1,499.16 |
| 0038 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 26.39 | CUYD | 1,150.00 | 30,348.50 | 1,960.43 | 51,735.75 |
| 0039 | 805-02-00100 | Class A(M) Concrete | 10 | CUYD | 325.00 | 3,250.00 | 345.96 | 3,459.60 |
| 0040 | 805-12-30020 | Reinforced Concrete Box Culverts (3' x 2') (Extension) | 19 | LNFT | 450.00 | 8,550.00 | 461.28 | 8,764.32 |
| 0041 | 805-12-30040 | Reinforced Concrete Box Culverts (4' x 2') (Extension) | 20 | LNFT | 450.00 | 9,000.00 | 461.28 | 9,225.60 |
| 0042 | 805-12-32000 | Reinforced Concrete Box Culverts (3' x 3') (Extension) | 14 | LNFT | 450.00 | 6,300.00 | 461.28 | 6,457.92 |
| 0043 | 806-01-00100 | Deformed Reinforcing Steel | 2,069 | LB | 2.50 | 5,172.50 | 2.88 | 5,958.72 |
| 0044 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement FOR HANDICAPED RAMP | 1,000 | INLF | 2.00 | 2,000.00 | 2.70 | 2,700.00 |
| 0045 | NS-800-00260 | Hand Railing FOR HANDICAPED RAMP | 98 | LNFT | 45.00 | 4,410.00 | 46.13 | 4,520.74 |
| 0046 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 1 | EACH | 500.00 | 500.00 | 461.28 | 461.28 |
| CONTRACTOR TOTAL | 748,660.06 | 819,200.09 | ||||||