LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 068-04-0032
Parish: Caldwell
Routes: LA 4
Description: JACKSON LINE - 0.328 Mi WEST OF BUCKSKIN ROAD
Type Const: ASPHALTIC SURFACE TREATMENT, MICRO-SURFACING, AND RELATED WORK
Estimated Construction Cost: $1,376,355.15


RankLicenseBidderConstruction Bid
1 32934 Vance Brothers Inc. $1,313,533.53
2 14422 T. L. Wallace Construction, Inc. $1,399,358.76
3 30339 Missouri Petroleum Products Co. LLC $1,667,863.37


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Vance Brothers Inc.
- 2 -
T. L. Wallace Construction, Inc.
- 3 -
Missouri Petroleum Products Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 502-01-00100 Superpave Asphaltic Concrete 1,015.2    TON 168.00 170,553.60 185.00 187,812.00 160.00 162,432.00
0002 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 37,331      GAL 3.00 111,993.00 3.20 119,459.20 3.18 118,712.58
0003 507-02-00200 Aggregate (S2) 91,051      SQYD 1.17 106,529.67 0.90 81,945.90 0.95 86,498.45
0004 509-01-00100 Cold Planing Asphaltic Pavement 9,185      SQYD 10.50 96,442.50 4.35 39,954.75 10.00 91,850.00
0005 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -378      CUYD 0.10 -37.80 1.00 -378.00 0.10 -37.80
0006 713-01-00100 Temporary Signs and Barricades 1      LUMP 13,365.00 13,365.00 28,000.00 28,000.00 17,916.00 17,916.00
0007 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 20.48   MILE 150.00 3,072.00 200.00 4,096.00 250.00 5,120.00
0008 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 4.072  MILE 210.00 855.12 200.00 814.40 200.00 814.40
0009 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 76.864  MILE 367.50 28,247.52 350.00 26,902.40 350.00 26,902.40
0010 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 2,050      EACH 1.75 3,587.50 1.00 2,050.00 1.35 2,767.50
0011 727-01-00100 Mobilization 1      LUMP 22,500.00 22,500.00 35,000.00 35,000.00 248,531.00 248,531.00
0012 731-02-00100 Reflectorized Raised Pavement Markers 2,379      EACH 5.51 13,108.29 5.25 12,489.75 5.25 12,489.75
0013 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 38.432  MILE 2,520.00 96,848.64 2,400.00 92,236.80 2,400.00 92,236.80
0014 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.036  MILE 840.00 1,710.24 800.00 1,628.80 800.00 1,628.80
0015 732-05-00100 Removal of Existing Markings 10.24   MILE 1,890.00 19,353.60 1,800.00 18,432.00 1,800.00 18,432.00
0016 737-01-00100 Painted Traffic Striping (Solid Line) (4" Width) 14.748  MILE 630.00 9,291.24 600.00 8,848.80 600.00 8,848.80
0017 737-02-00100 Painted Traffic Striping (Broken Line) (4" Width) 0.772  MILE 525.00 405.30 500.00 386.00 500.00 386.00
0018 740-01-00100 Construction Layout 1      LUMP 15,000.00 15,000.00 35,000.00 35,000.00 97,535.00 97,535.00
0019 NS-500-00380 Micro-surfacing Aggregate 2,950.6    TON 112.32 331,411.39 128.00 377,676.80 127.00 374,726.20
0020 NS-500-00400 Micro-surfacing Asphalt 96,177.4    GAL 2.80 269,296.72 3.40 327,003.16 3.12 300,073.49
                     
    CONTRACTOR TOTAL       1,313,533.53   1,399,358.76   1,667,863.37
 Free Tourist Map  
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70802. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.