LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 068-02-0014
Parish: Jackson
Routes: LA 146
Description: LA 146 Bridges Near Chatham
Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERTS, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost: $4,687,153.43


RankLicenseBidderConstruction Bid
1 08815 W. E. Mcdonald & Son, LLC. $4,348,117.00
2 39670 Eutaw Construction Co. Inc. $4,582,123.94
3 34567 James Construction Group LLC $4,849,800.11
4 35849 T.L. Construction LLC $5,099,545.51
5 12312 Gilchrist Construction Co. LLC $5,167,380.18
6 01012 Cecil D. Gassiott, LLC $5,343,821.30
7 39462 Jb James Construction Llc $5,427,982.60
8 44289 Jeff Mercer LLC $5,717,464.11
9 07740 Cajun Constructors, Inc. $5,720,000.00


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
W. E. Mcdonald & Son, LLC.
- 2 -
Eutaw Construction Co. Inc.
- 3 -
James Construction Group LLC
- 4 -
T.L. Construction LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 137,000.00 137,000.00 50,000.00 50,000.00 140,000.00 140,000.00 125,000.00 125,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 25,000.00 25,000.00 3,000.00 3,000.00 18,000.00 18,000.00 12,000.00 12,000.00
0003 202-02-04000 Removal of Bridge Sta. 209+85, 40'x24', timber trestle bridge 1      EACH 6,000.00 6,000.00 6,000.00 6,000.00 20,000.00 20,000.00 7,400.00 7,400.00
0004 202-02-04000 Removal of Bridge Sta. 309+20, 60'x24', timber trestle bridge 1      EACH 6,000.00 6,000.00 8,800.00 8,800.00 20,000.00 20,000.00 7,400.00 7,400.00
0005 202-02-04000 Removal of Bridge Sta. 109+40, 78'x24', timber trestle bridge 1      EACH 6,000.00 6,000.00 12,500.00 12,500.00 20,000.00 20,000.00 7,400.00 7,400.00
0006 202-02-04000 Removal of Bridge Sta. 422+90, 60'x24', timber trestle bridge 1      EACH 6,000.00 6,000.00 8,800.00 8,800.00 20,000.00 20,000.00 7,400.00 7,400.00
0007 202-02-04000 Removal of Bridge Sta. 410+23, 59'x24', timber trestle bridge 1      EACH 6,000.00 6,000.00 8,800.00 8,800.00 40,000.00 40,000.00 7,400.00 7,400.00
0008 202-02-04000 Removal of Bridge Sta. 512+89, 59'x24', timber trestle bridge 1      EACH 6,000.00 6,000.00 8,800.00 8,800.00 40,000.00 40,000.00 7,400.00 7,400.00
0009 202-02-14500 Removal of Guard Rail 1,148      LNFT 3.00 3,444.00 15.87 18,218.76 4.50 5,166.00 2.25 2,583.00
0010 202-02-38500 Removal of Surfacing and Stablized Base 7,977.1    SQYD 3.50 27,919.85 5.00 39,885.50 8.00 63,816.80 7.00 55,839.70
0011 203-02-00100 Drainage Excavation 1,001      CUYD 10.00 10,010.00 10.00 10,010.00 12.00 12,012.00 15.00 15,015.00
0012 203-05-00100 Excavation and Embankment 1      LUMP 260,000.00 260,000.00 155,000.00 155,000.00 300,000.00 300,000.00 130,000.00 130,000.00
0013 204-02-00100 Temporary Hay or Straw Bales 140      EACH 3.00 420.00 10.00 1,400.00 16.00 2,240.00 32.00 4,480.00
0014 204-05-00200 Temporary Sediment Check Dams (Stone) 28      EACH 200.00 5,600.00 525.00 14,700.00 240.00 6,720.00 250.00 7,000.00
0015 204-06-00100 Temporary Silt Fencing 11,285      LNFT 2.00 22,570.00 2.50 28,212.50 2.70 30,469.50 1.26 14,219.10
0016 302-02-03121 Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 13,407.1    SQYD 25.00 335,177.50 22.00 294,956.20 16.00 214,513.60 24.00 321,770.40
0017 304-05-00100 Lime Treatment (Type E) Quantity shown represents 50% of the proposed roadway area 97.78   TON 500.00 48,890.00 600.00 58,668.00 242.00 23,662.76 450.00 44,001.00
0018 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) Stone of recycled P.C.C.P. 1,000      CUYD 1.00 1,000.00 80.00 80,000.00 50.00 50,000.00 10.00 10,000.00
0019 502-01-00100 Superpave Asphaltic Concrete 2,613.7    TON 136.00 355,463.20 136.00 355,463.20 122.00 318,871.40 154.00 402,509.80
0021 704-03-00100 Blocked Out Guard Rail 1,950      LNFT 17.90 34,905.00 17.90 34,905.00 19.00 37,050.00 20.00 39,000.00
0022 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 300      LNFT 53.00 15,900.00 53.00 15,900.00 56.00 16,800.00 73.00 21,900.00
0023 704-11-00100 Guard Rail End Treatment (Flared) 8      EACH 2,000.00 16,000.00 2,000.00 16,000.00 2,100.00 16,800.00 2,400.00 19,200.00
0024 704-11-00200 Guard Rail End Treatment (Tangent) 4      EACH 2,300.00 9,200.00 2,300.00 9,200.00 2,400.00 9,600.00 2,400.00 9,600.00
0025 708-01-00100 Right-of-Way Monument 57      EACH 200.00 11,400.00 200.00 11,400.00 200.00 11,400.00 150.00 8,550.00
0026 708-02-00100 Right-of-Way Monument Witness Post 57      EACH 200.00 11,400.00 200.00 11,400.00 200.00 11,400.00 150.00 8,550.00
0027 712-04-00100 Flexible Revetment 668.39   SQYD 60.00 40,103.40 60.00 40,103.40 50.00 33,419.50 70.00 46,787.30
0028 713-01-00100 Temporary Signs and Barricades 1      LUMP 60,000.00 60,000.00 40,000.00 40,000.00 60,000.00 60,000.00 50,000.00 50,000.00
0029 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 4.409  MILE 600.00 2,645.40 600.00 2,645.40 600.00 2,645.40 400.00 1,763.60
0030 716-01-00100 Mulch (Vegetative) 28.2    TON 500.00 14,100.00 500.00 14,100.00 600.00 16,920.00 743.00 20,952.60
0031 717-01-00100 Seeding 968      LB 7.00 6,776.00 7.00 6,776.00 8.00 7,744.00 10.00 9,680.00
0032 718-01-00100 Fertilizer 13,150      LB 0.45 5,917.50 0.45 5,917.50 0.90 11,835.00 1.05 13,807.50
0033 722-01-00100 Project Site Laboratory 1      EACH 10,000.00 10,000.00 20,000.00 20,000.00 14,000.00 14,000.00 25,000.00 25,000.00
0034 725-01-00100 Temporary Detour Roads 19,362.7    SQYD 58.00 1,123,036.60 50.00 968,135.00 61.00 1,181,124.70 60.00 1,161,762.00
0035 725-02-00100 Temporary Detour Bridging 320      LNFT 850.00 272,000.00 2,000.00 640,000.00 1,100.00 352,000.00 1,650.00 528,000.00
0036 726-01-00100 Bedding Material 923      CUYD 100.00 92,300.00 100.00 92,300.00 83.00 76,609.00 70.00 64,610.00
0037 727-01-00100 Mobilization 1      LUMP 125,000.00 125,000.00 300,000.00 300,000.00 480,000.00 480,000.00 350,000.00 350,000.00
0038 729-16-00200 Object Marker Assembly (Type 2) 6      EACH 70.00 420.00 70.00 420.00 70.00 420.00 85.00 510.00
0039 729-16-00300 Object Marker Assembly (Type 3) 12      EACH 72.00 864.00 72.00 864.00 72.00 864.00 85.00 1,020.00
0040 731-02-00100 Reflectorized Raised Pavement Markers 84      EACH 10.00 840.00 10.00 840.00 10.00 840.00 11.00 924.00
0041 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.593  MILE 2,600.00 6,741.80 2,975.35 7,715.08 2,600.00 6,741.80 3.00 7.78
0042 732-05-00100 Removal of Existing Markings 0.5    MILE 4,000.00 2,000.00 4,000.00 2,000.00 4,000.00 2,000.00 4,500.00 2,250.00
0043 740-01-00100 Construction Layout 1      LUMP 20,000.00 20,000.00 65,000.00 65,000.00 70,000.00 70,000.00 25,000.00 25,000.00
0044 804-01-00300 Precast Concrete Piles (16") 3,260      LNFT 60.00 195,600.00 45.00 146,700.00 65.00 211,900.00 98.00 319,480.00
0045 804-12-00100 Loading Permanent Piles 3      EACH 1.00 3.00 10,000.00 30,000.00 5,000.00 15,000.00 1.15 3.45
0046 805-01-00300 Class A Concrete (Box Culvert Headwalls) 63.95   CUYD 1,400.00 89,530.00 950.00 60,752.50 1,050.00 67,147.50 1,100.00 70,345.00
0047 805-01-00700 Class A Concrete (Bents) 92.06   CUYD 800.00 73,648.00 875.00 80,552.50 740.00 68,124.40 900.00 82,854.00
0048 805-03-00100 Class AA Concrete 353.47   CUYD 700.00 247,429.00 590.00 208,547.30 425.00 150,224.75 852.00 301,156.44
0049 805-12-02040 Reinforced Concrete Box Culverts (7' x 5') 564      LNFT 375.00 211,500.00 375.00 211,500.00 400.00 225,600.00 500.00 282,000.00
0050 805-12-03080 Reinforced Concrete Box Culverts (10' x 6') 172      LNFT 650.00 111,800.00 650.00 111,800.00 510.00 87,720.00 850.00 146,200.00
0051 806-01-00100 Deformed Reinforcing Steel 84,631      LB 1.25 105,788.75 1.00 84,631.00 0.90 76,167.90 1.06 89,708.86
0052 810-01-00100 Concrete Railing (Standard Barrier) 520      LNFT 70.00 36,400.00 70.00 36,400.00 73.00 37,960.00 80.00 41,600.00
0053 813-01-00100 Concrete Approach Slabs 413.34   SQYD 200.00 82,668.00 240.00 99,201.60 215.00 88,868.10 247.00 102,094.98
0054 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 402      INLF 3.00 1,206.00 1.75 703.50 1.00 402.00 5.00 2,010.00
0055 NS-700-00180 Impact Attenuator (Construction Zone) 5      EACH 7,500.00 37,500.00 7,500.00 37,500.00 10,000.00 50,000.00 12,000.00 60,000.00
0056 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 2      EACH 2,500.00 5,000.00 2,500.00 5,000.00 2,500.00 5,000.00 2,200.00 4,400.00
                         
    CONTRACTOR TOTAL       4,348,117.00   4,582,123.94   4,849,800.11   5,099,545.51



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Gilchrist Construction Co. LLC
- 6 -
Cecil D. Gassiott, LLC
- 7 -
Jb James Construction Llc
- 8 -
Jeff Mercer LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 115,000.00 115,000.00 130,000.00 130,000.00 450,000.00 450,000.00 185,000.00 185,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 3,500.00 3,500.00 30,000.00 30,000.00 10,000.00 10,000.00 5,000.00 5,000.00
0003 202-02-04000 Removal of Bridge Sta. 209+85, 40'x24', timber trestle bridge 1      EACH 5,000.00 5,000.00 7,500.00 7,500.00 10,000.00 10,000.00 5,000.00 5,000.00
0004 202-02-04000 Removal of Bridge Sta. 309+20, 60'x24', timber trestle bridge 1      EACH 5,000.00 5,000.00 9,500.00 9,500.00 10,000.00 10,000.00 5,500.00 5,500.00
0005 202-02-04000 Removal of Bridge Sta. 109+40, 78'x24', timber trestle bridge 1      EACH 5,000.00 5,000.00 12,500.00 12,500.00 10,000.00 10,000.00 6,500.00 6,500.00
0006 202-02-04000 Removal of Bridge Sta. 422+90, 60'x24', timber trestle bridge 1      EACH 5,000.00 5,000.00 9,500.00 9,500.00 10,000.00 10,000.00 5,500.00 5,500.00
0007 202-02-04000 Removal of Bridge Sta. 410+23, 59'x24', timber trestle bridge 1      EACH 5,000.00 5,000.00 9,500.00 9,500.00 12,000.00 12,000.00 6,500.00 6,500.00
0008 202-02-04000 Removal of Bridge Sta. 512+89, 59'x24', timber trestle bridge 1      EACH 5,000.00 5,000.00 9,500.00 9,500.00 10,000.00 10,000.00 6,500.00 6,500.00
0009 202-02-14500 Removal of Guard Rail 1,148      LNFT 6.00 6,888.00 5.50 6,314.00 4.50 5,166.00 2.50 2,870.00
0010 202-02-38500 Removal of Surfacing and Stablized Base 7,977.1    SQYD 7.50 59,828.25 12.50 99,713.75 6.00 47,862.60 4.50 35,896.95
0011 203-02-00100 Drainage Excavation 1,001      CUYD 20.00 20,020.00 16.00 16,016.00 15.00 15,015.00 18.00 18,018.00
0012 203-05-00100 Excavation and Embankment 1      LUMP 240,000.00 240,000.00 100,000.00 100,000.00 395,000.00 395,000.00 185,000.00 185,000.00
0013 204-02-00100 Temporary Hay or Straw Bales 140      EACH 16.00 2,240.00 10.00 1,400.00 17.00 2,380.00 8.00 1,120.00
0014 204-05-00200 Temporary Sediment Check Dams (Stone) 28      EACH 350.00 9,800.00 850.00 23,800.00 750.00 21,000.00 250.00 7,000.00
0015 204-06-00100 Temporary Silt Fencing 11,285      LNFT 1.20 13,542.00 2.50 28,212.50 2.50 28,212.50 2.00 22,570.00
0016 302-02-03121 Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 13,407.1    SQYD 23.00 308,363.30 22.00 294,956.20 20.00 268,142.00 32.00 429,027.20
0017 304-05-00100 Lime Treatment (Type E) Quantity shown represents 50% of the proposed roadway area 97.78   TON 395.00 38,623.10 150.00 14,667.00 100.00 9,778.00 100.00 9,778.00
0018 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) Stone of recycled P.C.C.P. 1,000      CUYD 15.00 15,000.00 65.00 65,000.00 58.00 58,000.00 25.00 25,000.00
0019 502-01-00100 Superpave Asphaltic Concrete 2,613.7    TON 120.00 313,644.00 150.00 392,055.00 138.00 360,690.60 138.00 360,690.60
0021 704-03-00100 Blocked Out Guard Rail 1,950      LNFT 20.00 39,000.00 20.00 39,000.00 18.00 35,100.00 18.50 36,075.00
0022 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 300      LNFT 58.00 17,400.00 55.00 16,500.00 65.00 19,500.00 57.00 17,100.00
0023 704-11-00100 Guard Rail End Treatment (Flared) 8      EACH 2,200.00 17,600.00 2,200.00 17,600.00 2,200.00 17,600.00 2,050.00 16,400.00
0024 704-11-00200 Guard Rail End Treatment (Tangent) 4      EACH 2,500.00 10,000.00 2,400.00 9,600.00 2,200.00 8,800.00 2,350.00 9,400.00
0025 708-01-00100 Right-of-Way Monument 57      EACH 200.00 11,400.00 500.00 28,500.00 125.00 7,125.00 220.00 12,540.00
0026 708-02-00100 Right-of-Way Monument Witness Post 57      EACH 200.00 11,400.00 500.00 28,500.00 125.00 7,125.00 220.00 12,540.00
0027 712-04-00100 Flexible Revetment 668.39   SQYD 65.00 43,445.35 70.00 46,787.30 50.00 33,419.50 78.00 52,134.42
0028 713-01-00100 Temporary Signs and Barricades 1      LUMP 55,000.00 55,000.00 45,000.00 45,000.00 60,000.00 60,000.00 40,000.00 40,000.00
0029 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 4.409  MILE 400.00 1,763.60 400.00 1,763.60 500.00 2,204.50 410.00 1,807.69
0030 716-01-00100 Mulch (Vegetative) 28.2    TON 550.00 15,510.00 530.00 14,946.00 650.00 18,330.00 900.00 25,380.00
0031 717-01-00100 Seeding 968      LB 8.00 7,744.00 7.25 7,018.00 10.00 9,680.00 5.00 4,840.00
0032 718-01-00100 Fertilizer 13,150      LB 0.50 6,575.00 0.50 6,575.00 0.90 11,835.00 0.50 6,575.00
0033 722-01-00100 Project Site Laboratory 1      EACH 5,000.00 5,000.00 40,000.00 40,000.00 25,000.00 25,000.00 5,000.00 5,000.00
0034 725-01-00100 Temporary Detour Roads 19,362.7    SQYD 63.00 1,219,850.10 60.00 1,161,762.00 53.00 1,026,223.10 60.00 1,161,762.00
0035 725-02-00100 Temporary Detour Bridging 320      LNFT 1,900.00 608,000.00 2,200.00 704,000.00 1,250.00 400,000.00 2,230.00 713,600.00
0036 726-01-00100 Bedding Material 923      CUYD 95.00 87,685.00 100.00 92,300.00 70.00 64,610.00 135.00 124,605.00
0037 727-01-00100 Mobilization 1      LUMP 445,000.00 445,000.00 350,000.00 350,000.00 540,000.00 540,000.00 535,000.00 535,000.00
0038 729-16-00200 Object Marker Assembly (Type 2) 6      EACH 80.00 480.00 70.00 420.00 80.00 480.00 85.00 510.00
0039 729-16-00300 Object Marker Assembly (Type 3) 12      EACH 80.00 960.00 75.00 900.00 80.00 960.00 120.00 1,440.00
0040 731-02-00100 Reflectorized Raised Pavement Markers 84      EACH 9.00 756.00 8.00 672.00 8.00 672.00 9.50 798.00
0041 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.593  MILE 3,200.00 8,297.60 3,000.00 7,779.00 2,800.00 7,260.40 2,900.00 7,519.70
0042 732-05-00100 Removal of Existing Markings 0.5    MILE 5,700.00 2,850.00 5,500.00 2,750.00 5,000.00 2,500.00 5,500.00 2,750.00
0043 740-01-00100 Construction Layout 1      LUMP 19,000.00 19,000.00 50,000.00 50,000.00 55,000.00 55,000.00 55,000.00 55,000.00
0044 804-01-00300 Precast Concrete Piles (16") 3,260      LNFT 72.00 234,720.00 81.00 264,060.00 70.00 228,200.00 81.00 264,060.00
0045 804-12-00100 Loading Permanent Piles 3      EACH 2,000.00 6,000.00 2,000.00 6,000.00 1,000.00 3,000.00 12,500.00 37,500.00
0046 805-01-00300 Class A Concrete (Box Culvert Headwalls) 63.95   CUYD 1,600.00 102,320.00 1,500.00 95,925.00 1,250.00 79,937.50 1,000.00 63,950.00
0047 805-01-00700 Class A Concrete (Bents) 92.06   CUYD 1,250.00 115,075.00 1,500.00 138,090.00 1,400.00 128,884.00 1,520.00 139,931.20
0048 805-03-00100 Class AA Concrete 353.47   CUYD 750.00 265,102.50 875.00 309,286.25 650.00 229,755.50 875.00 309,286.25
0049 805-12-02040 Reinforced Concrete Box Culverts (7' x 5') 564      LNFT 425.00 239,700.00 400.00 225,600.00 425.00 239,700.00 550.00 310,200.00
0050 805-12-03080 Reinforced Concrete Box Culverts (10' x 6') 172      LNFT 745.00 128,140.00 700.00 120,400.00 850.00 146,200.00 750.00 129,000.00
0051 806-01-00100 Deformed Reinforcing Steel 84,631      LB 0.78 66,012.18 0.90 76,167.90 1.00 84,631.00 1.00 84,631.00
0052 810-01-00100 Concrete Railing (Standard Barrier) 520      LNFT 70.00 36,400.00 62.00 32,240.00 65.00 33,800.00 83.00 43,160.00
0053 813-01-00100 Concrete Approach Slabs 413.34   SQYD 280.00 115,735.20 220.00 90,934.80 210.00 86,801.40 215.00 88,868.10
0054 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 402      INLF 5.00 2,010.00 5.00 2,010.00 1.00 402.00 15.00 6,030.00
0055 NS-700-00180 Impact Attenuator (Construction Zone) 5      EACH 8,000.00 40,000.00 9,000.00 45,000.00 15,000.00 75,000.00 14,000.00 70,000.00
0056 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 2      EACH 2,500.00 5,000.00 2,800.00 5,600.00 2,500.00 5,000.00 2,800.00 5,600.00
                         
    CONTRACTOR TOTAL       5,167,380.18   5,343,821.30   5,427,982.60   5,717,464.11



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 9 -
Cajun Constructors, Inc.
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 350,000.00 350,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 6,000.00 6,000.00
0003 202-02-04000 Removal of Bridge Sta. 209+85, 40'x24', timber trestle bridge 1      EACH 4,000.00 4,000.00
0004 202-02-04000 Removal of Bridge Sta. 309+20, 60'x24', timber trestle bridge 1      EACH 4,000.00 4,000.00
0005 202-02-04000 Removal of Bridge Sta. 109+40, 78'x24', timber trestle bridge 1      EACH 4,000.00 4,000.00
0006 202-02-04000 Removal of Bridge Sta. 422+90, 60'x24', timber trestle bridge 1      EACH 4,000.00 4,000.00
0007 202-02-04000 Removal of Bridge Sta. 410+23, 59'x24', timber trestle bridge 1      EACH 4,000.00 4,000.00
0008 202-02-04000 Removal of Bridge Sta. 512+89, 59'x24', timber trestle bridge 1      EACH 4,000.00 4,000.00
0009 202-02-14500 Removal of Guard Rail 1,148      LNFT 3.50 4,018.00
0010 202-02-38500 Removal of Surfacing and Stablized Base 7,977.1    SQYD 4.50 35,896.95
0011 203-02-00100 Drainage Excavation 1,001      CUYD 15.00 15,015.00
0012 203-05-00100 Excavation and Embankment 1      LUMP 135,000.00 135,000.00
0013 204-02-00100 Temporary Hay or Straw Bales 140      EACH 17.00 2,380.00
0014 204-05-00200 Temporary Sediment Check Dams (Stone) 28      EACH 200.00 5,600.00
0015 204-06-00100 Temporary Silt Fencing 11,285      LNFT 2.00 22,570.00
0016 302-02-03121 Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 13,407.1    SQYD 26.00 348,584.60
0017 304-05-00100 Lime Treatment (Type E) Quantity shown represents 50% of the proposed roadway area 97.78   TON 450.00 44,001.00
0018 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) Stone of recycled P.C.C.P. 1,000      CUYD 80.00 80,000.00
0019 502-01-00100 Superpave Asphaltic Concrete 2,613.7    TON 140.00 365,918.00
0021 704-03-00100 Blocked Out Guard Rail 1,950      LNFT 22.00 42,900.00
0022 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 300      LNFT 65.00 19,500.00
0023 704-11-00100 Guard Rail End Treatment (Flared) 8      EACH 2,600.00 20,800.00
0024 704-11-00200 Guard Rail End Treatment (Tangent) 4      EACH 2,700.00 10,800.00
0025 708-01-00100 Right-of-Way Monument 57      EACH 250.00 14,250.00
0026 708-02-00100 Right-of-Way Monument Witness Post 57      EACH 350.00 19,950.00
0027 712-04-00100 Flexible Revetment 668.39   SQYD 40.00 26,735.60
0028 713-01-00100 Temporary Signs and Barricades 1      LUMP 45,000.00 45,000.00
0029 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 4.409  MILE 750.00 3,306.75
0030 716-01-00100 Mulch (Vegetative) 28.2    TON 700.00 19,740.00
0031 717-01-00100 Seeding 968      LB 10.00 9,680.00
0032 718-01-00100 Fertilizer 13,150      LB 1.00 13,150.00
0033 722-01-00100 Project Site Laboratory 1      EACH 15,000.00 15,000.00
0034 725-01-00100 Temporary Detour Roads 19,362.7    SQYD 61.00 1,181,124.70
0035 725-02-00100 Temporary Detour Bridging 320      LNFT 2,700.00 864,000.00
0036 726-01-00100 Bedding Material 923      CUYD 200.00 184,600.00
0037 727-01-00100 Mobilization 1      LUMP 273,915.50 273,915.50
0038 729-16-00200 Object Marker Assembly (Type 2) 6      EACH 95.00 570.00
0039 729-16-00300 Object Marker Assembly (Type 3) 12      EACH 95.00 1,140.00
0040 731-02-00100 Reflectorized Raised Pavement Markers 84      EACH 12.00 1,008.00
0041 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 2.593  MILE 3,200.00 8,297.60
0042 732-05-00100 Removal of Existing Markings 0.5    MILE 4,500.00 2,250.00
0043 740-01-00100 Construction Layout 1      LUMP 60,000.00 60,000.00
0044 804-01-00300 Precast Concrete Piles (16") 3,260      LNFT 57.00 185,820.00
0045 804-12-00100 Loading Permanent Piles 3      EACH 1,000.00 3,000.00
0046 805-01-00300 Class A Concrete (Box Culvert Headwalls) 63.95   CUYD 1,150.00 73,542.50
0047 805-01-00700 Class A Concrete (Bents) 92.06   CUYD 1,150.00 105,869.00
0048 805-03-00100 Class AA Concrete 353.47   CUYD 900.00 318,123.00
0049 805-12-02040 Reinforced Concrete Box Culverts (7' x 5') 564      LNFT 540.00 304,560.00
0050 805-12-03080 Reinforced Concrete Box Culverts (10' x 6') 172      LNFT 825.00 141,900.00
0051 806-01-00100 Deformed Reinforcing Steel 84,631      LB 1.00 84,631.00
0052 810-01-00100 Concrete Railing (Standard Barrier) 520      LNFT 97.00 50,440.00
0053 813-01-00100 Concrete Approach Slabs 413.34   SQYD 195.00 80,601.30
0054 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 402      INLF 5.75 2,311.50
0055 NS-700-00180 Impact Attenuator (Construction Zone) 5      EACH 17,500.00 87,500.00
0056 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 2      EACH 2,500.00 5,000.00
             
    CONTRACTOR TOTAL       5,720,000.00