Bid Tabulations
Letting of
06/15/2011
LA DOTD Headquarters
| Lead Project: 067-09-0042 | |
| Parish: Ouachita | |
| Routes: LA 34 | |
| Description: BLACK BAYOU BRIDGE - 100' S. OF OLD NATCHITOCHES RD. | |
| Type Const: GRADING, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $301,339.41 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $410,307.50 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $523,083.01 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Diamond B Construction Co., L.L.C. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) (tree trimming) | 1 | LUMP | 9,000.00 | 9,000.00 | 2,041.10 | 2,041.10 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 1,275.69 | 1,275.69 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 829 | LNFT | 5.00 | 4,145.00 | 8.50 | 7,046.50 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 20 | CUYD | 25.00 | 500.00 | 59.53 | 1,190.60 |
| 0005 | 501-01-00005 | Thin Asphaltic Concrete (Coarse Mix) | 798.6 | TON | 195.00 | 155,727.00 | 274.98 | 219,599.03 |
| 0006 | 501-02-00001 | Tack Coat (quantity is for Thin Asphaltic Concrete layer only) | 2,178 | GAL | 5.00 | 10,890.00 | 12.39 | 26,985.42 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 161.3 | TON | 200.00 | 32,260.00 | 267.24 | 43,105.81 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 53.7 | TON | 300.00 | 16,110.00 | 547.15 | 29,381.96 |
| 0009 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,623 | SQYD | 12.00 | 31,476.00 | 15.87 | 41,627.01 |
| 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -74 | CUYD | 0.10 | -7.40 | 1.00 | -74.00 |
| 0011 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 32 | SQYD | 250.00 | 8,000.00 | 566.26 | 18,120.32 |
| 0012 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 3,000.00 | 6,000.00 | 4,762.57 | 9,525.14 |
| 0013 | 702-04-00100 | Adjusting Manholes | 6 | EACH | 1,200.00 | 7,200.00 | 1,871.01 | 11,226.06 |
| 0014 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 2,500.00 | 7,500.00 | 3,742.01 | 11,226.03 |
| 0015 | 707-01-00100 | Concrete Curb | 829 | LNFT | 15.00 | 12,435.00 | 20.41 | 16,919.89 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 11,279.88 | 11,279.88 |
| 0017 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 42 | LNFT | 3.00 | 126.00 | 1.02 | 42.84 |
| 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.874 | MILE | 250.00 | 468.50 | 261.38 | 489.83 |
| 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.78 | MILE | 250.00 | 445.00 | 510.28 | 908.30 |
| 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.196 | MILE | 350.00 | 768.60 | 1,020.55 | 2,241.13 |
| 0021 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 75.00 | 300.00 | 340.18 | 1,360.72 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 3,500.00 | 700.00 | 8,504.60 | 1,700.92 |
| 0023 | 717-01-00100 | Seeding | 7 | LB | 50.00 | 350.00 | 85.05 | 595.35 |
| 0024 | 718-01-00100 | Fertilizer | 110 | LB | 5.00 | 550.00 | 3.40 | 374.00 |
| 0025 | 726-01-00100 | Bedding Material | 3.2 | CUYD | 100.00 | 320.00 | 204.11 | 653.15 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 33,045.68 | 33,045.68 |
| 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,112 | EACH | 6.00 | 6,672.00 | 7.65 | 8,506.80 |
| 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 42 | LNFT | 12.00 | 504.00 | 8.50 | 357.00 |
| 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.196 | MILE | 3,600.00 | 7,905.60 | 4,422.38 | 9,711.55 |
| 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.098 | MILE | 1,500.00 | 1,647.00 | 1,700.92 | 1,867.61 |
| 0031 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 750.00 | 3,000.00 | 680.37 | 2,721.48 |
| 0032 | 735-01-00100 | Mailboxes | 2 | EACH | 5.00 | 10.00 | 1.70 | 3.40 |
| 0033 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 500.00 | 1,000.00 | 850.46 | 1,700.92 |
| 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000.00 | 1,000.00 | 3,231.74 | 3,231.74 |
| 0035 | 741-11-00100 | Adjusting Water Valve | 1 | EACH | 750.00 | 750.00 | 1,020.55 | 1,020.55 |
| 0036 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 2,592 | INLF | 0.60 | 1,555.20 | 0.80 | 2,073.60 |
| CONTRACTOR TOTAL | 410,307.50 | 523,083.01 | ||||||