Bid Tabulations
Letting of
01/26/2011
LA DOTD Headquarters
| Lead Project: 065-01-0016 | |
| Parish: Lafourche | |
| Routes: LA 24 | |
| Description: LA 24 RAISING | |
| Type Const: GRADING, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $820,856.77 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06487 | Huey Stockstill, Inc. | $692,500.80 |
| 2 | 06276 | Barriere Construction Co., LLC | $720,200.70 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Huey Stockstill, Inc. |
- 2 - Barriere Construction Co., LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 585 | CUYD | 23.00 | 13,455.00 | 20.00 | 11,700.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 5,993.2 | TON | 86.00 | 515,415.20 | 75.00 | 449,490.00 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 195 | TON | 86.00 | 16,770.00 | 75.00 | 14,625.00 |
| 0004 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 100 | SQYD | 40.00 | 4,000.00 | 50.00 | 5,000.00 |
| 0005 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 225 | SQYD | 80.00 | 18,000.00 | 100.00 | 22,500.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,000.00 | 9,000.00 | 70,000.00 | 70,000.00 |
| 0007 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,000 | LNFT | 0.20 | 200.00 | 0.25 | 250.00 |
| 0008 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 600 | LNFT | 0.50 | 300.00 | 0.80 | 480.00 |
| 0009 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.08 | MILE | 200.00 | 616.00 | 140.00 | 431.20 |
| 0010 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.44 | MILE | 10.00 | 54.40 | 500.00 | 2,720.00 |
| 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 11.65 | MILE | 10.00 | 116.50 | 550.00 | 6,407.50 |
| 0012 | 717-01-00100 | Seeding | 37 | LB | 15.00 | 555.00 | 20.00 | 740.00 |
| 0013 | 718-01-00100 | Fertilizer | 1,236 | LB | 0.45 | 556.20 | 0.75 | 927.00 |
| 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 68,000.00 | 68,000.00 | 70,000.00 | 70,000.00 |
| 0015 | 731-02-00100 | Reflectorized Raised Pavement Markers | 675 | EACH | 5.50 | 3,712.50 | 5.00 | 3,375.00 |
| 0016 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 500 | LNFT | 1.50 | 750.00 | 1.00 | 500.00 |
| 0017 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 300 | LNFT | 5.00 | 1,500.00 | 4.50 | 1,350.00 |
| 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.68 | MILE | 2,800.00 | 13,104.00 | 2,750.00 | 12,870.00 |
| 0019 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.44 | MILE | 900.00 | 1,296.00 | 850.00 | 1,224.00 |
| 0020 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 40,000.00 | 40,000.00 |
| 0021 | NS-500-00280 | Surface Preparation | 1 | LUMP | 18,000.00 | 18,000.00 | 1.00 | 1.00 |
| 0022 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 1.7 | MILE | 1,000.00 | 1,700.00 | 1,500.00 | 2,550.00 |
| 0023 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 3.4 | MILE | 1,000.00 | 3,400.00 | 900.00 | 3,060.00 |
| CONTRACTOR TOTAL | 692,500.80 | 720,200.70 | ||||||