Bid Tabulations
Letting of
09/29/2010
LA DOTD Headquarters
| Lead Project: 062-05-0043 | |
| Parish: Plaquemines | |
| Routes: LA 23 | |
| Description: LA 23 (CIVIC DRIVE TO PLAQUEMINES HWY 11) | |
| Type Const: COLD PLANING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, STRIPING AND RELATED WORK | |
| Estimated Construction Cost: $1,323,029.71 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,389,602.25 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $1,506,636.25 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 100 | LNFT | 18.00 | 1,800.00 | 25.00 | 2,500.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 100 | LNFT | 16.00 | 1,600.00 | 15.00 | 1,500.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 310 | CUYD | 13.00 | 4,030.00 | 35.00 | 10,850.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 9,219 | TON | 83.00 | 765,177.00 | 95.00 | 875,805.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 100 | TON | 210.00 | 21,000.00 | 150.00 | 15,000.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 79,348 | SQYD | 2.00 | 158,696.00 | 3.00 | 238,044.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,204 | CUYD | 10.00 | -22,040.00 | 10.00 | -22,040.00 |
| 0008 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 200 | SQYD | 60.00 | 12,000.00 | 80.00 | 16,000.00 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 645 | SQYD | 82.00 | 52,890.00 | 120.00 | 77,400.00 |
| 0010 | 510-03-00100 | Pavement Joint Repair | 25 | TON | 350.00 | 8,750.00 | 500.00 | 12,500.00 |
| 0011 | 701-14-00100 | Cleaning Existing Pipes | 3,600 | LNFT | 5.00 | 18,000.00 | 4.00 | 14,400.00 |
| 0012 | 707-01-00100 | Concrete Curb | 100 | LNFT | 35.00 | 3,500.00 | 15.00 | 1,500.00 |
| 0013 | 707-03-00100 | Combination Concrete Curb and Gutter | 100 | LNFT | 35.00 | 3,500.00 | 32.00 | 3,200.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 130,000.00 | 130,000.00 | 33,000.00 | 33,000.00 |
| 0015 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 45 | LNFT | 0.75 | 33.75 | 0.10 | 4.50 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.2 | MILE | 350.00 | 3,220.00 | 10.00 | 92.00 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.6 | MILE | 500.00 | 2,300.00 | 15.00 | 69.00 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.2 | MILE | 550.00 | 5,060.00 | 20.00 | 184.00 |
| 0019 | 717-01-00100 | Seeding | 57 | LB | 5.00 | 285.00 | 15.50 | 883.50 |
| 0020 | 718-01-00100 | Fertilizer | 1,894 | LB | 0.50 | 947.00 | 1.00 | 1,894.00 |
| 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 130,000.00 | 130,000.00 | 150,000.00 | 150,000.00 |
| 0022 | 731-02-00100 | Reflectorized Raised Pavement Markers | 818 | EACH | 5.25 | 4,294.50 | 5.25 | 4,294.50 |
| 0023 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 45 | LNFT | 4.50 | 202.50 | 4.75 | 213.75 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.2 | MILE | 2,500.00 | 23,000.00 | 2,500.00 | 23,000.00 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.6 | MILE | 900.00 | 4,140.00 | 900.00 | 4,140.00 |
| 0027 | 735-01-00100 | Mailboxes | 21 | EACH | 5.50 | 115.50 | 6.00 | 126.00 |
| 0028 | 735-02-00100 | Mailbox Supports (Single) | 21 | EACH | 125.00 | 2,625.00 | 170.00 | 3,570.00 |
| 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 2,000.00 | 2,000.00 |
| 0030 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 75 | LNFT | 5.00 | 375.00 | 10.00 | 750.00 |
| 0031 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 60 | LNFT | 5.00 | 300.00 | 10.00 | 600.00 |
| 0032 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 500 | LNFT | 2.00 | 1,000.00 | 2.00 | 1,000.00 |
| 0033 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 10,320 | INLF | 0.65 | 6,708.00 | 0.75 | 7,740.00 |
| 0034 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 2,040 | INLF | 0.85 | 1,734.00 | 1.00 | 2,040.00 |
| 0035 | NS-702-00001 | Cleaning Existing Catch Basin | 100 | EACH | 300.00 | 30,000.00 | 200.00 | 20,000.00 |
| 0036 | NS-724-00001 | Rumble Strips (Centerline Ground-In) | 1.9 | MILE | 1,000.00 | 1,900.00 | 1,000.00 | 1,900.00 |
| 0037 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 2 | MILE | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
| 0038 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 340 | LNFT | 1.35 | 459.00 | 1.40 | 476.00 |
| CONTRACTOR TOTAL | 1,389,602.25 | 1,506,636.25 | ||||||