Bid Tabulations
Letting of
11/17/2010
LA DOTD Headquarters
| Lead Project: 062-01-0031-R1 | |
| Parish: Jefferson | |
| Routes: LA 18 | |
| Description: 4th ST. - US 90B & WEYER AVE. - LA 560-2 | |
| Type Const: CLASS II BASE COURSE, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,915,486.02 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $2,128,304.80 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $2,160,588.45 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 675 | CUYD | 35.00 | 23,625.00 | 15.00 | 10,125.00 |
| 0003 | 302-02-02000 | Class II Base Course (6" Thick) | 1,690 | SQYD | 35.00 | 59,150.00 | 20.00 | 33,800.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 6,692.3 | TON | 85.00 | 568,845.50 | 95.00 | 635,768.50 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,510.5 | TON | 120.00 | 181,260.00 | 95.00 | 143,497.50 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 63,492 | SQYD | 3.00 | 190,476.00 | 4.00 | 253,968.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,646 | CUYD | 10.00 | -26,460.00 | 7.00 | -18,522.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,500 | SQYD | 70.00 | 105,000.00 | 110.00 | 165,000.00 |
| 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 190,000.00 | 190,000.00 | 100,000.00 | 100,000.00 |
| 0011 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 144 | LNFT | 0.25 | 36.00 | 0.20 | 28.80 |
| 0012 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 576 | LNFT | 1.00 | 576.00 | 1.00 | 576.00 |
| 0013 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.86 | MILE | 0.70 | 9.70 | 30.00 | 415.80 |
| 0014 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 5.61 | MILE | 500.00 | 2,805.00 | 50.00 | 280.50 |
| 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 23.52 | MILE | 550.00 | 12,936.00 | 60.00 | 1,411.20 |
| 0016 | 717-01-00100 | Seeding | 61.4 | LB | 12.00 | 736.80 | 15.00 | 921.00 |
| 0017 | 718-01-00100 | Fertilizer | 2,040 | LB | 0.65 | 1,326.00 | 0.40 | 816.00 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 210,000.00 | 210,000.00 | 200,000.00 | 200,000.00 |
| 0019 | 729-19-00300 | Dead End Road Installations (Type C) | 3 | EACH | 600.00 | 1,800.00 | 600.00 | 1,800.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 380 | EACH | 5.50 | 2,090.00 | 5.50 | 2,090.00 |
| 0021 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 98 | LNFT | 1.50 | 147.00 | 1.50 | 147.00 |
| 0022 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 192 | LNFT | 4.50 | 864.00 | 5.00 | 960.00 |
| 0023 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 2 | MILE | 2,100.00 | 4,200.00 | 2,200.00 | 4,400.00 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.84 | MILE | 2,500.00 | 14,600.00 | 2,750.00 | 16,060.00 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.87 | MILE | 850.00 | 1,589.50 | 935.00 | 1,748.45 |
| 0026 | 736-09-00100 | Loop Detector | 132 | LNFT | 12.00 | 1,584.00 | 22.00 | 2,904.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 |
| 0028 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 13,750 | LNFT | 2.00 | 27,500.00 | 2.00 | 27,500.00 |
| 0029 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 19,750 | LNFT | 2.00 | 39,500.00 | 2.00 | 39,500.00 |
| 0030 | NS-500-00260 | Sawcuts in Asphaltic Concrete Lifts | 67,000 | LNFT | 1.25 | 83,750.00 | 0.10 | 6,700.00 |
| 0032 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 1,700.00 | 6,800.00 | 6,000.00 | 24,000.00 |
| 0033 | 202-02-06140 | Removal of Curbs (Concrete) | 2,570 | LNFT | 12.00 | 30,840.00 | 11.00 | 28,270.00 |
| 0034 | 202-02-14500 | Removal of Guard Rail | 156 | LNFT | 11.00 | 1,716.00 | 11.00 | 1,716.00 |
| 0035 | 202-02-38240 | Removal of Signs and Supports | 1 | EACH | 425.00 | 425.00 | 380.00 | 380.00 |
| 0036 | 202-02-38260 | Removal of Sign Support Footings | 1 | EACH | 425.00 | 425.00 | 380.00 | 380.00 |
| 0037 | 202-02-38500 | Removal of Surfacing and Stablized Base | 57.8 | SQYD | 50.00 | 2,890.00 | 15.00 | 867.00 |
| 0038 | 510-02-00100 | Pavement Widening | 86.7 | SQYD | 75.00 | 6,502.50 | 115.00 | 9,970.50 |
| 0039 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 10 | EACH | 2,000.00 | 20,000.00 | 2,700.00 | 27,000.00 |
| 0040 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 125 | LNFT | 70.00 | 8,750.00 | 66.00 | 8,250.00 |
| 0041 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 65.00 | 3,250.00 | 22.00 | 1,100.00 |
| 0042 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,800.00 | 11,200.00 | 2,800.00 | 11,200.00 |
| 0043 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 11 | SQYD | 75.00 | 825.00 | 200.00 | 2,200.00 |
| 0044 | 706-04-00100 | Handicapped Curb Ramps | 90 | EACH | 1,900.00 | 171,000.00 | 2,800.00 | 252,000.00 |
| 0045 | 707-01-00100 | Concrete Curb | 2,610 | LNFT | 32.00 | 83,520.00 | 35.00 | 91,350.00 |
| 0046 | 707-01-00200 | Concrete Curb (Barrier) | 40 | LNFT | 35.00 | 1,400.00 | 35.00 | 1,400.00 |
| 0047 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 100 | LNFT | 0.25 | 25.00 | 0.20 | 20.00 |
| 0048 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 2 | EACH | 0.55 | 1.10 | 50.00 | 100.00 |
| 0049 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 2 | EACH | 0.55 | 1.10 | 50.00 | 100.00 |
| 0050 | 729-01-00100 | Sign (Type A) | 6.8 | SQFT | 27.00 | 183.60 | 24.00 | 163.20 |
| 0051 | 729-08-00100 | Mounting (2 1/2" Size Post) | 1 | EACH | 2,600.00 | 2,600.00 | 2,640.00 | 2,640.00 |
| 0052 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 88.00 | 352.00 |
| 0054 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 2,160 | LNFT | 1.80 | 3,888.00 | 2.00 | 4,320.00 |
| 0055 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 220.00 | 220.00 | 240.00 | 240.00 |
| 0056 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 220.00 | 220.00 | 250.00 | 250.00 |
| 0057 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 39,360 | INLF | 1.10 | 43,296.00 | 0.90 | 35,424.00 |
| CONTRACTOR TOTAL | 2,128,304.80 | 2,160,588.45 | ||||||