Letting of 12/13/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 860-08-0018
Parish: WEBSTER
Routes: LA 163
Description: JUNCTION LA 527 - JUNCTION LA 164 (SOUTH SECTION)
Type Const: grading, drainage structure, superpave acp, pavement patch and related work.
Estimated Construction Cost: $1,382,312.55
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,071,150.25
2 17464 BENTON & BROWN, LLC. $1,241,253.64
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.
- 2 -
BENTON & BROWN, LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 10      SQYD 40.00 400.00 50.00 500.00        
203-08 borrow (vehicular measurement) 4,000      CUYD 1.00 4,000.00 15.00 60,000.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
200      CUYD 15.00 3,000.00 70.00 14,000.00        
502-01 superpave asphaltic concrete 6,925.8    TON 68.00 470,954.40 75.00 519,435.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
3,360.0    TON 74.00 248,640.00 75.00 252,000.00        
701-05-I side drain pipe (24") 4      LNFT 140.00 560.00 120.00 480.00        
701-08 relaying pipe 44      LNFT 120.00 5,280.00 140.00 6,160.00        
701-10-I reinforced concrete pipe (extension)(24") 22      LNFT 140.00 3,080.00 150.00 3,300.00        
701-10-M reinforced concrete pipe (extension)(36") 60      LNFT 180.00 10,800.00 160.00 9,600.00        
701-12-I corrugated metal pipe (extension)(24") 12      LNFT 163.00 1,956.00 200.00 2,400.00        
701-15 concrete collar 3      EACH 700.00 2,100.00 1,000.00 3,000.00        
712-04 flexible revetment 1,399      SQYD 70.00 97,930.00 60.00 83,940.00        
713-01 temporary signs & barricades lump      LUMP 38,000.00 38,000.00 60,000.00 60,000.00        
713-03-E temporary pavement markings (24" width) 14      LNFT 1.00 14.00 1.00 14.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.054  MILE 325.00 1,967.55 360.00 2,179.44        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.091  MILE 1.00 1.09 1.00 1.09        
713-05-A temporary pavement markings (solid line)(4" width) 10.708  MILE 1.00 10.71 1.00 10.71        
716-01-A mulch (vegetative) 5.41   ACRE 1,400.00 7,574.00 2,100.00 11,361.00        
724-01-A pavement patching (6" minimum thickness) 630      SQYD 42.00 26,460.00 35.00 22,050.00        
727-01 mobilization lump      LUMP 38,000.00 38,000.00 70,000.00 70,000.00        
731-02 reflectorized raised pavement markers 417      EACH 4.50 1,876.50 6.00 2,502.00        
732-01-E plastic pavement striping (24" width) 14      LNFT 3.00 42.00 4.00 56.00        
732-02-A plastic pavement striping (solid line) (4" width) 10.708  MILE 2,150.00 23,022.20 2,700.00 28,911.60        
732-03-A plastic pavement striping (broken line)(4" width) 1.091  MILE 800.00 872.80 800.00 872.80        
735-01 mailboxes 28      EACH 1.00 28.00 2.00 56.00        
735-02 mailbox supports (single) 26      EACH 140.00 3,640.00 170.00 4,420.00        
735-03 mailbox supports (double) 1      EACH 190.00 190.00 225.00 225.00        
739-01 hydro-seeding 5.41   ACRE 1,100.00 5,951.00 1,900.00 10,279.00        
740-01 construction layout lump      LUMP 12,000.00 12,000.00 18,000.00 18,000.00        
744-01 traffic control management lump      LUMP 12,000.00 12,000.00 15,000.00 15,000.00        
S-001 surface preparation lump      LUMP 50,000.00 50,000.00 40,000.00 40,000.00        
S-002 sawing existing drives (4" thick) 20      LNFT 40.00 800.00 25.00 500.00        
                       
 CONTRACTOR TOTAL       1,071,150.25   1,241,253.64        