Error processing SSI file
Error processing SSI file
Bid Tabs Error processing SSI file
Bid Tabulations Error processing SSI file
February 06, 2014 Error processing SSI file

Letting of 12/13/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 829-11-0012
Parish: LAFOURCHE
Routes: LA 657
Description: LA 308 - END OF CONTROL
Type Const: grading, superpave asphaltic concrete pavment overlay, pavement patching and related
work.
Estimated Construction Cost: $945,762.40
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $876,578.37
2 06487 HUEY STOCKSTILL, INC. $1,169,239.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 325      CUYD 10.00 3,250.00 13.00 4,225.00        
306-02 scarifying and compacting roadbed (6" thick) 3,872      SQYD 2.00 7,744.00 4.00 15,488.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
353      CUYD 90.00 31,770.00 85.00 30,005.00        
502-01 superpave asphaltic concrete 4,046.6    TON 80.00 323,728.00 93.00 376,333.80        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,058.4    TON 80.00 84,672.00 120.00 127,008.00        
702-04-B adjusting catch basins 2      EACH 1,000.00 2,000.00 3,000.00 6,000.00        
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 50,000.00 50,000.00        
713-03-E temporary pavement markings (24" width) 372      LNFT 0.10 37.20 1.20 446.40        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
5.850  MILE 0.10 0.59 180.00 1,053.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.510  MILE 0.10 0.05 500.00 255.00        
713-05-A temporary pavement markings (solid line)(4" width) 5.280  MILE 0.10 0.53 500.00 2,640.00        
724-01-B pavement patching (12" minimum thickness) 5,000      SQYD 60.00 300,000.00 75.00 375,000.00        
724-02 pavement widening 20.0    SQYD 60.00 1,200.00 110.00 2,200.00        
724-03 pavement joint repair 100.0    TON 25.00 2,500.00 300.00 30,000.00        
727-01 mobilization lump      LUMP 75,000.00 75,000.00 100,000.00 100,000.00        
729-01 sign (type a) 15.8    SQFT 60.00 948.00 60.00 948.00        
729-16-B object marker assembly (type 2) 8      EACH 70.00 560.00 70.00 560.00        
731-02 reflectorized raised pavement markers 275      EACH 6.00 1,650.00 5.50 1,512.50        
732-01-E plastic pavement striping (24" width) 186      LNFT 3.00 558.00 3.00 558.00        
732-02-A plastic pavement striping (solid line) (4" width) 1.760  MILE 3,000.00 5,280.00 2,500.00 4,400.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.170  MILE 800.00 136.00 700.00 119.00        
735-01 mailboxes 54      EACH 1.00 54.00 1.00 54.00        
735-02 mailbox supports (single) 45      EACH 150.00 6,750.00 140.00 6,300.00        
735-03 mailbox supports (double) 3      EACH 200.00 600.00 200.00 600.00        
735-04 mailbox supports (multiple) 1      EACH 400.00 400.00 400.00 400.00        
740-01 construction layout lump      LUMP 6,000.00 6,000.00 6,000.00 6,000.00        
741-11 adjusting water valve and meter box 1      EACH 40.00 40.00 800.00 800.00        
744-01 traffic control management lump      LUMP 1,000.00 1,000.00 500.00 500.00        
S-001 surface preparation 2,500      SQYD 2.00 5,000.00 9.00 22,500.00        
S-002 cleaning catch basins 2      EACH 200.00 400.00 500.00 1,000.00        
S-003 cleaning existing drainage culverts (18" to 36") 132      LNFT 25.00 3,300.00 12.00 1,584.00        
S-004 cleaning existing drainage culverts (larger than 36") 50      LNFT 40.00 2,000.00 15.00 750.00        
                       
 CONTRACTOR TOTAL       876,578.37   1,169,239.70        

Error processing SSI file