Letting of 12/13/2006 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 744-17-0015
Parish: E BATON ROUGE
Routes:
Description: BICYCLE/PEDESTRIAN PATH IMPROVEMENTS - DALRYMPLE DRIVE
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
bike path and related work.
Estimated Construction Cost: $905,782.74
 
RankLicenseBidderConstruction Bid
1 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,438,735.10
 
Item Number Item Description Quantity Unit of Measure - 1 -
F.G. SULLIVAN, JR. CONTRACTOR LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00            
202-01 removal of structures & obstructions lump      LUMP 1,000.00 1,000.00            
202-02-D removal of concrete walks & drives 296      SQYD 8.00 2,368.00            
202-02-I removal of existing path 6,837      SQYD 8.00 54,696.00            
203-03 muck excavation 49      CUYD 50.00 2,450.00            
203-06 excavation & embankment lump      LUMP 190,000.00 190,000.00            
203-09 geotextile fabric 396      SQYD 6.00 2,376.00            
204-06 temporary silt fencing 16,540      LNFT 1.60 26,464.00            
302-02-A-01 class ii base course (6" thick)(stone) 12,852.7    SQYD 38.00 488,402.60            
502-03 superpave asphaltic concrete (2" thick) 11,995      SQYD 24.00 287,880.00            
702-04-A adjusting manholes 3      EACH 700.00 2,100.00            
702-04-B adjusting catch basins 4      EACH 700.00 2,800.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 93.8    LNFT 65.00 6,097.00            
704-03 blocked out guard rail 87.5    LNFT 30.00 2,625.00            
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
12.5    LNFT 100.00 1,250.00            
704-11-B guard rail end treatment (tangent) 2      EACH 2,500.00 5,000.00            
706-01-A concrete walk (4" thick) 827.5    SQYD 57.00 47,167.50            
711-02-D riprap (55 lb) 11      CUYD 150.00 1,650.00            
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00            
723-01 granular material (net section) 49      CUYD 50.00 2,450.00            
727-01 mobilization lump      LUMP 27,000.00 27,000.00            
729-01 sign (type a) 147.5    SQFT 20.00 2,950.00            
729-16-C object marker assembly (type 3) 4      EACH 110.00 440.00            
729-21 u-channel post 44      EACH 90.00 3,960.00            
732-02-B plastic pavement striping (solid line) (6" width)
(white)
2.643  MILE 3,000.00 7,929.00            
732-02-C plastic pavement striping (solid line) (8" width)
(white)
0.076  MILE 5,000.00 380.00            
732-02-D plastic pavement striping (solid line) (12" width)
(white)
0.009  MILE 6,000.00 54.00            
732-03-B-04 plastic pavement striping (broken line)(6" width)
(white)
0.038  MILE 3,000.00 114.00            
732-03-B-05 plastic pavement striping (broken line)(6" width)
(yellow)
0.284  MILE 3,000.00 852.00            
732-04-A plastic pavement legends & symbols (arrow) 30      EACH 200.00 6,000.00            
732-04-F plastic pavement legends & symbols (bicycle) 42      EACH 200.00 8,400.00            
732-04-G plastic pavement legends & symbols (pedestrian) 12      EACH 200.00 2,400.00            
732-04-H plastic pavement legends & symbols ("xing") 14      EACH 200.00 2,800.00            
732-04-I plastic pavement legends & symbols ("road") 7      EACH 200.00 1,400.00            
732-04-K plastic pavement legends & symbols ("stop") 2      EACH 200.00 400.00            
739-01 hydro-seeding 0.71   ACRE 2,000.00 1,420.00            
740-01 construction layout lump      LUMP 30,000.00 30,000.00            
741-11 adjusting water valve and meter box 2      EACH 500.00 1,000.00            
744-01 traffic control management lump      LUMP 60,000.00 60,000.00            
S-001 railing type 1 (at golf course) 756      LNFT 30.00 22,680.00            
S-003 trench drain 97      LNFT 240.00 23,280.00            
S-004 adjust gas valve 2      EACH 500.00 1,000.00            
S-005 stone 100      CUYD 75.00 7,500.00            
S-006 extend existing box culvert and headwall lump      LUMP 60,000.00 60,000.00            
                       
 CONTRACTOR TOTAL       1,438,735.10            