Letting of 12/13/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 737-90-0042
Parish: DISTRICT 62
Routes:
Description: DISTRICT 62 GUARD RAIL REPLACEMENT
Type Const: guard rail replacement and related work.
Estimated Construction Cost: $707,247.86
 
RankLicenseBidderConstruction Bid
1 38764 ATWOOD FENCE COMPANY INC. $685,007.60
2 23811 UNITED RENTALS HWY TECHNOLOGIES INC $718,985.00
3 34068 ALPHA SERVICE AND PRODUCTS, INC. $808,056.05
4 27043 JACK B. HARPER CONTRACTOR, INC. $839,327.90
5 00164 TRAFFIC SOLUTIONS, INC. $984,795.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
ATWOOD FENCE COMPANY INC.
- 2 -
UNITED RENTALS HWY TECHNOLOGIES INC
- 3 -
ALPHA SERVICE AND PRODUCTS, INC.
- 4 -
JACK B. HARPER CONTRACTOR, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 14,112      LNFT 5.50 77,616.00 5.00 70,560.00 5.00 70,560.00 5.00 70,560.00
203-08 borrow (vehicular measurement) 2,075      CUYD 22.00 45,650.00 40.00 83,000.00 50.00 103,750.00 25.00 51,875.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 400.0    LNFT 45.00 18,000.00 50.00 20,000.00 37.00 14,800.00 75.00 30,000.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 1,822.0    LNFT 42.50 77,435.00 45.00 81,990.00 51.00 92,922.00 50.00 91,100.00
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 1,206.3    LNFT 50.00 60,315.00 50.00 60,315.00 48.00 57,902.40 65.00 78,409.50
704-03 blocked out guard rail 5,493.9    LNFT 19.00 104,384.10 20.00 109,878.00 19.00 104,384.10 22.00 120,865.80
704-06 guard rail anchor sections (trailing end) 37.5    LNFT 75.00 2,812.50 75.00 2,812.50 73.50 2,756.25 90.00 3,375.00
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
18.8    LNFT 85.00 1,598.00 80.00 1,504.00 85.00 1,598.00 100.00 1,880.00
704-07-A guard rail bridge attachments (single thrie beam) 331.3    LNFT 35.00 11,595.50 35.00 11,595.50 41.00 13,583.30 52.00 17,227.60
704-08-B guard rail transitions (double thrie beam) 1,237.5    LNFT 55.00 68,062.50 50.00 61,875.00 56.00 69,300.00 72.00 89,100.00
704-10 guard rail anchor block 15      EACH 1,100.00 16,500.00 1,800.00 27,000.00 2,250.00 33,750.00 1,500.00 22,500.00
704-11-A guard rail end treatment (flared) 71      EACH 2,000.00 142,000.00 1,800.00 127,800.00 2,000.00 142,000.00 2,500.00 177,500.00
704-11-B guard rail end treatment (tangent) 4      EACH 2,500.00 10,000.00 2,500.00 10,000.00 2,400.00 9,600.00 4,500.00 18,000.00
707-01 concrete curb 360.0    LNFT 15.00 5,400.00 15.00 5,400.00 50.00 18,000.00 23.00 8,280.00
713-01 temporary signs and barricades lump      LUMP 3,500.00 3,500.00 5,000.00 5,000.00 10,000.00 10,000.00 8,000.00 8,000.00
720-01-A erosion control system, slope protection (type a) 1,950      SQYD 2.00 3,900.00 1.50 2,925.00 3.70 7,215.00 5.00 9,750.00
727-01 mobilization lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 10,000.00 10,000.00
729-16-A object marker assembly (type 1) 25      EACH 45.00 1,125.00 50.00 1,250.00 115.00 2,875.00 85.00 2,125.00
729-16-C object marker assembly (type 3) 84      EACH 70.00 5,880.00 70.00 5,880.00 85.00 7,140.00 95.00 7,980.00
739-01 hydro-seeding 5.20   ACRE 1,295.00 6,734.00 1,000.00 5,200.00 2,100.00 10,920.00 1,500.00 7,800.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 10,000.00 10,000.00 5,000.00 5,000.00
744-01 traffic control management lump      LUMP 2,500.00 2,500.00 5,000.00 5,000.00 10,000.00 10,000.00 8,000.00 8,000.00
                       
 CONTRACTOR TOTAL       685,007.60   718,985.00   808,056.05   839,327.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
TRAFFIC SOLUTIONS, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 14,112      LNFT 5.50 77,616.00            
203-08 borrow (vehicular measurement) 2,075      CUYD 12.00 24,900.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 400.0    LNFT 60.00 24,000.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 1,822.0    LNFT 47.00 85,634.00            
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 1,206.3    LNFT 55.00 66,346.50            
704-03 blocked out guard rail 5,493.9    LNFT 18.00 98,890.20            
704-06 guard rail anchor sections (trailing end) 37.5    LNFT 70.00 2,625.00            
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
18.8    LNFT 90.00 1,692.00            
704-07-A guard rail bridge attachments (single thrie beam) 331.3    LNFT 40.00 13,252.00            
704-08-B guard rail transitions (double thrie beam) 1,237.5    LNFT 58.00 71,775.00            
704-10 guard rail anchor block 15      EACH 2,000.00 30,000.00            
704-11-A guard rail end treatment (flared) 71      EACH 2,200.00 156,200.00            
704-11-B guard rail end treatment (tangent) 4      EACH 2,600.00 10,400.00            
707-01 concrete curb 360.0    LNFT 16.00 5,760.00            
713-01 temporary signs and barricades lump      LUMP 100,000.00 100,000.00            
720-01-A erosion control system, slope protection (type a) 1,950      SQYD 1.60 3,120.00            
727-01 mobilization lump      LUMP 90,000.00 90,000.00            
729-16-A object marker assembly (type 1) 25      EACH 65.00 1,625.00            
729-16-C object marker assembly (type 3) 84      EACH 80.00 6,720.00            
739-01 hydro-seeding 5.20   ACRE 1,200.00 6,240.00            
740-01 construction layout lump      LUMP 63,000.00 63,000.00            
744-01 traffic control management lump      LUMP 45,000.00 45,000.00            
                       
 CONTRACTOR TOTAL       984,795.70            