| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - ATWOOD FENCE COMPANY INC. |
- 2 - UNITED RENTALS HWY TECHNOLOGIES INC |
- 3 - ALPHA SERVICE AND PRODUCTS, INC. |
- 4 - JACK B. HARPER CONTRACTOR, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
14,112   |
LNFT |
5.50 |
77,616.00 |
5.00 |
70,560.00 |
5.00 |
70,560.00 |
5.00 |
70,560.00 |
| 203-08 |
borrow (vehicular measurement)
|
2,075   |
CUYD |
22.00 |
45,650.00 |
40.00 |
83,000.00 |
50.00 |
103,750.00 |
25.00 |
51,875.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
400.0 |
LNFT |
45.00 |
18,000.00 |
50.00 |
20,000.00 |
37.00 |
14,800.00 |
75.00 |
30,000.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,822.0 |
LNFT |
42.50 |
77,435.00 |
45.00 |
81,990.00 |
51.00 |
92,922.00 |
50.00 |
91,100.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
1,206.3 |
LNFT |
50.00 |
60,315.00 |
50.00 |
60,315.00 |
48.00 |
57,902.40 |
65.00 |
78,409.50 |
| 704-03 |
blocked out guard rail
|
5,493.9 |
LNFT |
19.00 |
104,384.10 |
20.00 |
109,878.00 |
19.00 |
104,384.10 |
22.00 |
120,865.80 |
| 704-06 |
guard rail anchor sections (trailing end)
|
37.5 |
LNFT |
75.00 |
2,812.50 |
75.00 |
2,812.50 |
73.50 |
2,756.25 |
90.00 |
3,375.00 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
18.8 |
LNFT |
85.00 |
1,598.00 |
80.00 |
1,504.00 |
85.00 |
1,598.00 |
100.00 |
1,880.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
331.3 |
LNFT |
35.00 |
11,595.50 |
35.00 |
11,595.50 |
41.00 |
13,583.30 |
52.00 |
17,227.60 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
1,237.5 |
LNFT |
55.00 |
68,062.50 |
50.00 |
61,875.00 |
56.00 |
69,300.00 |
72.00 |
89,100.00 |
| 704-10 |
guard rail anchor block
|
15   |
EACH |
1,100.00 |
16,500.00 |
1,800.00 |
27,000.00 |
2,250.00 |
33,750.00 |
1,500.00 |
22,500.00 |
| 704-11-A |
guard rail end treatment (flared)
|
71   |
EACH |
2,000.00 |
142,000.00 |
1,800.00 |
127,800.00 |
2,000.00 |
142,000.00 |
2,500.00 |
177,500.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
2,400.00 |
9,600.00 |
4,500.00 |
18,000.00 |
| 707-01 |
concrete curb
|
360.0 |
LNFT |
15.00 |
5,400.00 |
15.00 |
5,400.00 |
50.00 |
18,000.00 |
23.00 |
8,280.00 |
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
1,950   |
SQYD |
2.00 |
3,900.00 |
1.50 |
2,925.00 |
3.70 |
7,215.00 |
5.00 |
9,750.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
| 729-16-A |
object marker assembly (type 1)
|
25   |
EACH |
45.00 |
1,125.00 |
50.00 |
1,250.00 |
115.00 |
2,875.00 |
85.00 |
2,125.00 |
| 729-16-C |
object marker assembly (type 3)
|
84   |
EACH |
70.00 |
5,880.00 |
70.00 |
5,880.00 |
85.00 |
7,140.00 |
95.00 |
7,980.00 |
| 739-01 |
hydro-seeding
|
5.20 |
ACRE |
1,295.00 |
6,734.00 |
1,000.00 |
5,200.00 |
2,100.00 |
10,920.00 |
1,500.00 |
7,800.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
685,007.60 |
|
718,985.00 |
|
808,056.05 |
|
839,327.90 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - TRAFFIC SOLUTIONS, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
14,112   |
LNFT |
5.50 |
77,616.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
2,075   |
CUYD |
12.00 |
24,900.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
400.0 |
LNFT |
60.00 |
24,000.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,822.0 |
LNFT |
47.00 |
85,634.00 |
|
|
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
1,206.3 |
LNFT |
55.00 |
66,346.50 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
5,493.9 |
LNFT |
18.00 |
98,890.20 |
|
|
|
|
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
37.5 |
LNFT |
70.00 |
2,625.00 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
18.8 |
LNFT |
90.00 |
1,692.00 |
|
|
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
331.3 |
LNFT |
40.00 |
13,252.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
1,237.5 |
LNFT |
58.00 |
71,775.00 |
|
|
|
|
|
|
| 704-10 |
guard rail anchor block
|
15   |
EACH |
2,000.00 |
30,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
71   |
EACH |
2,200.00 |
156,200.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,600.00 |
10,400.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
360.0 |
LNFT |
16.00 |
5,760.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
1,950   |
SQYD |
1.60 |
3,120.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
90,000.00 |
90,000.00 |
|
|
|
|
|
|
| 729-16-A |
object marker assembly (type 1)
|
25   |
EACH |
65.00 |
1,625.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
84   |
EACH |
80.00 |
6,720.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
5.20 |
ACRE |
1,200.00 |
6,240.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
63,000.00 |
63,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
984,795.70 |
|
|
|
|
|
|
|