| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JERALD CREAMER ENTERPRISES INC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of pavement
|
53.3 |
SQYD |
10.00 |
533.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
400   |
CUYD |
15.00 |
6,000.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
45.00 |
4,500.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
160.0 |
LNFT |
60.00 |
9,600.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
100   |
SQYD |
3.00 |
300.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| 804-02-A-01 |
treated timber piles (noncoastal treatment)(12 @ 30')
|
360   |
LNFT |
20.00 |
7,200.00 |
|
|
|
|
|
|
| 812-01-A |
treated timber (land and fresh water)
|
1.64 |
MFBM |
2,000.00 |
3,280.00 |
|
|
|
|
|
|
| S-101 |
pile splice
|
3   |
EACH |
2,000.00 |
6,000.00 |
|
|
|
|
|
|
| S-102 |
pile concrete collars
|
3   |
EACH |
2,500.00 |
7,500.00 |
|
|
|
|
|
|
| S-103 |
repair deck girder end
|
lump |
LUMP |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| S-104 |
seal crack in deck girder
|
lump |
LUMP |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| S-105 |
clean and reseal longitudinal and transverse joints
|
lump |
LUMP |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| S-106 |
concrete approach slabs (w/out asphalt)
|
2   |
EACH |
9,000.00 |
18,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
104,313.00 |
|
|
|
|
|
|
|