Lead Project: 713-40-0128
Parish: RAPIDES
Routes:
Description: PHILADELPHIA ROAD BRIDGE REHABILITATION
Type Const: grading, bridge rehabilitation, guard rails and related work
Estimated Construction Cost: $90,199.40
 
RankLicenseBidderConstruction Bid
1 10940 JERALD CREAMER ENTERPRISES INC $104,313.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
JERALD CREAMER ENTERPRISES INC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of pavement 53.3    SQYD 10.00 533.00            
203-08 borrow (vehicular measurement) 400      CUYD 15.00 6,000.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 100.0    LNFT 45.00 4,500.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 160.0    LNFT 60.00 9,600.00            
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00            
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00            
720-01-A erosion control system, slope protection (type a) 100      SQYD 3.00 300.00            
727-01 mobilization lump      LUMP 15,000.00 15,000.00            
729-16-C object marker assembly (type 3) 4      EACH 100.00 400.00            
740-01 construction layout lump      LUMP 3,500.00 3,500.00            
804-02-A-01 treated timber piles (noncoastal treatment)(12 @ 30') 360      LNFT 20.00 7,200.00            
812-01-A treated timber (land and fresh water) 1.64   MFBM 2,000.00 3,280.00            
S-101 pile splice 3      EACH 2,000.00 6,000.00            
S-102 pile concrete collars 3      EACH 2,500.00 7,500.00            
S-103 repair deck girder end lump      LUMP 4,000.00 4,000.00            
S-104 seal crack in deck girder lump      LUMP 2,000.00 2,000.00            
S-105 clean and reseal longitudinal and transverse joints lump      LUMP 3,500.00 3,500.00            
S-106 concrete approach slabs (w/out asphalt) 2      EACH 9,000.00 18,000.00            
                       
 CONTRACTOR TOTAL       104,313.00            