Letting of 12/13/2006 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 713-35-0113
Parish: NATCHITOCHES
Routes:
Description: BELLWOOD CHURCH BRIDGE
Type Const: grading, class ii base course, superpave asphaltic conc pavement, concrete slab
span bridge and related work.
Estimated Construction Cost: $251,010.95
 
RankLicenseBidderConstruction Bid
1 09090 GUINN BROTHERS, LLC. $374,893.60
2 18546 C W & W CONTRACTORS, INC. $395,068.16
3 00060 F. MILLER CONSTRUCTION LLC $396,285.08
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
C W & W CONTRACTORS, INC.
- 3 -
F. MILLER CONSTRUCTION LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 15,000.00 15,000.00 12,000.00 12,000.00 5,000.00 5,000.00    
202-02-A-01 removal of bridge (sta. 3+000-6.18m x 11.89m timber
bridge with conc. deck & wingwalls)
1      ea 12,000.00 12,000.00 6,000.00 6,000.00 4,000.00 4,000.00    
203-06 excavation & embankment lump      lump 25,000.00 25,000.00 19,000.00 19,000.00 6,800.00 6,800.00    
204-02 temporary hay or straw bales 90      ea 0.00 0.00 10.00 900.00 38.00 3,420.00    
204-03 temporary slope drains 20      ln m 0.00 0.00 30.00 600.00 114.00 2,280.00    
204-05-A temporary sediment check dams (hay) 4      ea 0.00 0.00 125.00 500.00 132.00 528.00    
204-06 temporary silt fencing 25      ln m 0.00 0.00 10.00 250.00 60.00 1,500.00    
302-01 class ii base course 149.2    cu m 110.00 16,412.00 110.00 16,412.00 53.00 7,907.60    
401-02 aggregate surface course (adjusted vehicular
measurement)
12      cu m 100.00 1,200.00 120.00 1,440.00 228.00 2,736.00    
502-01 superpave asphaltic concrete 136.4    Mg 275.00 37,510.00 225.00 30,690.00 391.00 53,332.40    
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 195.00 5,943.60 200.00 6,096.00 257.00 7,833.36    
704-09 guard rail anchor sections (turndown) 30.48   ln m 100.00 3,048.00 100.00 3,048.00 129.00 3,931.92    
711-01-C riprap (15 kg, 360mm) 255      sq m 75.00 19,125.00 85.00 21,675.00 95.00 24,225.00    
711-04 geotextile fabric 255      sq m 5.00 1,275.00 4.50 1,147.50 4.00 1,020.00    
713-01 temporary signs & barricades lump      lump 15,000.00 15,000.00 15,000.00 15,000.00 17,482.00 17,482.00    
716-01-A mulch (vegetative) 0.2    hctr 10,000.00 2,000.00 6,000.00 1,200.00 6,400.00 1,280.00    
717-01 seeding 7      kg 25.00 175.00 60.00 420.00 64.00 448.00    
718-01 fertilizer 168      kg 5.00 840.00 5.00 840.00 20.00 3,360.00    
725-04 low profile runaround 1      ea 25,000.00 25,000.00 41,000.00 41,000.00 33,000.00 33,000.00    
727-01 mobilization lump      lump 36,000.00 36,000.00 30,000.00 30,000.00 25,000.00 25,000.00    
729-16-C object marker assembly (type 3) 8      ea 100.00 800.00 90.00 720.00 140.00 1,120.00    
740-01 construction layout lump      lump 7,000.00 7,000.00 15,000.00 15,000.00 9,000.00 9,000.00    
744-01 traffic control management lump      lump 12,500.00 12,500.00 15,000.00 15,000.00 26,000.00 26,000.00    
804-01-B precast concrete piles (350 mm) 244.8    ln m 180.00 44,064.00 272.18 66,629.66 196.00 47,980.80    
804-12 loading permanent piles 1      ea 1.00 1.00 500.00 500.00 100.00 100.00    
805-10-A bridge superstructure & substructure (7.3m clr rdwy;
90 degree crossing)
3      span 26,000.00 78,000.00 23,000.00 69,000.00 29,000.00 87,000.00    
S-101 concrete approach slabs(7.3 m clear roadway;90 degree
crossing)
2      ea 8,500.00 17,000.00 10,000.00 20,000.00 10,000.00 20,000.00    
                       
 CONTRACTOR TOTAL       374,893.60   395,068.16   396,285.08    