| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - F. MILLER CONSTRUCTION LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 3+000-6.18m x 11.89m timber
bridge with conc. deck & wingwalls) |
1   |
ea |
12,000.00 |
12,000.00 |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
25,000.00 |
25,000.00 |
19,000.00 |
19,000.00 |
6,800.00 |
6,800.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
90   |
ea |
0.00 |
0.00 |
10.00 |
900.00 |
38.00 |
3,420.00 |
|
|
| 204-03 |
temporary slope drains
|
20   |
ln m |
0.00 |
0.00 |
30.00 |
600.00 |
114.00 |
2,280.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
ea |
0.00 |
0.00 |
125.00 |
500.00 |
132.00 |
528.00 |
|
|
| 204-06 |
temporary silt fencing
|
25   |
ln m |
0.00 |
0.00 |
10.00 |
250.00 |
60.00 |
1,500.00 |
|
|
| 302-01 |
class ii base course
|
149.2 |
cu m |
110.00 |
16,412.00 |
110.00 |
16,412.00 |
53.00 |
7,907.60 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
12   |
cu m |
100.00 |
1,200.00 |
120.00 |
1,440.00 |
228.00 |
2,736.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
136.4 |
Mg |
275.00 |
37,510.00 |
225.00 |
30,690.00 |
391.00 |
53,332.40 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
195.00 |
5,943.60 |
200.00 |
6,096.00 |
257.00 |
7,833.36 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
30.48 |
ln m |
100.00 |
3,048.00 |
100.00 |
3,048.00 |
129.00 |
3,931.92 |
|
|
| 711-01-C |
riprap (15 kg, 360mm)
|
255   |
sq m |
75.00 |
19,125.00 |
85.00 |
21,675.00 |
95.00 |
24,225.00 |
|
|
| 711-04 |
geotextile fabric
|
255   |
sq m |
5.00 |
1,275.00 |
4.50 |
1,147.50 |
4.00 |
1,020.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
17,482.00 |
17,482.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.2 |
hctr |
10,000.00 |
2,000.00 |
6,000.00 |
1,200.00 |
6,400.00 |
1,280.00 |
|
|
| 717-01 |
seeding
|
7   |
kg |
25.00 |
175.00 |
60.00 |
420.00 |
64.00 |
448.00 |
|
|
| 718-01 |
fertilizer
|
168   |
kg |
5.00 |
840.00 |
5.00 |
840.00 |
20.00 |
3,360.00 |
|
|
| 725-04 |
low profile runaround
|
1   |
ea |
25,000.00 |
25,000.00 |
41,000.00 |
41,000.00 |
33,000.00 |
33,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
36,000.00 |
36,000.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
100.00 |
800.00 |
90.00 |
720.00 |
140.00 |
1,120.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
7,000.00 |
7,000.00 |
15,000.00 |
15,000.00 |
9,000.00 |
9,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
12,500.00 |
12,500.00 |
15,000.00 |
15,000.00 |
26,000.00 |
26,000.00 |
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
244.8 |
ln m |
180.00 |
44,064.00 |
272.18 |
66,629.66 |
196.00 |
47,980.80 |
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
1.00 |
1.00 |
500.00 |
500.00 |
100.00 |
100.00 |
|
|
| 805-10-A |
bridge superstructure & substructure (7.3m clr rdwy;
90 degree crossing) |
3   |
span |
26,000.00 |
78,000.00 |
23,000.00 |
69,000.00 |
29,000.00 |
87,000.00 |
|
|
| S-101 |
concrete approach slabs(7.3 m clear roadway;90 degree
crossing) |
2   |
ea |
8,500.00 |
17,000.00 |
10,000.00 |
20,000.00 |
10,000.00 |
20,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
374,893.60 |
|
395,068.16 |
|
396,285.08 |
|
|
|