| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - GUINN BROTHERS, LLC. |
- 4 - F. MILLER CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
37,000.00 |
37,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 202-02-A-01 |
removal of bridge(sta. 105+19.28;20.20' x 39.00'
timber bridge0 |
1   |
EACH |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-02 |
removal of bridge(sta. 105+38.53;26.40' x 76.80'
timber bridge0 |
1   |
EACH |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
16   |
SQYD |
200.00 |
3,200.00 |
15.00 |
240.00 |
100.00 |
1,600.00 |
45.00 |
720.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
40,000.00 |
40,000.00 |
51,000.00 |
51,000.00 |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
| 204-02 |
temporary hay or straw bales
|
40   |
EACH |
10.00 |
400.00 |
5.00 |
200.00 |
0.00 |
0.00 |
13.00 |
520.00 |
| 204-03 |
temporary slope drains
|
50   |
LNFT |
25.00 |
1,250.00 |
5.00 |
250.00 |
0.00 |
0.00 |
30.00 |
1,500.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
500.00 |
4,000.00 |
75.00 |
600.00 |
0.00 |
0.00 |
165.00 |
1,320.00 |
| 204-06 |
temporary silt fencing
|
600   |
LNFT |
3.00 |
1,800.00 |
3.00 |
1,800.00 |
4.00 |
2,400.00 |
3.00 |
1,800.00 |
| 302-01 |
class ii base course
|
78.6 |
CUYD |
150.00 |
11,790.00 |
125.00 |
9,825.00 |
115.00 |
9,039.00 |
110.00 |
8,646.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
17   |
CUYD |
250.00 |
4,250.00 |
200.00 |
3,400.00 |
125.00 |
2,125.00 |
135.00 |
2,295.00 |
| 502-01 |
superpave asphaltic concrete
|
126.7 |
TON |
200.00 |
25,340.00 |
300.00 |
38,010.00 |
328.00 |
41,557.60 |
450.00 |
57,015.00 |
| 509-01 |
cold planing asphaltic pavement
|
230   |
SQYD |
10.00 |
2,300.00 |
60.00 |
13,800.00 |
40.00 |
9,200.00 |
72.00 |
16,560.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 13   |
CUYD |
0.01 |
- 0.13 |
1.00 |
- 13.00 |
0.00 |
0.00 |
5.00 |
- 65.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
60   |
LNFT |
85.00 |
5,100.00 |
50.00 |
3,000.00 |
90.00 |
5,400.00 |
64.00 |
3,840.00 |
| 706-01-A |
concrete walk (4" thick)
|
2.5 |
SQYD |
500.00 |
1,250.00 |
250.00 |
625.00 |
500.00 |
1,250.00 |
300.00 |
750.00 |
| 707-01-A |
concrete curb(special barrier type)(w/ reinforcing)
|
244.9 |
LNFT |
55.00 |
13,469.50 |
60.00 |
14,694.00 |
50.00 |
12,245.00 |
25.00 |
6,122.50 |
| 711-01-C |
riprap (30 lb,14" thick)
|
1,246   |
SQYD |
60.00 |
74,760.00 |
90.00 |
112,140.00 |
80.00 |
99,680.00 |
60.00 |
74,760.00 |
| 711-04 |
geotextile fabric
|
1,246   |
SQYD |
3.00 |
3,738.00 |
3.00 |
3,738.00 |
5.00 |
6,230.00 |
3.00 |
3,738.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
18,000.00 |
18,000.00 |
30,000.00 |
30,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.50 |
ACRE |
1,500.00 |
750.00 |
3,500.00 |
1,750.00 |
5,000.00 |
2,500.00 |
2,500.00 |
1,250.00 |
| 717-01 |
seeding
|
22   |
LB |
100.00 |
2,200.00 |
50.00 |
1,100.00 |
50.00 |
1,100.00 |
25.00 |
550.00 |
| 718-01 |
fertilizer
|
500   |
LB |
1.00 |
500.00 |
2.50 |
1,250.00 |
4.00 |
2,000.00 |
2.00 |
1,000.00 |
| 724-02 |
pavement widening
|
76.1 |
SQYD |
100.00 |
7,610.00 |
100.00 |
7,610.00 |
110.00 |
8,371.00 |
150.00 |
11,415.00 |
| 726-01 |
bedding material
|
134.3 |
CUYD |
100.00 |
13,430.00 |
125.00 |
16,787.50 |
120.00 |
16,116.00 |
130.00 |
17,459.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
12,500.00 |
12,500.00 |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
90,000.00 |
90,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
75.00 |
300.00 |
70.00 |
280.00 |
100.00 |
400.00 |
90.00 |
360.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
85.00 |
340.00 |
120.00 |
480.00 |
110.00 |
440.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
12,500.00 |
12,500.00 |
12,000.00 |
12,000.00 |
6,000.00 |
6,000.00 |
36,000.00 |
36,000.00 |
| 804-01-C |
precast concrete piles (16")
|
1,200   |
LNFT |
65.00 |
78,000.00 |
86.00 |
103,200.00 |
75.00 |
90,000.00 |
69.86 |
83,832.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
500.00 |
500.00 |
1.00 |
1.00 |
100.00 |
100.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
24.57 |
CUYD |
1,500.00 |
36,855.00 |
1,200.00 |
29,484.00 |
1,500.00 |
36,855.00 |
875.00 |
21,498.75 |
| 805-10-A |
bridge superstructure & substructure(90 degree
crossing;24'clear rdwy. w/ sidewalk(c.i.p.) |
5   |
SPAN |
27,000.00 |
135,000.00 |
27,500.00 |
137,500.00 |
28,000.00 |
140,000.00 |
55,000.00 |
275,000.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
126.0 |
LNFT |
700.00 |
88,200.00 |
725.00 |
91,350.00 |
875.00 |
110,250.00 |
600.00 |
75,600.00 |
| 806-01 |
deformed reinforcing steel
|
1,854   |
LB |
3.00 |
5,562.00 |
3.00 |
5,562.00 |
5.50 |
10,197.00 |
1.40 |
2,595.60 |
| S-101 |
concrete approach slab(24'roadway,90 degree
crossing,tapered barrier rails and sidewalk w/ railing) |
2   |
EACH |
9,000.00 |
18,000.00 |
12,000.00 |
24,000.00 |
12,500.00 |
25,000.00 |
12,320.00 |
24,640.00 |
| |
railing) |
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
686,355.37 |
|
778,022.50 |
|
798,996.60 |
|
904,261.85 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
PETERS CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
21,000.00 |
21,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta. 105+19.28;20.20' x 39.00'
timber bridge0 |
1   |
EACH |
4,500.00 |
4,500.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta. 105+38.53;26.40' x 76.80'
timber bridge0 |
1   |
EACH |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
16   |
SQYD |
10.00 |
160.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
40   |
EACH |
8.00 |
320.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
50   |
LNFT |
6.00 |
300.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
50.00 |
400.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
600   |
LNFT |
3.00 |
1,800.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
78.6 |
CUYD |
63.00 |
4,951.80 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
17   |
CUYD |
50.00 |
850.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
126.7 |
TON |
250.00 |
31,675.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
230   |
SQYD |
12.00 |
2,760.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 13   |
CUYD |
FREE |
FREE |
|
|
|
|
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
60   |
LNFT |
50.00 |
3,000.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
2.5 |
SQYD |
100.00 |
250.00 |
|
|
|
|
|
|
| 707-01-A |
concrete curb(special barrier type)(w/ reinforcing)
|
244.9 |
LNFT |
35.00 |
8,571.50 |
|
|
|
|
|
|
| 711-01-C |
riprap (30 lb,14" thick)
|
1,246   |
SQYD |
50.00 |
62,300.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
1,246   |
SQYD |
1.60 |
1,993.60 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.50 |
ACRE |
1,000.00 |
500.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
22   |
LB |
6.00 |
132.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
500   |
LB |
1.00 |
500.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening
|
76.1 |
SQYD |
50.00 |
3,805.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
134.3 |
CUYD |
50.00 |
6,715.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
80.00 |
320.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
1,200   |
LNFT |
67.00 |
80,400.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
24.57 |
CUYD |
900.00 |
22,113.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure(90 degree
crossing;24'clear rdwy. w/ sidewalk(c.i.p.) |
5   |
SPAN |
40,000.00 |
200,000.00 |
|
|
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
126.0 |
LNFT |
565.00 |
71,190.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,854   |
LB |
1.00 |
1,854.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slab(24'roadway,90 degree
crossing,tapered barrier rails and sidewalk w/ railing) |
2   |
EACH |
11,000.00 |
22,000.00 |
|
|
|
|
|
|
| |
railing) |
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
IRREGULAR |
|
|
|
|
|
|
|