| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - AMERICAN CONTRACTING & SERVICES,INC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-G |
removal of surfacing & stabilized base
|
3,322.9 |
SQYD |
12.00 |
39,874.80 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
970   |
LNFT |
7.00 |
6,790.00 |
|
|
|
|
|
|
| 202-02-I |
removal of portion of existing approach slab
|
108   |
SQYD |
100.00 |
10,800.00 |
|
|
|
|
|
|
| 202-02-01 |
removal of portion of existing bridge, deck, rail &
abutment |
2   |
EACH |
155,000.00 |
310,000.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
41,000.00 |
41,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
75.00 |
1,200.00 |
|
|
|
|
|
|
| 204-04 |
temporary sediment basins
|
2   |
EACH |
650.00 |
1,300.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
EACH |
350.00 |
700.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,988.7 |
TON |
115.00 |
343,700.50 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
5,568   |
SQYD |
6.00 |
33,408.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,784   |
CUYD |
1.00 |
- 2,784.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
800.0 |
LNFT |
18.00 |
14,400.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
|
|
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
1,110   |
SQYD |
65.00 |
72,150.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
4.661 |
MILE |
800.00 |
3,728.80 |
|
|
|
|
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
80   |
EACH |
1,200.00 |
96,000.00 |
|
|
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
225   |
EACH |
500.00 |
112,500.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.00 |
ACRE |
1,300.00 |
1,300.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
30   |
LB |
32.00 |
960.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
1,000   |
LB |
1.25 |
1,250.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
355,000.00 |
355,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
|
|
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
264   |
EACH |
13.00 |
3,432.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
234   |
EACH |
6.00 |
1,404.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.074 |
MILE |
2,650.00 |
5,496.10 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.036 |
MILE |
850.00 |
880.60 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
75,000.00 |
75,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
440   |
LNFT |
72.00 |
31,680.00 |
|
|
|
|
|
|
| 804-01-F |
precast concrete piles (24")
|
1,900   |
LNFT |
138.00 |
262,200.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
18,400.00 |
18,400.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
100.06 |
CUYD |
1,300.00 |
130,078.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
285.90 |
CUYD |
1,100.00 |
314,490.00 |
|
|
|
|
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
1,185.0 |
LNFT |
150.00 |
177,750.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
55,468   |
LB |
1.00 |
55,468.00 |
|
|
|
|
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
27,120   |
LB |
2.50 |
67,800.00 |
|
|
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
65,000.00 |
65,000.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
1,346.67 |
LNFT |
80.00 |
107,733.60 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
303.18 |
SQYD |
225.00 |
68,215.50 |
|
|
|
|
|
|
| S-101 |
hydro-demolition
|
15,600   |
SQFT |
20.00 |
312,000.00 |
|
|
|
|
|
|
| S-102-A |
furnishing latex modified cement concrete - very early
strength (2 1/2" depth) |
120.37 |
CUYD |
1,200.00 |
144,444.00 |
|
|
|
|
|
|
| S-102-B |
placing and finishing latex modified concrete - very
early strength overlay |
1,733.33 |
SQYD |
45.00 |
77,999.85 |
|
|
|
|
|
|
| S-103 |
cleaning of bearing areas at end bents
|
lump |
LUMP |
3,100.00 |
3,100.00 |
|
|
|
|
|
|
| S-104-A |
full depth deck patching (25.0 sq. ft. and under)
|
800   |
SQFT |
30.00 |
24,000.00 |
|
|
|
|
|
|
| S-104-B |
full depth deck patching (25.1 sq. ft. and over)
|
156   |
SQFT |
30.00 |
4,680.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
3,553,349.75 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
600,000.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|