Letting of 12/13/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 450-05-0042
Parish: LAFAYETTE
Routes: I-10
Description: INTERCHANGE LIGHTING - I-10 AT LA 93 (SCOTT)
Type Const: lighting and related work
Estimated Construction Cost: $526,924.50
 
RankLicenseBidderConstruction Bid
1 01165 ERNEST P. BREAUX ELECTRICAL, INC. $639,797.65
2 01692 TOOMER ELECTRICAL CO., INC. $651,652.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
ERNEST P. BREAUX ELECTRICAL, INC.
- 2 -
TOOMER ELECTRICAL CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 300      CUYD 30.00 9,000.00 27.50 8,250.00        
701-10-G reinforced concrete pipe (extension)(18") 8      LNFT 210.00 1,680.00 192.50 1,540.00        
701-15 concrete collar 1      EACH 1,444.00 1,444.00 1,320.00 1,320.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 150.0    LNFT 36.00 5,400.00 38.50 5,775.00        
704-03 blocked out guard rail 1,150.0    LNFT 20.40 23,460.00 19.80 22,770.00        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
1.0    LNFT 240.00 240.00 70.00 70.00        
704-11-B guard rail end treatment (tangent) 4      EACH 3,000.00 12,000.00 2,475.00 9,900.00        
706-03-A incidental concrete paving (4" thick) 1,791.0    SQYD 52.80 94,564.80 48.50 86,863.50        
713-01 temporary signs & barricades lump      LUMP 5,694.00 5,694.00 4,275.00 4,275.00        
727-01 mobilization lump      LUMP 5,367.00 5,367.00 32,000.00 32,000.00        
729-16-C object marker assembly (type 3) 4      EACH 102.00 408.00 82.50 330.00        
730-01 trenching and backfilling 5,980      LNFT 5.04 30,139.20 2.30 13,754.00        
730-02-A conduit with conductors (2" galvanized rigid steel;
3#2)
100      LNFT 13.05 1,305.00 23.00 2,300.00        
730-02-B conduit with conductors (2" schedule 40 pvc; 3#2) 100      LNFT 8.97 897.00 13.86 1,386.00        
730-02-C conduit with conductors (1-1/2" schedule 40 pvc; 2#6,
2#8, 1#6 bare)
150      LNFT 6.59 988.50 8.66 1,299.00        
730-02-D conduit with conductors (1-1/4" schedule 40 pvc; 2#6,
1#6 bare)
125      LNFT 4.81 601.25 7.46 932.50        
730-02-E conduit with conductors (2" schedule 40 pvc; 2#2, 2#8,
1#2 bare)
2,400      LNFT 10.29 24,696.00 10.72 25,728.00        
730-02-F conduit with conductors (1-1/2" schedule 40 pvc; 2#2,
1#2 bare)
1,200      LNFT 8.27 9,924.00 8.54 10,248.00        
730-02-G conduit with conductors (1-1/4" schedule 40 pvc; 2#8,
1#8 bare)
2,550      LNFT 3.93 10,021.50 4.08 10,404.00        
730-02-H conduit with conductors (1-1/4" schedule 40 pvc; 3#8) 800      LNFT 4.06 3,248.00 4.28 3,424.00        
730-02-I conduit with conductors (1-1/4" galvanized rigid steel;
3#8)
20      LNFT 8.29 165.80 15.84 316.80        
730-02-J conduit with conductors (1" rigid aluminum conduit;
3#10)
300      LNFT 18.45 5,535.00 9.11 2,733.00        
730-02-K conduit with conductors (1" liquid tight flexible
aluminum, 3#10)
20      LNFT 9.90 198.00 13.80 276.00        
730-02-L conduit with conductors (3/4" liquid tight flexible
aluminum, 3#10)
20      LNFT 9.90 198.00 12.70 254.00        
730-04 jacked or bored casing (6" schedule 80 pvc conduit) 600      LNFT 12.11 7,266.00 31.54 18,924.00        
730-05-A light pole (40 ft, alum., break. base, conc. mow.
apron, jct. box, no arm)
14      EACH 4,281.00 59,934.00 3,626.00 50,764.00        
730-06-A high mast pole (130 ft, steel, 6 luminaire ring, jct.
box, lowering device)
4      EACH 51,525.00 206,100.00 46,600.00 186,400.00        
730-07-A luminaire (1000 w, hps, type ii, med., lg. & narr,
non-cutoff dist., prot. starter, double fusing,
grey, with lamp)
24      EACH 815.00 19,560.00 1,255.00 30,120.00        
730-07-B luminaire (250 watt, hps, type ii, med., non-cutoff
dist., pole top tenon, prot. start., dbl. fusing,
grey, with lamp)
14      EACH 670.00 9,380.00 867.00 12,138.00        
730-07-C luminaire (100 watt, hps, underpass, wall mount,
protected starter, double fusing, grey, w/lamp)
4      EACH 800.00 3,200.00 982.00 3,928.00        
730-08 electrical service point (pedestal) 2      EACH 9,900.00 19,800.00 11,995.00 23,990.00        
730-16-A underground junction box (11"x18") 8      EACH 440.00 3,520.00 425.00 3,400.00        
730-16-B underground junction box (13"x24") 12      EACH 513.00 6,156.00 490.00 5,880.00        
730-17-A structure junction box (8"x8"x4") 11      EACH 600.00 6,600.00 882.00 9,702.00        
740-01 construction layout lump      LUMP 1,915.00 1,915.00 5,775.00 5,775.00        
744-01 traffic control management lump      LUMP 9,054.00 9,054.00 7,510.00 7,510.00        
S-001 modular breakaway cable system (low mast) 14      EACH 1,890.00 26,460.00 1,970.00 27,580.00        
S-002 circuit breaker disconnect (underpass) 1      EACH 1,650.00 1,650.00 2,540.00 2,540.00        
S-003 underground duct marker (concrete) 12      EACH 152.00 1,824.00 370.00 4,440.00        
S-004 marker tape (underground) 6,580      LNFT 0.42 2,763.60 0.85 5,593.00        
S-005 storm water catch basin (cb-62, type v) and related
work
lump      LUMP 7,440.00 7,440.00 6,820.00 6,820.00        
                       
 CONTRACTOR TOTAL       639,797.65   651,652.80        