Letting of 12/13/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 251-02-0042
Parish: W FELICIANA
Routes: LA 66
Description: BRIDGES AT OPOSSUM HOLLOW & SIKE BRANCH
Type Const: grading, drainage structures, class ii base course, lime treatment, superpave asphaltic
concrete pavement, concrete slab span and concrete girder bridges, and related work.
Estimated Construction Cost: $6,503,254.92
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $7,288,262.45
2 34567 JAMES CONSTRUCTION GROUP LLC $7,449,369.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
JAMES CONSTRUCTION GROUP LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100,000.00 100,000.00 400,000.00 400,000.00        
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 8,000.00 8,000.00        
202-02-A-01 removal of bridges (sta. 409+00; 28' x 114') 1      EACH 100,000.00 100,000.00 130,000.00 130,000.00        
202-02-A-02 removal of bridges (sta. 510+00; 27.5' x 133') 1      EACH 120,000.00 120,000.00 175,000.00 175,000.00        
202-02-G removal of surfacing & stabilized base 2,357.9    SQYD 7.00 16,505.30 7.00 16,505.30        
203-01 general excavation 3,600      CUYD 6.00 21,600.00 12.00 43,200.00        
203-02 drainage excavation 16,739      CUYD 14.00 234,346.00 12.00 200,868.00        
203-04 embankment 2,703      CUYD 16.50 44,599.50 12.00 32,436.00        
204-05-A temporary sediment check dams (hay) 147      EACH 100.00 14,700.00 30.00 4,410.00        
204-05-B temporary sediment check dams (stone) 7      EACH 500.00 3,500.00 300.00 2,100.00        
204-06 temporary silt fencing 3,716      LNFT 4.00 14,864.00 3.00 11,148.00        
302-02-A class ii base course (6" thick) 1,538.2    SQYD 34.00 52,298.80 32.00 49,222.40        
302-02-D class ii base course (12" thick) 2,829.5    SQYD 42.00 118,839.00 55.00 155,622.50        
304-01 lime 36.08   TON 220.00 7,937.60 130.00 4,690.40        
304-04-D lime treatment (type d) (12" thick) 2,545      SQYD 15.00 38,175.00 10.00 25,450.00        
305-01-D subgrade layer (12" thick) 2,545      SQYD 20.00 50,900.00 22.00 55,990.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
27      CUYD 200.00 5,400.00 120.00 3,240.00        
402-01 traffic maintenance aggregate (vehicular measurement) 30.0    CUYD 200.00 6,000.00 110.00 3,300.00        
502-01 superpave asphaltic concrete 725.0    TON 100.00 72,500.00 100.00 72,500.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
137.1    TON 120.00 16,452.00 150.00 20,565.00        
701-06-B side drain pipe arch (18" equiv.) 36      LNFT 60.00 2,160.00 60.00 2,160.00        
701-06-D-01 side drain pipe arch (24" equiv.)(erosion) 100      LNFT 75.00 7,500.00 80.00 8,000.00        
701-06-E side drain pipe arch (30" equiv.) 24      LNFT 98.00 2,352.00 85.00 2,040.00        
702-08-A side drain safety end (type 1) 1.0    ea 3,500.00 3,500.00 2,200.00 2,200.00        
704-03 blocked out guard rail 300.0    LNFT 22.00 6,600.00 18.00 5,400.00        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 60.00 12,000.00 50.00 10,000.00        
704-11-A guard rail end treatment (flared) 8      EACH 2,500.00 20,000.00 1,850.00 14,800.00        
708-01 right-of-way monument 21      EACH 200.00 4,200.00 200.00 4,200.00        
708-02 right-of-way monument witness post 21      EACH 200.00 4,200.00 200.00 4,200.00        
711-01-C riprap (30 lb, 6" thick) 29      SQYD 60.00 1,740.00 38.00 1,102.00        
711-01-D riprap (55 lb, 24" thick) 3,800      SQYD 81.50 309,700.00 74.00 281,200.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 70,000.00 70,000.00        
713-05-A temporary pavement markings (solid line)(4" width) 2.312  MILE 2,500.00 5,780.00 700.00 1,618.40        
713-08 temporary precast concrete barrier (contractor
furnished)
400      EACH 300.00 120,000.00 900.00 360,000.00        
713-09 temporary precast concrete barrier (department
furnished)
400      EACH 100.00 40,000.00 350.00 140,000.00        
716-01-A mulch (vegetative) 1.00   ACRE 2,000.00 2,000.00 1,200.00 1,200.00        
717-01 seeding 397      LB 10.00 3,970.00 8.00 3,176.00        
718-01 fertilizer 9,261      LB 0.50 4,630.50 0.50 4,630.50        
720-01-A erosion control system, slope protection (type a) 2,150      SQYD 1.75 3,762.50 3.00 6,450.00        
720-01-C erosion control system, flexible channel liner (type c) 443      SQYD 3.50 1,550.50 3.50 1,550.50        
720-01-D erosion control system, flexible channel liner (type d) 438      SQYD 3.50 1,533.00 5.00 2,190.00        
720-01-E erosion control system, flexible channel liner (type e) 1,000      SQYD 5.00 5,000.00 7.00 7,000.00        
720-01-F erosion control system, flexible channel liner (type f) 29      SQYD 5.00 145.00 12.00 348.00        
722-01 project site laboratory 2      EACH 2,000.00 4,000.00 6,000.00 12,000.00        
725-02 temporary detour roads 8,602.4    SQYD 110.00 946,264.00 80.00 688,192.00        
726-01 bedding material 8.3    CUYD 150.00 1,245.00 100.00 830.00        
727-01 mobilization lump      LUMP 700,000.00 700,000.00 720,000.00 720,000.00        
729-16-C object marker assembly (type 3) 8      EACH 100.00 800.00 75.00 600.00        
731-01 nonreflectorized raised pavement markers 20      EACH 15.00 300.00 12.00 240.00        
731-02 reflectorized raised pavement markers 89      EACH 15.00 1,335.00 10.00 890.00        
732-02-A plastic pavement striping (solid line) (4" width) 2.620  MILE 4,000.00 10,480.00 2,500.00 6,550.00        
740-01 construction layout lump      LUMP 170,000.00 170,000.00 160,000.00 160,000.00        
744-01 traffic control management lump      LUMP 40,000.00 40,000.00 8,000.00 8,000.00        
804-01-C precast concrete piles (16") 4,536      LNFT 70.00 317,520.00 65.00 294,840.00        
804-01-F precast concrete piles (24") 4,900      LNFT 118.00 578,200.00 120.00 588,000.00        
805-01-F class a concrete (bents) 308.93   CUYD 1,500.00 463,395.00 800.00 247,144.00        
805-03 class aa concrete 842.86   CUYD 900.00 758,574.00 550.00 463,573.00        
805-08-H precast-prestressed concrete girders (type quad beam) 1,896.0    LNFT 100.00 189,600.00 75.00 142,200.00        
806-01 deformed reinforcing steel 239,777      LB 0.75 179,832.75 0.80 191,821.60        
807-06 structural metalwork lump      LUMP 20,000.00 20,000.00 15,000.00 15,000.00        
810-01 concrete railing (barrier) 800.00   LNFT 65.00 52,000.00 60.00 48,000.00        
813-01 concrete approach slabs 1,068.88   SQYD 200.00 213,776.00 200.00 213,776.00        
S-001 temporary construction sheeting lump      LUMP 830,000.00 830,000.00 1,200,000.00 1,200,000.00        
S-101 impact attenuators (construction zone) 4      EACH 25,000.00 100,000.00 25,000.00 100,000.00        
                       
 CONTRACTOR TOTAL       7,288,262.45   7,449,369.60        